Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQCS00047_NOV-2024-DV-0446 Response to Notice_20241007
Docusign Envelope ID: CE6D59C9-EC24-4520-8305-3D448CECE2C2 NOV 7 2024 ���IiFRU 1P� Public works Department C�7111���7�f.M267.011 P. O. BOX 3729 TELEPHONE 919-777-1118 FAX 919-774-8179 North Carolina 27331-3729 or 919-777-1122 Victor I. Czar P.E. Assistant City Manager November 5, 2024 Vanessa Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ 3800 Barrett Drive Raleigh, NC 27609 RE: Notice of Violation NOV-2024-DV-0446 Permit No. WQCS00047 City of Sanford Collection System Lee County Dear Ms. Manuel: We are in receipt of the above referenced Notice of Violation, received October 17, 2024, which involved an overflow occurring September 16, 2024. The overflow took place during Tropical Storm Helene and was attributed to Severe Natural Condition. There are three projects in the area that should help this situation. (1) Little Buffalo Rehabilitation — Upper Reach, (2) East Sanford CDBG, (3) Third St area sewer Rehabilitation. Little Buffalo Rehabilitation — Upper Reach. This project is funded by a Clean Water State Revolving Fund loan of $3.8 million and will be used to upsize the existing sewer interceptor to 18 inches. The project map, Docusign Envelope ID. CE6D59C9-EC24-4520-B305-3D44$CECE2C2 titled "Little Buffalo Interceptor Rehabilitation Project" is attached. It is expected to upsize the line to Manhole 1960. This will increase the capacity of the interceptor downstream of the subject location. The project is being reviewed by the Division of Water Infrastructure. Once the City has DWI approval, it will be bid. We expect bidding to take place in November of this year. East Sanford CDBG This is a $ 2 million project that will cure -in -place line an area downstream of the subject location. This is expected to reduce inflow and infiltration which will increase the capacity of the existing interceptor. Construction is currently underway with a completion date of June 2025. Third Street area Sewer Rehabilitation This project will cure in place line an area including the subject location. Please see the attached exhibit labelled "Third Street Area Sewer Rehabilitation SSO/NOV". We believe this project will decrease inflow and infiltration and increase the available capacity of the line. The City received a Letter of Intent to Fund from the Division of Water Infrastructure this summer. We have started the procurement process for an engineer to assist us with the work. Should you have any questions, please feel free to contact me at any time. Sincerely, [DoeuSigned by, au[, k, MAS Y. P.-C. BBC39E6667844B9 Paul M. Weeks Jr., P.E. Executive Director of Utilities cc: Gerald Cox, Director of Distribution and Collection Systems � § 6� � § �. .... . t � - "N�� \tea)§ ? }\\\��- - � U < %. 0 Z a» \ - © 0 � Z 2 M �