HomeMy WebLinkAboutNCC232972_Annual Fee NOD Letter (2024 Fee)_20241116 ROY COOPER
Governor
MARY PENNY KELLEY s�..
se"-y
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
lnterkm Dhemcmr Enrlronmentol Quultfy
11/16/2024
Riverside Woodfin Development, LLC
Attn: David Day
P.O. Box 549
Fairview, NC 28732-8101
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC232972-2024
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 10/1/2024 and was due on 11/1/2024.The annual fee applies to the following construction site:
West City View-Phase 1
Northbend drive,Woodfin, NC
Buncombe County
Certificate of Coverage No. NCC232972
NC Reference No. NCG01-2023-2972
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Kieu Tran at kieu.tran@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
D_E Q� M-h C-4—Dr•�a 1r 1 M Cn.rm�r td Q�:Wl DM,i,rt Cnrry Mm-1 and Lund Rr,rnr
SU N,tlh S,hb,t Sheet I Iol2-Mail 5e. Cerlet RAkgh.Nv0,Cut b-27e991612
+-� •---� 919.7079200