HomeMy WebLinkAboutNCG021049_Scanned Site Plans_20241114 1 2 3
4 5 6
7 8
I
goo I,
r ENLARGED NCG02 -
m C::�
I EXHIBIT SHEET 2 a
3 _ o
P o
� 4
4 —
e e fl
El
a i
CSX RAIL RIGHT-OF-WAY a L_
Ho J� J ❑ . 0 30 600'
1
ENLARGED NCG02 '..
30 FT STREAM BUFFER a q J_,a o
EXHIBIT SHEET 3
A +W-3
J i
eso
i
I
I o�
\ SB-207 \
1j y r- SB-207 OUTFACE
RAIL YARD AND ACCESS DRIVE RAIL LINE TO PLANT
`I I \
I, PROPOSED FENCE - —
$:
r DA-29AIff °
EXISTING CEMETERY SITE " CRYSTALIZED ZED SALT STORAGE
"
50' CEMETERY SITE BUFFER
SB-201
WATER TREATMENT PLANT � I • I � ;
'.
m a
m
SB-201A OUTFACE
SB-205
[7. = C� \ 77
\ DA-206
SB-201 B OUTFALL o
PROPOSED J m o \ CONVERSION
�� 1 � .� � � SB-205 OUTFACE ,, '; ��° III ,� O ,�"� C
ENLARGED NCG02 �— -
EXHIBIT SHEET 4 PANT
� 0
"' a5 5aaaaa J •• � g N
I
- ` I SB-202 N
5
eaa
30-FT STREAM BUFFER �� .� ` SB-202A OUTFALL a
1 0
SB-2o6 �.:., g \ 1 SB-202B OUTFALL o � _
o SB-206 OUTFACE . III `
n
"- ENLARGED NCG02 : ► as 202'
�_- ,
-"r I EXHIBIT SHEET rJ o SPODUMENE CONCENTRATE.I , ` SB-204A OUTFALL04 �'" x
STORAGE
x `
SB-204B OUTFALL
{ II DA-20377-
I `
/ _ III
1 I -204
I EXISTING CEMETERY SITE A
50' CEMETERY SITE BUFFER V —
I - X� � I 'i
SB-203 30-FT STREAM BUFFER "
SB-203 OUTFALL
SK20.OUTFALL
x
-- A
m J�x - -x- -*' x
o --
,. SK-201
I , k xPad x x -----
x
dam B
n
DA-84 . . .✓
I DA-85 •
N \ r
' } SK25 OUTFALL -.e_y
} r- DA-86 SK-25 \ I x j
/A- 0 EMULSION STORAGE DA-9.1 k '
'r d' AND BULK TRUCK I
iA, PARKING �x
o X
SB-17 OUTFALL' orzo,
SB-17 \ M
} \ / DA-90
[ENLARGED NCG02 x k�x, a _� — , fill
EXHIBIT SHEET 6 xx,x \ X
I
LEGEND . k.x Xx-x-x-x-x-x-lx�-x-x-X_x X
• k,�\ x x—x-x—x x—xx
I x
LITHIUM HYDROXIDE CONVERSION xX
x
PLANT Latfturcle Longitude Ffee�ielnStream o X
Et�S 5�•uct�u ne I `
� ,STREAMS AND SURFACE WATERS '357 23'30.13" 81°1'9'11.16" Beaverdam Creek X ,
xl �FEMA 100-YEAR FLOODPLAIN r z� . 1 35° "33.86" 81° '11.40" B�ea+uerdam Creek .. �,, � X ,�
1 35°23'29.%" 81'18'50,11" Beau€rdam Creek x X
WETLAND AREA � bV � �� Do X I % A
SB 2,01A 3 35° "51010" 81'1Sr'08.80" UT mf Beaverdam Creek \ O X x
RECLAIMED CONSTRUCTION
���� SB-201B 3 35°23'50.1�4" 81°19i'09.02'" LIT�f Beavesr�dal�Creek - � o
o \ xI x
STAGING AREA r„ � -•�. � _ ._ ��\���,,\333 �\ x }
SO-202A 3 35"23'45.27'" 81'19'08.39" UT of Beaverd a rra Creek
STREAM BUFFER -- -
SB-202B 3 35°'23'44i.6a4" 81°1'9'07.6+9" UT of Beaverdam Creek x
OBSERVATION WELLS oB-xx \\ x
• SB-203 3 35°23'37.21" 81'19'06.66" Beaverdam Creek
SEDIMENT BASIN LABEL SB SB-204A 3 3Y23'39.75" 8V19'16.42" UT of Beave rd am Creek x
SB-2C►4B 3 35° 23'39.Q1" 81°19'15.88" UT of Bea�aerda-m Creek
SKIMMER BASIN LABEL SK \J\
PROPOSED BUILDING OUTLINE SB-235 3 35°2_3® -85" 81°1.3'18,4t1". UT of Bea+verdarn Creek
DRAINAGE AREA
SB-206 3 35'-223'45.71" 81°1 '26'.88" UT of Beaverdam Creek
- --- -- -- - - -_ --- - - - - - - -- I
SB-207 3 1,35 23'54.74 81°19'20.1.1" UT of Beaverdarrr Creek
ENLARGED EXHIBIT SHEET OUTLINE — — — NOTE: OUTFALLS BROUGHT ONLINE IN PRECEDING YEARS REMAIN ONLINE
T= UNNAMED TRIBUTARY
PROJECT MANAGER K. THAMES
PIEDMONT LITHIUM CAROLINAS, INC.
CAROLINA LITHIUM PROJECT OVERALL NCG02 OUTFALL EXHIBIT
CONVERSION PLANT SITE
PIE0 LITHIUM HYDROXIDE CONVERSION PLANT
HDR Engineering Inc.of the Carolinas GASTON COUNTY, NORTH CAROLINA
440 S.Church Street,Suite 1200 1 10/2024 NCG02 PERMIT
FILENAME FIGURE 1 SHEET
LITHIUM Charlotte, NC 28202-2075
704.338.6700 ISSUE DATE DESCRIPTION 1 OF 7
N.C.B.E.L.S.License Number:F-0116
PROJECT NUMBER 10302238 SCALE 1" - 300'