HomeMy WebLinkAboutNCG021049009 I I j I 50 0 50� 1/00 CONSTRUCTION, MAINTENANCE AND INSPECTION NOTES TOP OF BERM. ELEV 848.Oi0
0 I I -- ---_ - -------_---
'\< 20' WIDTH 4
LIMITS OF DISTURBANCE \/�/ / , 4 A/A/AA/�
` \ \ 1. INSPECT SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 \//\/j�// __ 1 C� �;\//\//\/i. Cumulative Storage
SCALE IN FEET / INCH OR GREATER RAINFALL EVENT AND REPAIR IMMEDIATELY. �A//AA//AA//AAi/ i/vO O r v /AA/AAi�/`
\ �� �' ) �V/V/V/V/V/V//�i o o o. ��/V
i � i WATTLES INS ALLED � i\/AA//AA//AA//AA//AA//AA//AA//�� I ELEV 846.50 ��%/AA//�A//AA//AA//AA//AA//AA/j` 849.00
ALONG SLOP \ V / /VV/VA/VA�AA/VA/VA/\A/VA'\� O ���- - �'VA/VA/VA/VV/VA/VA/VA/VA/�
DRAINAGE AREA / 2. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT //////\//// /// ///�/// / i�ij�O O"C 7�� O�C�00�0�0 //`//j//j///��/j//j///\//j//j///\//,
POROUS BAFFLES VAA VAA VAAVAA��VVAVAA VAAVAAVAA\A\VAS\ ��N�� 1�✓-��� �ti� �� VAA VVA VAA VAA VAA VAA VAA VAA VAA VAA VAA� TOP OF BERM
.d \ \ ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. PLACED REMOVED SEDIMENT IN AN �j // // //✓/,// // // // /�
DELINEATION ��<
/ � DETAIL SHEET OOG-011 \ AREA WITH SEDIMENT CONTROLS. AA�VA/VAA�A��AA�AA�AA AAA/VA AA��AA AA A��VAA VAA VAA VAA VAA�VVA�VAA�VAA�VAA�VA'VAA�VAA�VAA VAA�VA �AA�VAA/���AA�AA AAA AAA�AA�AAA ,�A�/VAA�AA�AA AAA; 848.00 48.00
SEE'' / / / / / / / / / //////////////%/ / / / / //i/ / / /
\ \ \ \ \ \ \ VA VA V� VA VA VA VA VA VA VA VA VA VA VA VA VA VAVA,\,�A��A/i��/AA/AA/AA%AA/AA/AA/AA/AA/AA/AA/AA/AA/AA/AA/AAiA/A'\/A/A/A/A/A/A/A/A/�/A%�/
- I 3. CHECK EMBANKMENT,KM E NT SPILLWAYS AND OUTLET FOR EROSION ION DAMAGE AND INSPECT
//%///\//% 847.00 $47.00
THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY'REPAIRS `\ \��\\ \\�\\�\\ \ \\,�\\,�\\,�\\,�\\�\�\\�\\�\\ \\ \\,�\\. EMERGENCY SPILLWAY 46.50
, \ � IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL SECTION B
AREA. 846.00 46.00
- -- I 45.50 PRINCIPAL SPILLWAY
� � - � 12" CLASS 1 RIP-RAP o 845.00 45.00 D
�/ cB
� �� ,. >' 844.25 CLEANOUT ELEV..
/ w 844.00 .00
EMERGENCY SPILLWAY % l NON-WOVEN GEOTEXTILE FABRIC
ELEV. 846.50 ` 1 9', ELEV_ 846.5 COMPACTED FILL N TOP OF
( BETWEEN ALL SOIL AND RIP RAP. � LL O 843.00 843.00 -
/ / I SEE DETAIL THIS SHEET ANCHOR IN FABRIC BY RUNNING VIRGIN SOIL WITH TOP SOIL
/ � , v \
ALONG FACE OF SPREADER LIP TO � O � � REMOVED.
--VIRGIN GROUND
TOP OF FOOTER_ o a
/ 842.00
P' 3:1 / /AAjAAjA�iVAjAAiVAjAAjAAjAAj,AAjAAjAAVAjAAjAAjAAjAAjAAjAyVAjA 3:1 ELEV: 845 ±
48" OUTLET STRUCTURE WITHVA/VA//VA//VA//VA//VA//VA//VA//VA//VA//V//V//
_� X POND BOTTOM o O/// //A//A//A//A//A//A//A/iA//A// //A//A// /A//A//A//A//A//A// /A/i /A,%A O
SKIMMER AND 50 LF OF 24" DOUBLE V \ V/V\A�A�A�\�V/V/V/V/V/V/V/�/V/V/V/V/V�V/V/\�V/V //`��V/\ 841.00
�� ��� AAAAAAAA/ AAj/A
,BARREL H DPE P �� SB-207 ELEV: 843.00 /VA/VA/VA/VA/VA/VA/A/VA/VA/VA/VA,VA/VA/VA��VA/VA/VA/VA/VA/VA/VA/VA/VA/VA/VA/�\/VA/��iVV/VA/�Ai�A
/ /A/A/A/A/A/A/A/\/A/A A/A�A/A/./A/A/A/A/A/A/A/AA/A/A/A
- SEE DETAILS THIS SHEET
i Q' \, \/A`/V�/A%A / /AA/AA/AA/AA/AA/AA/AA/AA/AA/A�/AA/AA/A�% VA VA VA VA VA VA N� VA V� VA VA VA VA VA VA `�VA VA VA VA V\ \ 840.00
/ %K/�%
y � �, �/AVAVAVAVA \ VAVAVAVAV VA VA VA VA VA VA VAVAV VA VA \A VA VA\A VA VA VA VA VAVOVA \� VAVAVA ��� V� VAV� VAVAVAVAVA \ \ 0.00 0.25 0.32 0.54 030 0.87 1.04 1.23 1.64
� � /AAA�AA�AALV/\�/��A\ t�� ��AAA�AAA�AA\AAA�AAA��� \ �����AAA�AA;�A���V �/\ �AVAA�AA \l" ---
\ OUTLET PROTECTION OP-207 - -
Cumulative Storage (ac-fit)
~ \ SEE SUMMARY SHEET 0OCP-005�,
/ \\ 1 KEY IN RIP-RAP - KEY IN RIP-RAP
'WETLAND SECTION A
EMERGENCY SPILLWAY Basin Size
30 FT STREAM NOT TO SCALE E1 . sl Depth Left Area(s CumulaWe'iV Volume(arc ft)
TOP OF BERMELEV.-,848.00/ 1� �� BUFFER 843_DCp t},O+p 1t!•11i 0.00
4 \\� BOTTOM OF POND
RIP RAP INFLOW PROTECTION f ELEV. 843.00 844.00 1 11 727 025
\� \ 11 �
SEE SHEET OOG-009 , •� 1 x� ' I \ TOP OF BANK
_ - 844.2'5 1.25 12,1 0.32
ARM ASSEMBLY
- .OU 2,03 13„395 0.54
% °° 11 \ \ l °�` 845.50 2. 14,250 0-70
l 846.00 3_ 15,119 0.87
IT
I �; �► X- �C � 84€i_50 3_,5t 16 1.f34
c" ENCLOSURE
C
847.00 4_00 16, �1.23
_ 848.00 5_ 18p7'37� 1.64
�\ �I � A - a °fie Mm �� a �' � � a �� ._li '� - WATER ENTRY UNIT
\ \ �� / °� / / �°° ° / PERSPECTIVE_ VIEW
BASIN ACCESS ROAD �X % t4
SILT FENCE j / �h-� PVC VENT SCHEDULE 40
-�. PVC ELBOW PIPE \
SEE DETAIL SHEET OOG-008 i � � / /�' �' STREAM CROSSING NO. 3 PVC END CAP PVC PIPE
�� / SEE SHEET 01CP-B008 3" PIPE DIAMETER
SK-242 � � � � � �/
Skimmer Design SB-207 Req'd Vol (cf):I8,280 SEDIMENT BASIN 207 PRINCIPLE SPILLWAY
'�► t ( ...... WATER SURFACE 9 DESIGN INFORMATION
Desired Skimmer Drawd�own Time (td) 72 hrs
° PVC END CAP Desired Skimmer Drawdown Rate Qd) 2,760 ftlida Outlet: Sediment Basin 207 Principle Spillway, Drop Pipe
PLAN VIEW SCHEDULE 40 ( y
„ _ 3" PVC PIPE
, , � Riser Top Eli 845.50 ft
SCALE 1 - 50 SEE TABLE FOR Skimmer Size 3.0 in Riser Length: 4.0 ft
PVC PIPE 5 Orifice Coefficient: 0.60
INSTALL COLLAR WITH CORRUGATIONS PIPE DIAMETER - Head on Orifice (H) 0.250 ft
VERTICAL. COLLAR TO BE OF SAME GAGE 112" HOLES IN Weir Coefficient: 3.1
UNDERSIDEur Culvert Length: 50.00 ft
AS THE PIPE WITH WHICH IT IS USED. PVC TEE - 1 .5" ORIFICE PLATE Culvert Diameter: 24.00 in
-CECUTOFF TRENCH ALIGNS .. PVC TEE -- Calculated Orifice Diameter 1.546 in
t Culvert Invert In: 841.20 fit
BAND WITH EMBANKMENT �'� Actual Orifice Diameter$ 1.500'in
1/2"X 2" SLOTTED NOTES: Culvert Friction Coefficient: 0.01
7
HOLES 8" C.C. Actual Skimmer Drawdown Time 76'hrs Culvert Entrance Loss Coefficient: 0.90
2 @ FLEXIBLE 1. ALL PVC PIPES ARE TO BE SCHEDULE 40 UNLESS
i 1 1 FOR S/8"QJ BOLTS EXISTING GROUND
�q i0 0i d bi HOSE - OTHERWISE NOTED. Discharge: 25.22 cfs
z FILL MATERIAL 2. ALL JOINTS OF THE FLOTATION SECTION SHALL BE g
2"-►� -• ---- OD OF PIPE 2' MINIMUM IF NOT SOLVENT WELDED. JOINTS OF SKIMMER SECTION NEED Required Discharge: 25.22 cfs
i CUT TO BEDROCK NOT BE WATER-TIGHT.
iQiiOiioi B
3. HDPE FLEXIBLE DRAIN PIPE IS TO BE ATTACHED TO THE
1 PIPE BARREL STRUCTURE WITH WATER-TIGHT
END VIEVv
CONNECTIONS.
- ONE PIECE CONNECTING FRONT VIEW 4. SKIMMER SIZES AND ORIFICE DIAMETERS ARE CALCULATED
BAND WELDED TO PIPE; BASED ON NCDEQ DESIGN METHODOLOGY AND WILL BE RISER BUOYANCY CALCULATION
CONTINUOUS WELD BOTH 2' L REVIEWED AND APPROVED BY THE ENGINEER ONCE A
W: 4' MIN. SKIMMER
-------- SIDES OF BAND "---SUITABLE EARTHEN MATEIRIAL -------------- -------- SKIMMER SUPPLIER/MANUFACTURER HAS BEEN CHOSEN. DEMONSTRATE ADEQUATE STABILITY BY SHOWING THE DOWNWARD FORCE IS A
COMPACTED TO 95% OF STANDARD NOT TO SCALE MINIMUM OF 1.25 TIMES THE UPWARD FORCE.
PROCTOR MAX. DRY DENSITY WITHIN DOWNWARD FORCE (STRUCTURE WEIGHT) > 1.25 x UPWARD FORCE (BUOYANCY)
±2/o OPTIMUM MOISTURE CONTENT
ANTI-SEEP
COLLARS_ CUT-OFF TRENCH 48" CONCRETE RISER
NOT TO SCALE NOT TO SCALE TRASH RACK WEIGHT = 10,147 lb
SKIMMER, SEE DETAIL- � I 10' TOP OF EMERGENCY SPILLWAY, SEE DETAIL THIS
THIS SHEET RETRIEVAL ROPE BERM 'WIDTH
4'x4' (INSIDE ANCHORED IN - SHEET WHERE:
DIMENSION) RISER 48" CONCRETE THE SLOPE � -V FREEBOARD
SEDIMENT \� / RISER WEIGHT= 10,147 lb
STRUCTURE RISER STRUCTURE TOP OF BERM. ELEV 848.00
--- CLEANOUT MIN. 1' FREEBOARD _
GAGE \ WEIGHT OF CONCENTRATE BASE _ (LENGTH x WIDTH x DEPTH) x UNIT
CONCRETE--- ` --- - ---- WEIGHT OF CONCRETE
BASE 0.5 DEPTH OF FLOW
a -- SEDIMENT CLEANOUT - U ❑oo a o❑p❑❑a // / /�\/�// // // /r // // // // / j _ EMERGENCY SPILLWAY ELEV 846.50 WEIGHT OF CONCRETE BASE _ (6.0 ft x 6.0 ft x 1.5 ft) x 150 Ib/ft3= 8100 lb
_ o❑❑ o�❑❑ o�❑❑❑❑l]
MARK, ELEV 844.25 0 ❑❑ ��❑ ❑ oo ❑❑❑o RISER CREST ELEV. 845.50 /\\j STRUCTURE WEIGHT- 10,147 lb + 8100 lb - 18,247 lb
SKIMMER, ° ��` '
EMBANKMENT STABILIZED
SEE DETAIL WITH VEGETATION BUOYANCY'= DISPLACEMENT VOLUME OF RISER x 62.4 Ib/ft3
THIS SHEET - - -
a ° � I 3 --CUT OFF TRENCH 3
24" DIA. CMP OUTLET APRON
BUOYANCY = 96 ft'x 62.4 Ib/ft3= 5990.4 lb
DOWNWARD FORCE (STRUCTURE WEIGHT) > 1.25 x UPWARD FORCE (BUOYANCY)
BOTTOM OF POND INV. ELEV 841.20 24" DIA. CMP A
I �- �i �000,50, 18,247 lb > 5990.4 lb x 1.25
ELEV 843.00 _ _ _ _ _ III- -III \\\\\\\\ -III- III-III- 18,247 lb > 7488 lb
1. PORTLANDI CEMENT CONCRETE (TYPE II RECOMMENDED) FOR THE INLET BASE
ANTI-SEEP COLLAR SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.
SEE DETAIL THIS SHEET
CONCRETE BASE �.. 20' EVERY 2. WHERE CORRUGATED ALUMINUM OR ALUMINIZED STEEL PIPE IS USED, ALL
- -- -- 6.0' x 6.0' x 1.5' 20 AREAS WHERE THE PIPE IS TO BE IN CONTACT WITH CONCRETE SHALL BE PAINTED
NOTES: WITH A BLACK BITUMINOUS ENAMEL PAINT.
1. FAIRCLOTH TYPE OR EQUIVALENT SKIMMER TO BE USED.
RISER PLAN-VIEW 2. INSTALL ANTI-VORTEX PLATE IN RISER STRUCTURE.
NOT TO SCALE SEDIMENT RISER BASIN
NOT TO SCALE
PROJECT MANAGER V. HAYNES, PE
- --- - ------ _ PIEDMONT LITHIUM CAROLINAS INC.
N •CARO SEDIMENT BASIN SB-207,
ss%o�:.'2= CAROLINA LITHIUM PROJECT
PLAN VIEW & PROFILE DETAIL
7 -
5 3/13/2024 REVISED PER DEMLR COMMENTS
4 1/23/2023 REVISED PER DEMLR COMMENTS LITHIUM HYDROXIDE CONVERSION PLANT
PIED, A' 3 5/31/2022 REVISED PER DEMLR COMMENTS � V�•IN
�`��� GASTON COUNTY, NORTH CAROLINA SHEET
- -- -
HDR Engineering Inc.of the Carolinas 2 12/08/2021 REVISED PER _DEMLR COMMENTS _ P .� FILENAME - 01 CP-B006
i E K H %,, 3/13/2024
440 S.Church Street, Suite 1200 �i,
LITHIUM1 8/27/2021 MINING PERMIT � - 1" - 50' 01 CP-B006
Charlotte, 2075 ISSUE DATE DESCRIPTION PROJECT NUMBER 10302238 SCALE _
N.C.B.E.L.S.License Number: F-0116