1 Project Name Vedic Village
2 Project Area ac 214.79
3 Coastal Wetland Area ac 0
4 Surface Water Area ac 0.66
5 Is this project High or Law Density? Low
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided feet 30
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003 4 c-d ? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 linfiltration System
12 Bioretention Cell
13 Wet Pond
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter
17 Rainwater Harvesting RWH
18 Green Roof
19 Level Spreader-Filter Strip LS-FS
20 Disconnected Impervious Surface DIS
21 Treatment Swale
22 Dry Pond
23 Storm Filter
24 Silva Cell
25 lBayfilter
26 IFilterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: Dalton L Ward,PE
28 Organization: Hugh Creed Associates,Inc.,P.A.
29 Street address: 1306 W.Wendover Ave.
30 City,State,Zip: Greensboro,NC 27408
31 Phone numbers: 336-275-9826
32 Email: hca@hughcreedassociates.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete,and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
Signature of Designer
Seal Date
DRAINAGE AREAS
1 Is this a high density project? No
2 If so,number of drainage areas/SCMs 0
3 Does this project have low density areas? Yes
4 If so,number of low density drainage areas 1
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATIO Entire Site LD 1
4 Type of SCM N/A N/A
5 Total drainage area(sq ft 9,384,867 9384867
6 Onsite drainage area(sq ft 9384867 9384867
7 Offsite drainage area(sq ft 0 0
8 Total BUA in project(sq ft 127913 sf 127913 sf
New BUA on subdivided lots(subject to
9 ermitting)(sq ft 87000 sf 87000 sf
New BUA not on subdivided lots(subject to
10 ermittin sf 40913 sf 40913 sf
11 Offsite BUA(sq ft sf sf
12 Breakdown of new BUA not on subdivided lots:
Parking(sq ft sf sf
Sidewalk(sq ft sf sf
Roof(sq ft sf sf
Roadway s ft 40913 sf 40913 sf
Future(sq ft sf sf
Other,please specify in the comment box
below(sq ft
New infiltrating permeable pavement on
13 subdivided lots(sq ft sf sf
New infiltrating permeable pavement not on
14 Isubdivided lots(sq ft sf sf
Existing BUA that will remain(not subject to
15 ermitting)(sq ft sf sf
16 Existing BUA that is already permitted(sq ft sf sf
17 Existing BUA that will be removed(sq ft sf sf
18 Percent BUA 1% 1
19 Desi n storm inches N/A N/A
20 Design volume of SCM cu ft N/A N/A
21 Calculation method for design volume N/A N/A
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
LOW DENSITY
117,
DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H.1003
1 Is project below density thresholds set forth in the applicable stormwater rule? Yes
2 Does project maximize dispersed flow and minimize channelization of flow? Yes
3 Has the use of piping been minimized per.1003(2)(c)? Yes
4 Side slopes of the vegetated conveyances(H:V) 3 sf
5 Maximum velocity in the vegetated conveyances during the 10-year storm? 5
6 JAre curb outlet swales proposed? No
7 Maximum longitudinal slope of curb outlet swale(s)(%)
8 Bottom width of curb outlet swale(s)(feet)
9 Maximum side slope of curb outlet swale(s)(H:V)
10 Minimum length of curb outlet swale(s)(feet)
11 Are treatment swales used instead of curb outlet swales?
12 Is stormwater released at the edge of the setback as dispersed flow? Yes
13 1 Have stormwater outlets been designed to prevent downslope erosion?
14 JAre variations to rule.1003 proposed?
ADDITIONAL INFORMATION
15 iPlease use this space to provide any additional information about this low density project:
Swale Drainage BUA Pervious O Slope Vanaw Flow depth
# Area (ac) area C (cfs) N (fps) (fps) (ft)
ac ac
1 0.25 0.07 0.18 0.40 0.69 7.00 5.00 3.60 0.30
2 0.38 0.06 0.32 0.40 1.04 1.00 5.00 1.90 0.50
3 0.72 0.14 0.58 0.40 1.97 11.70 5.00 5.30 0.37
4 0.67 0.06 0.61 0.40 1.84 1.00 5.00 2.10 0.60
5 1.50 0.22 1.28 0.40 4.11 8.00 5.00 5.70 0.55
6 0.68 0.06 0.62 0.40 1.86 1.00 5.00 2.10 0.60
7 2.30 0.30 2.00 0.40 6.30 1.30 5.00 3.20 0.90
8 0.45 0.06 0.39 0.40 1.23 1.00 5.00 1.90 0.50
9 0.10 0.02 0.08 0.40 0.27 2.00 5.00 1.90 0.30
10 0.33 0.06 0.27 0.40 0.90 1.00 5.00 1.90 0.50
11 0.52 0.10 0.42 0.40 1.42 11.00 5.00 5.10 0.36
12 0.43 0.06 0.37 0.40 1.18 1.00 5.00 1.90 0.50
13 1.05 0.17 0.88 0.40 2.88 12.00 5.00 6.10 0.45
14 0.42 0.06 0.36 0.40 1.15 1.00 5.00 1.90 0.50
15 1.57 0.25 1.32 0.40 4.30 12.00 5.00 6.60 0.50
16 0.75 0.07 0.68 0.40 2.06 1.00 5.00 2.10 0.60
17 2.63 0.37 2.26 0.40 7.21 5.00 5.00 5.30 0.70
18 0.35 0.12 0.23 0.40 0.96 11.50 5.00 4.60 0.30
19 0.37 0.14 0.23 0.40 1.01 11.50 5.00 4.60 0.30
20 3.71 0.63 3.08 0.40 10.17 10.50 5.00 7.60 0.55
21 0.24 0.09 0.15 0.40 0.66 1.50 5.00 1 2.00 0.40
22 0.31 0.10 0.21 0.40 0.85 12.00 5.00 4.70 0.30
23 3.33 0.47 2.86 0.40 9.12 5.70 5.00 6.20 0.80
24 0.53 0.11 0.42 0.40 1 1.45 7.50 5.00 4.50 0.40
25 0.66 0.17 0.49 0.40 1.81 5.00 5.00 4.00 0.45
26 0.22 0.07 0.15 0.40 0.60 15.00 5.00 4.80 0.26
27 0.62 0.19 0.43 0.40 1.70 15.00 1 5.00 1 5.90 0.25
28 0.83 0.07 0.76 0.40 2.27 4.00 5.00 3.80 0.50
29 1.63 0.29 1.34 0.40 4.47 2.00 5.00 3.30 0.55
30 2.29 0.46 1.83 0.40 6.27 1.50 5.00 3.30 0.85
Drainage Pervious
Swale# Area BIJA area C Q Slope Vallow Vactual Flow
ac (ac) ac (cfs) M (fps) (fps) depth (ft)
31 0.31 0.12 0.19 0.40 0.85 3.50 5.00 2.80 0.35
32 1 0.32 0.12 0.20 0.40 0.88 12.00 1 5.00 4.70 0.30
33 0.43 0.14 0.29 0.40 1.18 12.00 5.00 5.20 0.35
34 0.66 0.10 0.56 0.40 1.81 12.00 5.00 4.90 0.21
35 1 2.83 0.67 2.16 0.40 7.75 13.50 5.00 7.30 0.35