Loading...
HomeMy WebLinkAbout[External] Intent to Approve / Wildlands Tar-Pam 01 UMB- Great Meadow Mitigation Site /SAW-2021-01714/ Nash Co.CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon IRT, Wildlands Holdings, VIII, LLC (Sponsor) has submitted the final Wildlands Tar-Pam Umbrella Mitigation Banking Instrument and the Great Meadow Mitigation Project Final Mitigation Plan. The sponsor’s response to IRT comments is included with the final mitigation plan and attached to this email. The final versions of these documents were received by our office on September 26, 2024, and have been posted to the bank site cyber repository on RIBITS <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fribits.ops.usace.army.mil%2Fords%2Ff%3Fp%3D107 %3A278%3A3126923106732%3A%3A%3A278%3AP278_BANK_ID%3A6103&data=05%7C02%7Cmaria.polizzi%40deq.nc.gov%7Cbd833acd72ab479e300a08dcfe81415e%7C7a7681dcb9d0449a85c3ecc26cd7ed19%7C0%7C0%7C638665078871439139%7 CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=5Y3eVn1jc1mk%2FuD%2Ffik9TKYDBiSzti7bkJrs%2BCQpe6g%3D&reserved=0> . Please note that you must be logged in to access documents in the cyber repository. If you would prefer to receive a hard copy of the UMBI and final mitigation plan, please contact me so that I can arrange to have one delivered. We have evaluated the comments generated during the review period for the draft UMBI and mitigation plan as well as the responses from the Sponsor (included with the final mitigation plan) and determined that all issues have been adequately addressed. Accordingly, it is our intent to approve the Wildlands Tar-Pam Umbrella Banking Instrument and Great Meadow Site Final Mitigation Plan unless a member of the NCIRT initiates the Dispute Resolution Process, as described in the Final Mitigation Rule (33 CFR Section 332.8(e)). Please note that initiation of this process requires that a senior official of the agency objecting to the approval of the mitigation plan or Umbrella Banking Instrument notify the District Engineer by letter within 15 days of this email (by COB on 11/21/2024). Please notify me if you intend to initiate the Dispute Resolution Process. Provided that we do not receive any objections, we will provide an approval letter and signed UMBI to Wildlands Holdings VIII, LLC following the conclusion of the 15-day Dispute Resolution window. All NCIRT members will receive a copy of this letter for your records. Thank you for your participation in this process and please contact me if you have any questions. Respectfully, Casey Haywood Mitigation Project Manager US Army Corps of Engineers I Wilmington District I Regulatory Division 3331 Heritage Trade Dr., Suite 105 I Wake Forest, NC 27587 Work Cell: 919-799-0536 I Email: Casey.M.Haywood@usace.army.mil <mailto:Casey.M.Haywood@usace.army.mil>