HomeMy WebLinkAboutNCG021049_Scanned Site Plans2_20241114 1 2 LEGEND: 3 4 5
6 � $
LITHIUM HYDROXIDE CONVERSION
PLANT
STREAMS AND SURFACE WATERS
FEMA 100-YEAR FLOODPLAIN
WETLAND AREA
RECLAIMED CONSTRUCTION
�..
STAGING AREA
STREAM BUFFER
a
OBSERVATION WELLS oB-xx
• y
SEDIMENT BASIN LABEL SB
SKIMMER BASIN LABELSK
ST-220
PROPOSED BUILDING OUTLINE 0 D
DRAINAGE AREA - - �-- ____�. .� _ _ _ _ _
:`�
,/ \ 6?
ST-221
41
e
CSX RAIL RIGHT-OF-WAY 1�
0
0 100, 200'
ST-222 \. ,
1 8
8g6
_ 8
r a C
i°
89
0
I
ST-223
870
860
t
9, --
\Y'
880
919
1 —
B
9 0
RAIL YARD AND
POO ° RAIL LINE TO PLANT \
° PROPOSED FEN co;1
CE
o S K-243
1
EL 880.22''A
ANTHONY GROVE RD (601 ROW) - EL880.29
- x77 � ��
a�
_ 6
w
0
\� 1 f�•� �,�,�� � X,., �M � EL 879.95
\ \
EL 886.05
A
_ EL 880.03
PROJECT MANAGER K. THAMES
� 860
PIEDMONT LITHIUM CAROLINAS, INC.
CAROLINA LITHIUM PROJECT ENLARGED LARG E D NCG02 OUTFALL EXHIBIT
PIE , ONOT HDR Engineering Inc.of the Carolinas SHEET TWO
LITHIUM HYDROXIDE CONVERSION PLANT
440 S. Church Street,Suite 1200 1 10/2024 NCG02 PERMIT GASTON COUNTY, NORTH CAROLINA
Charlotte, NC 282 Suite 5
704.338.6700Nu
ISSUE DATE DESCRIPTION PROJECT NUMBER 10302238 FILENAME FIGURE 1 SHEET
N.C.B.E.L.S.License Number:F-0116
SCALE 1" =100' 2 OF 7