Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQCS00047_Response to Notice_20241105
Docusign Envelope ID:CE6D59C9-EC24-4520-B305-3D448CECE2C2 gANEO e7lOrEAEB 1%11' Public Works Department CITY OF SANFORD P.O.BOX 3729 TELEPHONE 919-777-1118 FAX 919-774-8179 North Carolina 27331-3729 or 919-777-1122 Victor I.Czar P.E. Assistant City Manager November 5, 2024 Vanessa Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources,NCDEQ 3800 Barrett Drive Raleigh,NC 27609 RE: Notice of Violation NOV-2024-DV-0446 Permit No. WQCS00047 City of Sanford Collection System Lee County Dear Ms. Manuel: We are in receipt of the above referenced Notice of Violation, received October 17, 2024, which involved an overflow occurring September 16, 2024. The overflow took place during Tropical Storm Helene and was attributed to Severe Natural Condition. There are three projects in the area that should help this situation. (1) Little Buffalo Rehabilitation — Upper Reach, (2) East Sanford CDBG, (3) Third St area sewer Rehabilitation. Little Buffalo Rehabilitation—Upper Reach. This project is funded by a Clean Water State Revolving Fund loan of$3.8 million and will be used to upsize the existing sewer interceptor to 18 inches. The project map, Docusign Envelope ID:CE6D59C9-EC24-4520-B305-3D448CECE2C2 titled "Little Buffalo Interceptor Rehabilitation Project" is attached. It is expected to upsize the line to Manhole 1960. This will increase the capacity of the interceptor downstream of the subject location. The project is being reviewed by the Division of Water Infrastructure. Once the City has DWI approval, it will be bid. We expect bidding to take place in November of this year. East Sanford CDBG This is a $ 2 million project that will cure-in-place line an area downstream of the subject location. This is expected to reduce inflow and infiltration which will increase the capacity of the existing interceptor. Construction is currently underway with a completion date of June 2025. Third Street area Sewer Rehabilitation This project will cure in place line an area including the subject location. Please see the attached exhibit labelled "Third Street Area Sewer Rehabilitation SSO/NOV". We believe this project will decrease inflow and infiltration and increase the available capacity of the line. The City received a Letter of Intent to Fund from the Division of Water Infrastructure this summer. We have started the procurement process for an engineer to assist us with the work. Should you have any questions, please feel free to contact me at any time. Sincerely, EDocuSigned by: aul, M Nuks ,fir. P.f. BBC39E6667844B9... Paul M. Weeks Jr., P.E. Executive Director of Utilities cc: Gerald Cox, Director of Distribution and Collection Systems M• —_3 r LU W� E PUBLIC WORKS •' SEPVI(t CENTER S r •s ' � 300 600 900 •`• ` J 1 i i CITY O�ANFORD ` sae 1° = 300 • � • !j - MUNICIPAL CENTER r . RS pN - E Ux LITTLE BUFFALO INTERCEPTOR `MSI Z � }. �HPVE ?'K �► , .. �, . REPLACE EXISTING fr T14. _ LU D 12" SEWER WITH 18" SEWER , , \ M ME. �-r. . a •�- .. • �. O o� 4 M S� ti vER cp � Uj B � r cp Cp vE LLJ rn � : '-. . . ,, - j GOAD • ... � ..- 44 ZO *4k f Sy0 ~` a I , • • c �� R, ' ' -� '"` or ' '..j.• * :ci 2024 Microso poration D 024 Maxar©CNES(202 Distribution Airbus D Docusign Envelope ID:CE6D59C9-EC24-4520-B305-3D448CECE2C2 1 Legend zz ❑ SSO P M Fah @ Project Manholes(Black Labels) S ■ Addresses Experienced Sewage Backup Since 2019(Red Labels) °° Gravity Main S ^co ■113 1960 0-0-Project Sewer Lines 107 PJyL` ■804 B ■813 2009 1003� ♦ 2010 L 26-17 1011 ■ 1013 e 805 x SAo ■ 1017 13� Q°y 807 / , �� ■ 303 �a�; 2030 1hS� ■ ,�2056 12 hd CP 915 a v �sr 906 ■ �`�/� n U ■ 2057 v 2069 4 o v u c PP� N 1 a Q 3561 2099 ■1013 2096 l a 2109 2110 t oq' J 2127 2125 2134 Th'�as t 2148 2176 5 2177 o 2200 2185 SyOrne�e�t, ' a Sanford, NC 2199 2201 Third Street Area q, Sao � C>° Sewer Rehabilitation 2221 SSO/N OV 2238 aQ a� /0 2249 � %/ WithersRavenel Engineers I Planners I Surveyors 115 MacKenan Dr I Cary NC,27511 t:919.469.3340 This map is for informational purposes only.All feature Date Incident Number Location Manhole ID Gallons to Reach Surface Water Surface Water Impacted NOV ID NOV Date license#:F-1479 locations displayed are approximate based on available www.withersravenel.com 2/6/2020 #202000342 305East Rose St 2274 1680 Little Buffalo NOV-2020-DV-0198 5/4/2020 data sources. Data features are not based on professional 7/8/2021 #202101535 305 East Rose St 2274 960 Little Buffalo NOV-2021-DV-0337 8/10/2021 0 125 250 500 field survey unless stated otherwise. Sewer System data 8/12/2022 #202201293 305 East Rose St 2274 300 Little Buffalo NOV-2022-DV-0275 9/16/2022 Feet from WithersRavenel and City of Sanford v9/2024 #202400119 305 East Rose St 2274 270 1 Little Buffalo NOV-2024-DV-0084 2/13/2024 1 inch = 250 feet v12I2024 #202400289 1 305 East Rose St 1 2274 1 250 Little Buffalo NOV-2024-DV-0084 2/13/2024 a 115-005-Santord Spring 2U214 Sewer Sft Application or Ing an or ap an bu map.aprx rin e Date: rea e y:cnovoa