HomeMy WebLinkAboutNCG021049010 \ \ ` I I CONSTRUCTION, MAINTENANCE AND INSPECTION NOTES
o;rl
_ _ TOP OF BERM. ELEV 830.00
�2A-N 20' WIDTH 4
1. INSPECT SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT(1/2 4 1 �, j\///\\�/%\/!
F \ \ \ Cumulative Storage
- .
PIPE 2A-N SEE CULVERT � � I� � \ \�\ \ - . \ \ \ �
( \ \ X INCH OR GREATER RAINFALL EVENT AND REPAIR IMMEDIATELY.
DO C�
SUMMARY TABLE ON \ L ) \%�%i%\%\%�%�%\/ o ELEV 828.50
�\ \ 7 CHAINLINK FENCE I \ V'.A \ \ \ V 'W� % /i /` / / / / /
SHEET OOCP-006 \ \ V SEE DETAIL SHEET OOG-011V/VA��VA//VA//VA//VV//\�/VA�V�'V� �,.VA//VA//VA/VA//VA��A//VA//VA//VA/� 8,31.00
2. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT /jAA/jA/jA/jA/jA/jA/jA/jA/j� `//A
TOP OF BERM
�, ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. PLACED REMOVED SEDIMENT IN
RI PRAP SLOPEV/VA,/VA/VA/VA/VA/VA/VA/VA/VV/VA/�/VA/VA� �< �iVAiVAiVAVAiVAiVAiVAi\AiVAiVAiVAi�AiVAiVAi�,/VA/VA//VA/V�//VA/�,/VA/VA/VA/VA//VA/VA/VAS 830.00 30.00
�\ A � I �, AN AREA WITH SEDIMENT CONTROLS.
DOUBLE INLETS AT PROTECTION TYP. W
\ V ( ) \,ArVA��A/i��//i\//AA//AA//���/AA//AA//AA//AA%/AA//AA//i�//AA//A//AA/% //AAj/AA//A//AA//AA/AA//��//AAj/AA���A%AA%AA/�A/jAA�//i�/i�A��AA EMERGENCY
LOW POINT, PROVIDE \ \ SEE DETAIL SHEET OOG 009 �lVAV/VA/ /VA/VA��,/VA/VA,VA/VA/V/VA/V/V/V/ /V/�/V/V/V/V/V/V/V/V/V/V/
INLET PROTECTIONS V A \ �� I �, 3. CHECK EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND \/i�// //A//A//A// /A//A// //A// //AA// //AA//A//AA%/AA//A�//AAij�//AA//AA//AA//A�/��'`� 829.00 SPILLWAY 829.00
X /NOVA�VA�A� V�AAA AAA AAA AAA AAA�A� VA�A�AAA AAAV��A��A��AA���/�
DURING CONSTRUCTION \ I � � ` ', �� I INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY �.• 28.50
\ ,I
POROUS BAFFLES \ REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. SECTION B 828.00 PRINCIPAL 28-00
\ \
SEE DETAIL SHEET OOG-011 SPILLWAY
27.50
a i t 827.00 27.00
` \ i -.--- SILT FENCE \ D
- M ` \ -12 CLASS 1 RIP-RAP M CLEANOUT ELEV.
SEE DETAIL SHEET OOG-008 r \ >
ao I -T 826.00 .00- 826.25
\ EMERGENCY SPILLWAY NON-WOVEN GEOTEXTILE FABRIC-
ELEV. 828.50 1� 10', ELEV. 828.50 SEE DETAIL THIS SHEET O BETWEEN ALL SOIL AND RIP-RAP. - -COMPACTED FILL ON TOP OF 825.00 825.00
ANCHOR IN FABRIC BY RUNNING
VIRGIN SOIL WITH TOP SOIL
LIMIT OF DISTURBANCE ALONG FACE OF SPREADER LIP TO REMOVED.
/ \ n�n�n� - VIRGIN GROUND 824.00
PIPE 2B-N ( SEE CULVERT / \ TOP OF FOOTER. o - 1� f7, -ram o
SUMMARY TABLE ON ��\ 3:1 /////����\\�\\\/�\\��ii\Vi`ii�\ii\\V\i\\/i i�y��}����\/�\\��\\��\��\\,\ 3:1 ELEV: 827±
05) Pam\ PROPERTY BOUNDARY. POND D BOTTOM
o ��/ \ �\//�\///\\//�\/ //\\/�\\//�\/// jj\ \ \� / 823.00
SHEET OOG-\01 1 \
b V S B-202 \ O OT ��\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
ELEV: 825.00 /\\��\\//\\ \��\\/\//\/� \ \ \ �/ \�/i \ \� \\/\\�/\\//\\
OUTLET PROTECTION OP-202A, P \\ O �j j\/j\/jam//\/j\/jj/j\/j\/j\ij // /j\/j\/j\ \/j��\//\//\//\//\//\/�\//\//\,/ //\//\//\//\//,/,\//\ _ a 822.00 - -
\\ \\ \\,\\/\ \ \\/\\/\\/\\/\ \ \\/\\/\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\ o
SEE SUMMARY SHEET OOG-005 \ \/i\,/\/\//\ j/ //\//\//y/\//�// //\,/\//\//\// //\//\//\//\//\//\// //\//\//\//\//\//\//\//\//\//\i/\i/\i�//\//\//\//\//\//\ 0.00 0.23 0.30 0.51 0.66 0.82 0.99 1.17 1.56
\ - OUTLET PROTECTION OP-202
�' � v/v/v/v/w/ ��,/v/y/y/y/yiy/v/vivivw/yw/v/yiy/y/y/y��/v/vw��ww/vwiy/y/y/v/v/vw/v/.wiywww�.I Cumulative u I ative Storage (ac-ft)
SEE SUMMARY SHEET OOG-005 ----
TOP OF BERM ELEV. 830.00�� �\ KEY IN RIP-RAP KEY IN RIP-RAP
SECTION
ON
PROPOSED PLANT BOTTOM OF POND
ELEV. 825.00 ���
BUILDINGS \ ��, 48" OUTLET STRUCTURE WITH EMERGENCY w Basin Size
� � SKIMMER AND 50 LF OF 24" 0HP STORM , SPILLWAY LLWA T
-----------
Elev.
NOT TO SCALE 11 Depth Area(st) Curnla#ive Vor rrra(ac-fl)
DUAL WALL PIPE, ADS OR EQUIVALENT.
'\ SEE DETAILS THIS SHEET 825.00 0.00 9,393 0.00
° ` �� �\ _ \\�\� \\ 826.00 1.00 11,000 0.23
_X \�\ 826.25 1.25 11,411 0.34
�-
827.00 2.00 12 M 0.51
ARM ASSEMBLY
-- 827.50 2.50 13,518 0-66
- --- 1
r 828.00 3.00 1 ,3E3ta 0.82_ 8 .5Cb 3.50 15,207 0.'99
28 C
„C„ ENCLOSURE .Odd 4. 7`16,162 1.1
a
\� \\
830.00 5.00 17,E 1.56
BASIN ACCESS ROAD
a
I WATER ENTRY UNIT
PROPOSED ROAD PERSPECTIVE VIEW
- I i � 1
'" SEDIMENT BASIN 202 PRINCIPLE SPILLWAY
Sldmmer Design SB-M Vol(CrJ 10,170
30' STREAM BUFFER I INFORMATION
- -
DESIGN
PVC VENT SCHEDULE 40 Desired Skimmer Drawdown Time Mf 72 hrs
''�- ,--- x /-- PVC ELBOW PIPE Outlet: Sediment Basin 202 Principle Spillway, Dro Pi e
j - 1 I i I PVC END CAP - -�� / PVC PIPE Desim d Skimmer Drawdraw�n Rate (Qd) 3, felday pP P
LIMIT OF DISTURBANCE I _ �" Riser Top Elev: 827.50 ft
= � � _ PIPE DIAMETER
Skimmer Size 3.,0 in Riser Length: 4.0 ft
_P LAN VIEW WATER SURFACE - Head on O�fice (H)5 0.2 ,ft Orifice Coefficient: 0.60
Weir Coefficient: 3.1
SCALE: 1"=50' �> _ Culvert Length: 50.00 ft
50 0 50 100 °TIII � ��� , PVC END CAP
SCHEDULE 40 � C.;�Ic�uleted Ort�i�de 1�7hamel6er'' 1,7�l� irr Culvert Diameter: 24.00 in
Culvert Invert In: 824.50 ft
SCALE IN FEET 3" PVC PIPE
SEE TABLE FOR ! Orifice f7hameter� 1.750 in
PVC PIPE Culvert Friction Coefficient: 0.01
1 �2" HOLES IN
PIPE DIAMETER ! Skimmer Drawdown Ti1m7 169E hrs Culvert Entrance Loss Coefficient: 0.90
INSTALL COLLAR WITH CORRUGATIONS -CL CUTOFF TRENCH ALIGNS "
VERTICAL. COLLAR TO BE OF SAME GAGE WITH q EMBANKMENT PVC TEE UNDERSIDE x Discharge: 42.13 cfs
AS THE PIPE WITH WHICH IT IS USED. PVC TEE 1.75" ORIFICE PLATE Required Discharge: 37.20 cfs
--- _TT'
I I I I I I I I I I I I I I I I BAND - EXISTING GROUND ���--
�R
1/2 X 2 SLOTTED _ �'
_ .a_::. .
FILL MATERIAL F LLXIC �L NOTES,
HOLES 8" C.C. '
�2" I I I I L I @ 2' MINIMUM IF NOT HOSE - 1. ALL PVC PIPES ARE TO BE SCHEDULE 40 UNLESS
11 FOR 3/8"Q BOLTS CUT TO BEDROCK �� OTHERWISE NOTED.
2 - q ID 01 d of q OD OF PIPE ___.- _ _ - = _._..__._,.. __..__ ._..." ,., / 2. ALL JOINTS OF THE FLOTATION SECTION SHALL BE B
1 SOLVENT WELDED. JOINTS OF SKIMMER SECTION NEED
Id 1101 1101 � IQ 1101 I bl 1 ��
NOT BE WATER-TIGHT.
3. HDPE FLEXIBLE DRAIN PIPE IS TO BE ATTACHED TO THE
' 11 1 W END V
I I I I I I I I I I I �� � PIPE BARREL STRUCTURE WITH WATER-TIGHT
IIIIIII III 111111111 2' CONNECTIONS.
O N T V I W RISER_ BUOYANCY_CALCULATION
11 11 ONE PIECE CONNECTING 4. SKIMMER SIZES AND ORIFICE DIAMETERS ARE CALCULATED
BAND WELDED TO PIPE- --SUITABLIE EARTHEN BASED ON NCDEQ DESIGN METHODOLOGY AND WILL BE DEMONSTRATE ADEQUATE STABILITY BY SHOWING THE DOWNWARD FORCE IS A
W: 4` M I N. CONTINUOUS WELD BOTH MATERIAL COMPACTED TO SKIMMER REVIEWED AND APPROVED BY THE ENGINEER ONCE A MINIMUM OF 1.25 TIMES THE UPWARD FORCE.
1
SIDES OF BAND 95/o OF STANDARD SKIMMER SUPPLIER/MANUFACTURER HAS BEEN CHOSEN.
PROCTOR MAX. DRY NOT TO SCALE DOWNWARD FORCE (STRUCTURE WEIGHT) > 1.25 x UPWARD FORCE (BUOYANCY)
ANTI-SEEP COLLARS _CUT-OFF TRENCH DENSITY'WITHIN ±2%
NOT TO SCALE
OPTIMUM MOISTURE 48" SQUARE CONCRETE RISER
- NOT TO SCALE CONTENT TRASH RACK-- 1 O' TOP OF WEIGHT= 10,147 Ib
� SK:IMMER, SEE DETAIL RETRIEVAL ROPE ---- EMERGENCY SPILLWAY, SEE DETAIL THIS
ANCHORED IN BERM WIDTH SHEET WHERE:
THUS SHEET
U THE SLOPE
Q 48" CONCRETE -1' FREEBOARD
o RISER STRUCTURE MIN. V FREEBOARD RISER WEIGHT= 10,147 Ib
SEDIMENT - TOP OF BERM. ELEV 830.00
4'x4' (INSIDE-- d CLEANOUT WEIGHT OF CONCENTRATE BASE _ (LENGTH x WIDTH x DEPTH) x UNIT
DIMENSION) RISER "� - - WEIGHT OF CONCRETE
STRUCTURE GAGE -
--- - -- EMBANKMENT STABILIZED 0.5' DEPTH OF FLOW
\ANOUT
` - WEIGHT OF CONCRETE BASE _ (7.0 ft x 7.0 ft x 1.5 ft)x 150 Ib/ft3= 11,025 Ib
CONCRETE-- SEDIMENT
ELEVCLE 826.25 0°❑�❑° �o°0o oo°❑°❑°❑ RSRCRSTE 50
°❑o I E E L V. 7. A \��`���
E 82
BASE \` - a a -- _ ��\� STRUCTURE WEIGHT= 10,147 Ib + 11,025 Ib= 21,172 Ib
a a a a � � � �
WITH VEGETATION BUOYANCY = DISPLACEMENT VOLUME OF RISER x 62.4 Ib/ft'
SKIMMER,--� \,,, °' a � 3 CUT OFF TRENCH 3 3 3_
SEE DETAIL - OUTLET APRON BUOYANCY = 96 ft x 62.4 Ib/ft = 5990.4 Ib
THIS SHEET P _ -- DOWNWARD FORCE (STRUCTURE WEIGHT) > 1.25 x UPWARD FORCE (BUOYANCY)
24" DIA. CMP BOTTOM OF POND INV. ELEV 824.50 24" DIA. CMP Q A
ELEV 825.00 ---- ---- -j- .__.� - -__ \ 00 21,172 Ib > 5990.4 Ib x 1.25
a ----- - --- -- ® \ \ \
a - --- ---- ---- -- -'---_ \ \ 21,172 lb> 7488 Ib
_ ANTI-SEEP COLLAR 1. PORTLAND CEMENT CONCRETE (TYPE II RECOMMENDED) FOR THE INLET BASE
SEE DETAIL THIS SHEET SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.
a a CONCRETE BASE - 20' EVERY 2. WHERE CORRUGATED ALUMINUM OR ALUMINIZED STEEL PIPE IS USED, ALL
- - 7.0' x 7.0' x 1.5' 20 AREAS WHERE THE PIPE IS TO BE IN CONTACT WITH CONCRETE SHALL BE PAINTED
z NOTES:1. FAIRCLOTH TYPE OR EQUIVALENT SKIMMER TO BE USED. WITH A BLACK BITUMINOUS ENAMEL PAINT.
2. INSTALL ANTI-VORTEX PLATE IN RISER STRUCTURE.
RISER PLAN VIEW-- SEDIMENT RISER BASIN
NOT TO SCALE NOT TO SCALE
PROJECT MANAGER V. HAYNES, PE
------ PIEDMONT LITHIUM CAROLINAS, INC.
-- - ------ .��''�N..••�A 0< SEDIMENT BASIN SB-202
--- -- - -- ---------- - -- o :F�SS ••.'� CAROLINA LITHIUM PROJECT PLAN VIEW & PROFILE DETAIL
�:Q� -��7
-- ------- S A L
5 3/13/2024 REVISED PER DEMUR COMMENTS = i
4 1/23/2023 REVISE --- 3 - LITHIUM HYDROXIDE CONVERSION PLANT
D PER DEMLR COMMENTS '
P3 5/31/2022 REVISED PER DEMLR COMMENTS -- %��� �•i N•�;•�����` GASTON COUNTY, NORTH CAROLINA SHEET
I E N T HDR Engineering Inc.of the Carolinas 2 12/08/2021 REVISED PER DEMLR COMMENTS ' CIE K. NP%\\'�3/13/2024 FILENAME - 01CP-0004
1 440 S.Church Street,Suite 1200 1 8/27/2021 MINING PERMIT
LITHIUM Charlotte, NC 28202-2075 -- - SCALE - 1" = 50' 01 C P-0004
704.338.6700 ISSUE DATE DESCRIPTION PROJECT NUMBER 10302238
N.C.B.E.L.S.License Number: F-0116