HomeMy WebLinkAboutNCC192463_Annual Fee NOD Letter (2024 Fee)_20241116 ROY COOPER
Governor
MARY PENNY KELLEY �..
secretary
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
lnterkm Dhemctar EnvUanmentorQuarrty
11/16/2024
Teramore Construction
Attn:Zach Crumley
PO Box 6460
Thomasville, GA 31757
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC192463-2024
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 10/1/2024 and was due on 11/1/2024.The annual fee applies to the following construction site:
Dollar General Salisbury Store#21350
Heilig Road, Salisbury, NC
Rowan County
Certificate of Coverage No. NCC192463
NC Reference No. NCG01-2019-2463
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Kieu Tran at kieu.tran@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
D_E Q� M-h C-4—Dr•�a,—,n1 Cn.r--td Q� Hl DM,i,r� Cnrry \lm-1 and Lund Rr,--
SU N.r1h SA,but,Sheet I I o12?0.11 5---C-1,, 0.ekgh.Nv O,Cut 1,-2ie99;612
+-� •---� 919.7079200