Loading...
HomeMy WebLinkAboutNC0030473_2024CEI Response-Generator_20241115RE: Permit Renewal Form Erorn: Penny Hodge (millridgepoa@skybest.com) To: waterqualitylabs@yahoo.com Date: Thursday, October 31, 2024 at 1121 AM EDT Dear Jenna, We repaired the Diesel Generator on Oct 2, 2024 during Hurricane Helene and successfully ran our sewer and water system with Diesel Gas until we regained power on Oct 14. Necessary repairs included 225A Frame 175A Breaker Switch and a 4DLT 850 CCA Commercial Battery. The Generator is full of diesel and ready to go if needed. Thanks, Peter Mill Ridge POA 229 Clubhouse Drive Banner Elk, NC 28604 828-963-4900 / millridgepoa@skybest.com