Loading...
HomeMy WebLinkAboutWQ0045100_Oakdale_Forest_Phase_I_FTSSE_Asbuilts_20241113Zoning Conditions: 1. No apartments shall be allowed. 2. The maximum number of residential lots shall be 95. 3. Setbacks- Maximum front setback of 30' along the internal roads and 70' along Harvey Road 4. Architectural standards: Vinyl exterior with some element of stone or brick wainscot on the front. Decorative vinyl shakes or board and batten in front gable. Shutters per plan and elevation (some elevations are designed to not be conducive for shutters). A variety of elevations and neutral exterior colors. 5. A Traffic Impact Analysis (TIA) shall be completed before the rezoning is heard by Town Council. The developer shall comply with requirements identified in the TIA. BYPASS DISTRICT REQUIREMENTS: DENSITY: 12 UN/AC MAX. SETBACKS: FROM BYPASS: 75' OTHER STREETS: 10' MIN. TO 25' MAX. CORNER LOTS: 8' MIN. TO 15' MAX. REAR: 5' SIDE: 5' BUILDING SEPARATION: 12' MIN. MAX. HEIGHT: 25' (TO PEAK/EAVE MIDPOINT) UTILITY NOTES: 1. ALL CONSTRUCTION TO TOJ/NCDEQ STANDARDS. 2. METER, BACKFLOW PREVENTER AND ENCLOSURES TO TOJ STD. 3. ALL STANDARD NCDEQ/TOJ REQUIRED UTILITY SEPARATIONS MUST BE PROVIDED. 4. SERVICES THAT TIE INTO MANHOLES MUST DO SO AT THE SHELF UNLESS MANHOLE IS GREATER THAN 10'. THEN USE A RELINER INSIDE DROP. 5. METERS CANNOT BE SET UNTIL EASEMENTS ARE RECORDED AND PROVIDED TO WATER RESOURCES. 6. THE IS NOT A FIRE PUMP ASSOCIATED WITH THIS PROJECT. 7. METERS CANNOT BE LOCATED IN LOAD BEARING AREAS. 8. UTILITY FEES SHALL BE PAID TO THE TOWN OF JAMESTOWN PRIOR TO PLATTING EACH PHASE. 9. PROVIDE SEWER CLEANOUTS AT THE EASEMENT/R.O.W. AND 5' OFF OF THE BUILDING. 10. UTILITY SEPARATIONS: - WATER LINE DEPTH = 30" MIN. PER 15A NCAC 18C .904(a), TYPICAL DEPTH SHALL BE 36" PER TOWN OF JAMESTOWN. - WATER TO STORM DRAINAGE AND OTHER UTILITIES (NOT SANITARY SEWER) SEPARATION = 12" MIN. PER 15A NCAC 18C .0904(b) FROM OUTSIDE OF WATER MAIN TO OUTSIDE OF STORM PIPE OR OTHER UTILITY, 18" MIN. SEPARATION SHALL BE USED IF WATER IS UNDER STORM PER TOWN OF JAMESTOWN. - WATER MAIN TO SANITARY SEWER SEPARATION = 10-FOOT MIN. LATERAL SEPARATION PER 15A NCAC 18C .906(B) AND 18" VERTICAL SEPARATION AT CROSSINGS PER 15A NCAC 18C .906(c) AND 15A NCAC 02T .305(f). ONE FULL LENGTH OF WATER PIPE SHALL BE LOCATED SO THAT BOTH JOINTS WILL BE AS FAR FROM THE SEWER AS POSSIBLE AT CROSSINGS. - SANITARY SEWER DEPTH = 36" MIN. OR USE FERROUS PIPE. - SANITARY SEWER TO STORM DRAINAGE SEPARATION = 18" MIN. PER 15A NCAC 02T .305(f) AND 24" MIN. PER MDCs, OR USE FERROUS PIPE. NOTE: WHERE PLUMBING FIXTURES ARE INSTALLED ON A FLOOR WITH A FINISHED FLOOR ELEVATION BELOW THE ELEVATION OF THE MANHOLE COVER OF THE NEXT UPSTREAM MANHOLE IN THE PUBLIC SEWER, SUCH FIXTURES SHALL BE PROTECTED BY A BACKWATER VALVE INSTALLED IN THE BUILDING DRAIN, OR HORIZONTAL BRANCH SERVING SUCH FIXTURES. PLUMBING FIXTURES INSTALLED ON A FLOOR WITH A FINISHED FLOOR ELEVATION ABOVE THE ELEVATION OF THE MANHOLE COVER OF THE NEXT UPSTREAM MANHOLE IN THE PUBLIC SEWER SHALL NOT DISCHARGE THROUGH A BACKWATER VALVE. TRANSPORTATION NOTES: 1. NO PLANTINGS OR OTHER OBJECTS SHALL BE WITHIN SIGHT TRIANGLES AT A HEIGHT BETWEEN 2.5' AND 10'(CANOPY) ABOVE THE FINISHED GRADE OF THE PROPOSED DRIVEWAY OR WITHIN ANY STREET INTERSECTION SIGHT TRIANGLE. 2. NO VEHICLES ACCESSING THIS SITE SHALL BACK TO OR FROM THE PUBLIC RIGHT-OF-WAY. 3. NO VEHICLES ACCESSING THIS SITE SHALL QUEUE IN THE PUBLIC RIGHT-OF-WAY. 4. PROVIDE MINIMUM 4' SIDEWALK WIDTH CLEARANCE AROUND ALL ABOVE GROUND UTILITIES. 5. ALL RESIDENTIAL DRIVEWAYS TO BE CONSTRUCTED PER TOJ STANDARDS. 6. REFERENCE TOJ STANDARDS FOR ACCEPTABLE DRIVEWAY GRADES. 7. PRIOR TO INSTALLATION OF PUBLIC SIDEWALK AND/OR DRIVEWAYS WHICH ARE TO BE PERMITTED THROUGH PUBLIC SERVICES (BUILDING INSPECTIONS) CALL 336-454-1138. PLUMBING INSPECTION REQUIRED ON 3/4" WATER SERVICE AND/OR 4" SEWER SERVICE. CALL PUBLIC SERVICES AT (336) 454-1138 FOR PERMIT. CONSTRUCTION INSPECTION: CONSTRUCTION INSPECTION REQUIRED FOR 8"/6" WATER L AND/OR 8" SANITARY SEWER. CALL (336) 454-1138 TO SCHEDULE INSPECTOR. BEFORE YOU DIG! CALL 811 N.C. ONE -CALL CENTER IT'S THE LAW! Association Maintenance: OAKDALE FOREST HOA is responsible for maintaining the Stormwater Control Measures as directed by the government office having jurisdiction for the watershed protection and if the association should be dissolved or cease to exist, then in that event all owners of record at the time of required maintenance shall be jointly and severally liable for any and all cost attendant thereto. Government Access Rights: The government office having jurisdiction for watershed protection and their assigns will have right of access to the permanent pond for inspections and maintenance enforcement. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD ZONE AS INDICATED ON FIRM PANEL 3710782100J DATED JUNE 18, 2007 ALL PUBLIC STORM SEWER MUST BE INSTALLED PER NCDOT AND TOWN OF JAMESTOWN SPECIFICATIONS SITE DATA - ZONING: BYPASS DISTRICT - TAX ID: 223271 - D.B. 8707 PG. 1978 - TOTAL AREA = 31.239 AC. - TOTAL No. OF UNITS ALLOWED = 95 - TOTAL NUMBER OF UNITS PROPOSED = 95 - DENSITY = 3.0 UN/AC. - BUA = 7.902 Ac (25.3%). (SEE WATERSHED DATA FOR DETAILS) - TOTAL R/W DEDICATION = 3.20 ACt - TOTAL PUBLIC STREET LENGTH = 2,815 LF - OPEN SPACE REQUIRED = 10% OF LOT = 3.1 AC - OPEN SPACE PROVIDED = 15.7 ACt WATERSHED DAT - WATERSHED: RANDLEMAN LAKE - DESIGNATION: WATER SUPPLY WATERSHED - SUB -BASIN: WCA TIER 3 & GWA - IrB, HeC, HhB, EnD - AVERAGE SLOPE: 10% - DISTANCE TO FLOODWAY: 290't -DISTURBED AREA = 22.9 ACt - EXISTING BUA (REMOVED) = 0.000 ACt - PROPOSED BUA SUMMARY: ON -SITE: STREETS, PRIV. DRIVE, CBUs= 2.017 ACt SIDEWALKS = 0.211 ACt UNITS (95 0 2510 SF/UNIT)= 5.474 ACt FUTURE = 0.200 ACt OFF -SITE: = 0.322 ACt STREETS TOTAL = 8.224 ACt - RIVER BASIN: CAPE FEAR - LAT: 35.986375 - LONG:-79.917928 - ESTIMATED START DATE: DECEMBER, 2023 - ESTIMATED END DATE: DECEMBER, 2025 GENERAL NOTES 1. ELEVATIONS/SLOPES WITHIN THE FACILITY, OTHER THAN THOSE NOTED, SHALL BE AS INDICATED ON THE BUILDING PLANS, OR IN ACCORDANCE WITH CURRENT CODES AND INDUSTRY STANDARDS. 2. ALL RETAINING WALLS GREATER THAN 4' REQUIRE A BUILDING PERMIT FROM BUILDING INSPECTIONS. 3. ALL PARKING, SIDEWALK, AND STRUCTURE SUBGRADES SHALL BE COMPACTED TO 95% STANDARD PROCTOR (MIN.) UNLESS A HIGHER LEVEL OF COMPACTION IS NOTED ON THE BUILDING PLANS. 4. THE CONTRACTOR SHALL REFER TO THE BUILDING AND PLUMBING PLANS FOR ADDITIONAL REQUIREMENTS, INCLUDING, BUT NOT LIMITED TO, GENERAL PLUMBING NOTES. 5. ALL WATER AND SEWER INSTALLATIONS SHALL CONFORM TO ALL FEDERAL, STATE AND LOCAL CODE. 6. EX. UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE, OTHER MAY EXIST. LOCATIONS BASED ON LIMITED FIELD LOCATIONS. CONTRACTOR SHALL HAVE ALL UNDERGROUND UTILITIES LOCATED AND IS RESPONSIBLE FOR ASSOCIATED COSTS PRIOR TO COMMENCEMENT OF CONSTRUCTION. IF CONFLICTS EXIST, ENGINEER SHALL BE NOTIFIED. 7. STORM SEWER AS-BUILTS REQUIRED - AFTER FINAL TRC APPROVAL, SUBMIT ONE SET OF PLANS TO PUBLIC SERVICES FOR RECORD PURPOSES. 8. THE LOCATION AND SIZE OF WATER AND SEWER SERVICES SHALL BE " AND 4" RESPECTIVELY. 9. ALL CONSTRUCTION WILL BE IN ACCORDANCE WITH TOWN OF JAMESTOWN STANDARDS. 10. THESE DRAWINGS ARE PRELIMINARY AND FOR REVIEW BY THE TOWN OF JAMESTOWN AND ARE NOT FOR CONSTRUCTION. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE TOWN OF JAMESTOWN FOR THE INSTALLATION OF SERVICE LINES AND PAY ALL TAP FEES UNLESS OTHERWISE AGREED TO WITH THE OWNER. THE OWNER SHALL PAY ALL SYSTEM DEVELOPMENT FEES. 12. COMMON AREAS WILL BE OWNED AND MAINTAINED BY THE OAKDALE FOREST HOA. 13.AN HOA MUST BE ESTABLISHED BEFORE THE FINAL PLAT CAN BE RECORDED. 14. THE CONTRACTOR SHALL NOTIFY THE TOWN OF JAMESTOWN, OR IF APPLICABLE, N.C. DEPARTMENT OF TRANSPORTATION, PRIOR TO ANY WORK WITHIN THE RIGHT-OF-WAY. SIGNS, PAVEMENT MARKINGS AND TRAFFIC CONTROL SHALL CONFORM WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, AS AMENDED, OR OTHER APPLICABLE REQUIREMENTS/REGULATIONS. 15. ALL THE NECESSARY PERMITS/APPROVALS HAVE BEEN/WILL BE OBTAINED. THE STATE/APPLICABLE CITY/STATE PERSONNEL SHALL BE NOTIFIED CORPS FOR ANY WETLANDS DISTURBANCE AND ANY STREAM CROSSINGS/DISTURBANCE. COPIES OF APPROVED PERMITS SHALL BE SENT TO THE TOWN OF JAMESTOWN. 16. PRIOR TO POURING CONCRETE APRONS, THE TOWN MUST BE NOTIFIED BY THE CONTRACTOR TO INSPECT DRIVEWAY TIE-INS. 17. BOUNDARY INFORMATION TAKEN FROM SURVEY BY COE FORESTRY AND SURVEYING. 18. ALL DIMENSIONS ARE TO BACK OF CURB UNLESS OTHERWISE NOTED. 19. TOPOGRAPHIC INFORMATION TAKEN FROM A COMBINATION OF LIMITED FIELDWORK AND NC LIDAR. 20. CENTERLINE SPOT PAVEMENT ELEVATIONS ARE WITH THE FINAL ASPHALT LIFT INSTALLED. 21. ALL SIDEWALKS AND HANDICAP RAMPS SHALL BE INSTALLED TO CURRENT ADA REQUIREMENTS. 22. THERE SHALL BE LEVEL TURNING AREAS (MAXIMUM 2% SLOPE IN ANY DIRECTION INCLUDING IN THE DIAGONAL) ON ALL SIDEWALKS WHERE AN INTERSECTING SIDEWALK CONNECTS WITH IT. 23. THERE SHALL BE NO DESIGNATED PEDESTRIAN ROUTES/SIDEWALKS WITHIN THE SITE, EXCEPT WHERE LABELED AS A RAMP WITH RAILS, WHICH EXCEED A 5% SLOPE IN THE DIRECTION OF TRAVEL AND A 2% CROSS SLOPE. 24. NO OVERHEAD POWER LINES SHALL EXIST WITHIN THE PROPERTY LIMITS. 25. ANY STRUCTURE TO BE REMOVED SHALL REQUIRE A DEMOLITION PERMIT FROM BUILDING INSPECTIONS. 26.SIDEWALK TO BE CONSTRUCTED PER TOJ STANDARDS.. 27. ALL DISTURBANCE SHALL COMPLY WITH APPROVED STATE/CORPS PERMITS. 28. DISTURBANCE ACTIVITIES SHALL FOLLOW THE CURRENT APPROVED EROSION CONTROL PLAN/PERMIT. 29. PROVIDE MINIMUM 4' SIDEWALK WIDTH CLEARANCE AROUND ALL ABOVE GROUND UTILITIES. 30. GARBAGE PICK-UP SERVICE SHALL BE INDIVIDUAL MOBILE TOTES. 31. NO DUMPSTERS ARE BEING PROPOSED 32.ALL COMMON ELEMENTS MUST HAVE A MAINTENANCE AGREEMENT THROUGH AN OWNERS ASSOCIATION. 33. APPROVED VEHICLE ACCESS FOR FIRE FIGHTING SHALL BE PROVIDED TO ALL CONSTRUCTION OR DEMOLITION SITES. VEHICLE ACCESS SHALL BE PROVIDED TO WITHIN 100 FEET OF TEMPORARY OR PERMANENT FIRE DEPARTMENT CONNECTIONS. VEHICLE ACCESS SHALL BE PROVIDED BY EITHER TEMPORARY OR PERMANENT ROADS CAPABLE OF SUPPORTING VEHICLE LOADING UNDER ALL WEATHER CONDITIONS. VEHICLE ACCESS SHALL BE MAINTAINED UNTIL PERMANENT FIRE APPARATUS ACCESS ROADS ARE AVAILABLE. 34. THE HOME OWNERS ASSOCIATION (HOA) SHALL BE RESPONSIBLE FOR ACCESS, OWNERSHIP AND MAINTENANCE OF CBU'S, AS WELL AS OFF-STREET CBU PARKING. 35.SEALED APPROVED PLANS ARE REQUIRED TO BE ON SITE. 36. ANY EXISTING WELLS MUST BE DISCONNECTED IMMEDIATELY AFTER CONNECTION TO THE TOWN OF JAMESTOWN WATER SYSTEM IS MADE. 37. WELLS MUST BE ABANDONED IN ACCORDANCE WITH GUILFORD COUNTY ENVIRONMENTAL HEATH REQUIREMENTS. 38. ADEQUATE DRAINAGE FOR BUILDING PADS SHALL BE PROVIDED TO ALLOW DRAINAGE TO FLOW AWAY FROM BUILDING PADS. A MINIMUM FALL OF 6" SHALL OCCUR WITHIN 10 FEET OF THE PAD. 39.THE PLANTING BUFFER ALONG THE FRONTAGE ON HARVEY ROAD SOUTH OF THE ENTRANCE HAS BEEN REDUCED IN DEPTH, HOWEVER, THE TYPE 'B' PLANTING DENSITY SHALL STILL BE USED. 40. STREET LIGHTS SHALL BE CUT-OFF. IF DECORATIVE LIGHTS ARE USED, THE FIXTURE TYPE SHALL BE DELUXE TRADITIONAL DUKE ENERGY POLE: STYLE W. 41. PER LIDO 11.6-2(E), IF THE REQUIRED BUILDING SETBACK IS LESS THAN THE REQUIRED BUFFER WIDTH, THE BUILDING SETBACK SHALL REDUCE THE REQUIRED PLANTING YARD WIDTH ONLY ALONGSIDE THE BUILDING. THE PLANTING RATE OF THE REQUIRED PLANTING YARD SHALL STILL APPLY. OAKDALE FOREST 4718 HARVEY ROAD JAMESTOWN, NC 27282 GE JOB No. 22-13 LOCATION MAP GUILFORD COUNTY ADDITIONAL GENERAL NOTES (APPLIES TO ALL SHEETS) 1. It shall be the General Contractor's responsibility to establish cut and fill quantities necessary to provide the final grades indicated on these plans. Fill material not available at the site shall be provided by the General Contractor at no additional cost to the owner. Furthermore, the General Contractor, by way of establishing a contract price for site grading, has acknowledged that he is aware of the limited subsurface information and available fill material necessary to complete the work, and that his established contract price is sufficient to ensure the proper completion of the project and conditions which may affect the work, including but not restricted to those bearing upon transportation, disposal, handling and storage of materials; water tables or similar conditions at the site; availability of labor, water, electric power, roads, and uncertainties of weather; and the character of equipment and facilities needed preliminary to and during proceedings of the Work. Any failure by the Contractor to acquaint himself with these facts will not relieve him from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Owner assumes no responsibility for any conclusions or interpretations made by the Contractor on the basis of the information, if any, made available by the Owner. 2. The Contractor shall be responsible for any damage to gas or water pipes, public or private sewers, drains or culverts, railroad or traffic signal cables, telephone or power conduits, or other structures. When utility lines that are to be removed are encountered within the area of operations, the Contractor shall notify the Owner's representative in ample time for the necessary measures to be taken to prevent interruption of the services. Reasonable care has been exercised in showing the location of existing utilities on the plans. The exact location of such utilities is not known in all cases. The Contractor shall explore the area ahead of the grading operation by observations, electronic devices, and by personal contacts with utility companies, and locate such utilities in advance of the trenching or grading operations, and shall conduct his work so as to eliminate or minimize damage to the existing structures or utilities. 3. Vertical and horizontal reference points provided on these plans are intended to establish base lines for locating the principal components of the Work. From this information the Contractors shall develop and make all detailed surveys needed for construction of all types. Costs associated with the provision of construction lay -out shall be included in the contract price for the related work. In no case shall The Contractor shall carefully preserve bench marks, reference points and stakes and, in case of willful or careless destruction, shall be charged with the resulting expense and shall be responsible for any mistake that may be caused by their unnecessary loss or disturbance. 4. The General Contractor shall be responsible for the provision and routine maintenance of erosion control devices, either indicated or required by Division of Land Resources Personnel, necessary to comply with the Sedimentation Pollution Control Act of 1973 and amendments thereto. Any fines resulting from the improper provision or maintenance of required devices shall be burdened by the General Contractor. 5. The General Contractor shall be responsible for conformance with all current local, state, and OSHA safety codes during all phases of the work. Contract prices established for the work shall include costs associated with the provision of safety equipment, and personnel necessary to complete the work, including but not limited to, trench bracing, and personnel licensed by OSHA as competent for evaluating soil stability. 6. No sub -surface investigations have been performed at the site. The General Contractor is encouraged to perform additional sub -surface investigations prior to establishing his contract price for site grading. It shall be the General Contractor's responsibility to establish cut and fill quantities necessary to provide the final grades indicated on these plans. Fill material not available at the site shall be provided by the General Contractor, or excess material shall be removed/disposed of by the contractor, at no additional cost to the owner. Furthermore, the General Contractor, by way of establishing a contract price for site grading, has acknowledged that he is aware of the limited subsurface information and available fill material or excess material necessary to complete the work, and that his established contract price is sufficient to ensure the proper completion of the project and conditions which may affect the work, including but not restricted to those bearing upon transportation, disposal, handling and storage of materials; water tables or similar conditions at the site; availability of labor, water, electric power, roads, and uncertainties of weather; and the character of equipment and facilities needed preliminary to and during prosecution of the work. Any failure by the Contractor to acquaint himself with these facts will not relieve him from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Owner assumes no responsibility for any conclusions or interpretations made by the Contractor on the basis of the information, if any, made available by the Owner.All fill material shall be placed in conformance with the Geo-Tech Engineer's recommendation, and compacted to a minimum of 95% Standard Proctor density. SHEET INDEX: STORMWATER QUANTITY CONTROL THE STORMWATER CONTROL STRUCTURE(S) SHOWN ON THIS PLAN ARE DESIGNED IN ACCORDANCE WITH TOWN OF JAMESTOWN STANDARDS TO REDUCE THE POST -DEVELOPMENT 1-YEAR 24 HOUR STORM EVENT, THE 2-YEAR 24 HOUR EVENT, AND THE 10-YEAR 24 HOUR STORM EVENT TO PRE -DEVELOPMENT RATES. STORMWATER QUALITY CONTROL I CERTIFY THAT, PURSUANT TO GENERALLY ACCEPTED ENGINEERING STANDARDS IN THE COMMUNITY, IT IS MY PROFESSIONAL OPINION THAT RUNOFF FROM THE FIRST INCH OF RAINFALL FROM AREAS THAT ARE REQUIRED TO BE CONTROLLED PER THE TOWN OF JAMESTOWN LAND DEVELOPMENT ORDINANCE IS CONTROLLED BY A PERM ANFNT..�WGIN EERED STORMWATER QUALITY CONTROL THAT HAS BEEN DESIGNED TO MEET OR EXCEED THE REQ,U��kvEICTgd•,,THE NCDEQ STORMWATER MANAGEMENT MANUAL. Of ESS/ ' SEAL P.E. SEAL27465 %, FNGINEE� • S��: SIGNATURE DATE AS-BUILTS: . �� ►� 2� AS -BUILT SURVEY DATA PROVIDED BY COE FORESTRY &SURVEYING. (PHASE 1) VICINITY MAP C-000 COVER SHEET C-101 OVERALL SITE PLAN C-102 SITE & UTILITY PLAN PHASE 1 C-103 SITE & UTILITY PLAN PHASE 2 C-104 GRADING & DRAINAGE PLAN PHASE 1 C-105 GRADING & DRAINAGE PLAN PHASE 2 C-201 PLAN/PROFILE OAKDALE FOREST AVE PHASE 1 C-202 PLAN/PROFILE OAKDALE FOREST AVE PHASE 2 C-203 PLAN/PROFILE OAKDALE FOREST COURT C-204 PLAN PROFILE GOLDBERRY LANE C-205 PLAN/PROFILE CREEKHOLLOW COURT C-206 PLAN/PROFILE SANITARY SEWER OUTFALLS C-207 PLAN/PROFILE WATERLINE EXTENSION HARVEY ROAD C-208 HARVEY ROAD WIDENING PLAN C-209 HARVEY ROAD STRIPING PLAN C-301 INITIAL EROSION CONTROL PLAN PHASE 1 C-302 INITIAL EROSION CONTROL PLAN PHASE 2 C-303 FINAL EROSION CONTROL PLAN PHASE 1 C-304 FINAL EROSION CONTROL PLAN PHASE 2 C-305 EROSION CONTROL DATA C-401 WET DETENTION POND No. 1 DETAILS C-402 WET DETENTION POND No. 2 DETAILS C-501 WATER DETAILS C-502 SEWER DETAILS C-503 STORM DETAILS C-504 ROADWAY & MISC. DETAILS C-505 EROSION CONTROL DETAILS C-506 EROSION CONTROL DETAILS C-507 EROSION CONTROL DETAILS N J J (N w U W 0 0 r0 Z LLI LEI 0_ V) 0 JLLJ W o�00M oa0Lr) Q Of ZNCV 0-000000 ctz04 ON0 l Gil LLJ CT L>iI � f_ 00<M w0r,W c zz0w o 0 J 0 CL U J J �� CD Z CD N U CJ U W - z W �LU ��CMO�> ZOO-O LU I] m l -I Cr Z C/) CV CL�`` ��uJON=CEO CD MM U N 1CVO cor- CJ CM C7C !Z CC V w z� W- " W a 1 W Z Oz LU w V z� W g .fir d� ; "•% Lhlo dam• J' C O C6 U L L Z ° Z J � 0 LUL O ��F VJ U W W 0!. or- C) Z � � O W 0L J LU Q LU D:f �e > 0- Q O Q J 2 J Q 0 N Of LU � I o m O M ~ O � 3 L O o By Revision TRG 7-CLARIFIED UTILITY REQ'D SEPARATION PER PER NCDEQ PWSS (SEE UTILITY NOTE 10) 2/4/2 PROJECT NUMBER 22-13 DATE JUNE, 2023 Sheet: C-000 A S- B U I L T S. I I I2A 40' 30' 20' 10' 0 40' 80, SUGAS-BUILT SURVEY DATA PROVIDED BY COE FO&►> > (PHASE 1) SCALE: 1 =40 GOLDBERRY LANE SEE SHEETS C-207-209 SEEI SHEET C-204 3N CI I IIf 8' I1 I 2-2 778.15 ISCM ES 2-1 EPP TOP=�@ NV OUT=�59-.i67#5�7.72 s � INV OUT=-- L8'I 1-17 - TOP=89�-5�804.74 W= 8'-10'.I ;I I , / 00 ew to I INV OUT=892A9 801.89 YI 1-8 -- 1 4?� D=24" ES 1 1 o I o � z dko� Fo TOP=7&�-4g 785.11 < _ INV OUT= 8 781.01 ___ ---- _ �CA F �S L 20' T 757.21 I N CLASS 1 STON I I do > - �,� - _- - 1r - . Z L 00 I IQ rn w v ^�' -- W= 9' f 23' l Zl 0 0 of a o 06, ce a `/YI 1-12 ----- � 9�99 STA 9+01 0� D=24' 8"x6" HYD. TEE �� TOP=�� 798.79 1 0 7 4 I � CLASS 1 S1fONE , 6 I ¢HwQQ� �0 89 INV OUT=�9 795.59 r 76 75 I os+ �7 z 0° 8" G.V. &BOX �� I SSMH A-6 I 2' o y 5 J > U / / , a a Q � ____ I. 6" G.V. &BOX ��` STA 9+22.53 .� 2 I I- N O-8 8(8�7--MP7 l HYDRANT ASSEM. �s 3X (R) ' oo==w �b� Oww/ 00 Q v o �/ / °N° 7 V MP. 8" PLUG (9+42) �� ' STA 9+3�0 3nIb0 l� 0 0 50 7 I CI 1 1 N © '� INV OUT 2 0) 00 (n r 6 g O -- G WALL WITH RAIL/FEN Q=740.3f D 0 + a .46 8 4 0 8 O� _ Z RETAININ ��� 11-16 ON � '` TOP= 804.0 STA +0Z' O _ INV IN 79 .73 Tq a -� ===' Cep oo a - 0 =79 .53 YSTA 6 66. 7N+D°� I 8"x6" EE 6" G.V. & U, - �� - cV N W v- o CI 1-7 0 +m= o o O v7 o m o 0 8" G. &BOX HYDRA T A SEM..q + ��� /3op' x i ` a - G. &BOX J _ N o P gLIC D1 S L 04 oo C� R I N N 8 PUg 0 o ATER & SEWE SERVIC o STA +1 25 - --- U 0° 00 00 I � �l G PVC SpR _ ro ACH LOT CI 1 11 ��8 o C SDR-2 S. 26.0 W L. ° m m I 1. �o o_ 8„ P B EST LA E C o g PUBU PV STA 9 30.50 3 a w N 2 < p W LIC C 90 rn _ _ A. s Cn3.77 C (A (n n OS 01 �� S�`S�j n ° PG+ 150 R1 - OA n o g. y RETE 30'R ( YP N w m c I ti D 8 P�gLI w�* w - n LIC C SDR-26 TU NAROUND I r < I z I N N 0o r PVC Sp w o g" PUB IF N CESSARY z 0x c I 13 �S� o + I R-26 L o - 5 o.87.0 AT P ASE INE I U ' N m 15 SM A-5 CI 1-5 �5STA 10- OZ z l 0° R = s S o n o w " PUBLIC PV SDR-26 S.L. STA +64.6 m o W P= 8 .81 060 �D �9�x�� 0 5.5 R w � 2, - o I °s o m � INV OU - 8 0 ° 9 0 0 '� D o � � c0 O is - - Q I I I I < m 0o W D 2 CJ o SSM A-3 A 4+6 .54 STA +67.67 , INV IN \ 2' 00 l L v D o m TA 3+ 3.53 STA 3+60.6 CI 1-9 6.3 O n I 2 C1 2 6 N \=741.3t I 0 I I om m > CI 1-13 6.6' (R) 5' SIDE ALK WIT 3. GRASS STRI = 2 4 �J N , A _r l 2 3 \ Ri�NSITION\T0 STANDA D m gg n ---- CUR STA 9+30-12+10 o + o \ I o 11 N 2 2 YI 1-4 , TRAtN SITION 0 6' SIDE A K I ` zL 2 0 21 TOP=�1-5E771. 7 AGASTCl B w 3' G S x i Q I �11------- m F+ AI L rr7�7 � \_ INV OUT �fr9-6@ 768 2 , STRI w/ N DOT STD G�1 RD m `� 14 17 18 l - � __-- � TOP=�$2-99 784.54 �9+ 862 1 181+5 (WEST SIDE) & 16 o I 15 I INV OUT='7884878o�4 ' 9+4 -12-+ EAST SIDE Os � r V I � � o ----------- 0 - (� YI 1-10 � 1 \ o os+� O TOP=8 797.65 1 I o I I I - INV OUT='793.50 'oy N � Nc• � /' i n SEE SHEETS C-207-209 SEE SHEET C-203 00 LO N 0) co PO O to to O I- 04 o I� rM 0) LO In LO LO LO LO LO � LO � ul N LO V) W) V) N N 0) co M o 0) � O to N I- M m LO O w N I- K) ^ 00 00 U co co co \ co co co co co � co cV O 0) 00 I� I� n co co ui L6 4 4 4 M M cV cV O Oi 00 I� ui 4 cV � 0; 00 co ui M cV O 0i I- to 4 M O 00 I� I� O O O O O O O O O O O O O O O O O O O O 0) O 0) O 00 00 00 00 00 00 00 n n \ n n n n n co co co 820 co 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 n r- � n n n n n r, n r- n r- r- n n n n n n n r- w SSMH A--6 -_ o �> < (, O �- Leln�c t:h == 1 0.100' K= 30.4 - TOP=77E � 770.45 O 00 0 �,� oo INV IN=i�6$fr� 760.50 00 '-• } F- Lrn in \ INV OUT:=?ER)�'i&760.40 O c�i Q : cn 0) 0) 00 > + [if + o o + 0) \ \ �\ C 11- 3 L> Q + 02I 0 "� 00 00 ^ CI 1-7 TOP=770.14 L J z < CI LLJ I I 11 I II I I I I �\ �\ �\ I N 'V I N= yfr�r (1-- 5) TOP=785.87 z UI <c U 5 > > IN`✓ IN=7�$z i�79,.60,� � � INV IN=�frfr� (1 --4) 0 c� a _T w a _T INV OUT==��2- 779,.23 �� INV OUT==�6,3-b� SSMH A--2 Li _ SSMH A--1 - E306 94 805.14 TOP=88.4-..m, 0 SSMH /A='i c \ + TOP=+f396r83- � � „-- S..�MH A--S - � \ \ 9514 79'i 54• INV IN=� $& TOP=7E3fi:-6 i 85.,53 ,� CI 1-2 I- IM✓ IN=79rr.3E� _j TOP=6(m_.6►4 80'1.9Ei ► �1'7 `�\ \� TOP=770.14 795 04 79:i.44 INV OUT==79 8- �� �- INV IN= 17&..3z 7 75.,76 < w INV OUT==79-.2& CI 1-14 __ INV IN==7g9-9Er 79'1.5a ' \ S�� \ ��� IN'V OUT - � `' 810 - co INV OUT=��E& 79'1.4:i 7901 N V OUT 7�frz, 7 75.66 71 <,c 3 - T P=805.77 _ �__ \ /?co � .� � � 759.71 I N I N=�I�9�4Z (1--18;1 801.45 o CI 113 CI 1-1 'I _ IN I N = (1 - 16) 7f)7.Ei5 N TOP=802.44 � \� TO=784.62 \ \�� �� 0�g Z. \ \�\ C IN IN=6�9&§� 1-15 800.55 TOP=80o..�0 ( ) 795,.42 INV V' I N =G \ I N O U T== 7-94-•4� 797.1i0 F� "�95..22 I N V' OlJ T= ' r INV I N =_ +-5 Er 794.13 \ 1 N I N = �;8-�� (1- 9\T78.26 cn INV OUT== 793.60 \ IN IN-�.q (1-7)TX&46 CL 8 W1_ �� SSMH A,,=4 �, �� \ IN IN= (�1-6)778.71 \\\ \ \1 �� II VERTICAL \ \ -7 2 ;�; ,� 797.315 TOP== 79q: 4�r �\ I N O IJ T=3-�z_ % 78.16 \\ I I FIENDS WITH -���, C 78 .9'7 1 N V II N=78�f33Fi- \ \\ \\ I i THRUST F=ROM 78 .87 INV OUT=788: �� - �\\� o .\ \�� BLOCKING \ _ � 37-Q7 L.F 15 0%/� / ��� TOP=798.2 \ �. \\ \ M \ 11 c 98.b0 LF 1g' "CPC _ �(0 �� INV IN=y' (1-11) 792.2,0 �.S \ R_ �- c, "' \ INV IN=� (1--10)792.30 \ I \ \gyp, 800 _1 - INV IN=�' 1--13 792.00 33.3i �<' 760 T % 16 CI pf g �� \ INV OUT== 791.90 \\ 15" � F_ ©9-__99� LF ��4„ R p -- ____ �� N) \\\�319� r� CcDpp�� \ \ 1.1099r ��---�-- nJ �� \ I I J 09• S 4 \\ \ \ 2.zz .9s� LF. GCS„ 790 \�� N \ 2 \ \� \� 770 \\ 750 w \ \ �oA 109.40 110.35 197.56 \\ 254.34 127.17 414�7-LIF 8" P'VC 1 B3.79 � LF 8" PVC � H-L-F 8" PVC \ � 7 LF 8" PVC �fr.G& LF 8" MICTI SDR-26 ® -9-0)-% -409- LF 8" PVC SDIR- 6 19 44M SDR 26 ® -;&AMi SDR--26 ® A& \\ 3DR-26 0 fr.6§rh IRON 0 77'1.34�% ' •1 �i% 3.'I 5% --- 6.13% 5.96io ---- 0.913% 780 760 740 0+00 1 +00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 U J J N w U w 0 I- to Zw wI.- 0_ N O JLLI w wZ LLI �>00M 0 < 0Lr) <<orr Z N N O�ZN L OFO I UJ N W U M w���r� �y<In womw c Zzow 0 _� O0CL U J J rc rn O U C rJ 2 7 < LLJ CD�o=U�> ZCDCD-CD LUC:jm-zj-J o= Z cn �i CD >-w�=C.0 M U C71� C7 M Cr N � V w zZD W- ZD Lu I.uLL z� O- z w a C' w g =Q �� •�• ;� N -co U tW VA � •� �WO�d �: < Z_ J O U _ Lu 0 Q z � Z) O p Of LL Z W ILL 0 J 0 LL C/) W z � Q Q0o LL. � Q LU 0 J O M U) Y Q Lu cn O Q O Z 3 O H By Revision PROJECT NUMBER 22-13 DATE OCTOBER 2023 Sheet: C-201 SEE SHEET C-205 CLASS 1 STON INV Ul� I=(� / L=20' 757.21 / W=9 J23 • oo� co)) 2�S p SEWER NOTE: 9+01 CLA' ,� I .n o r ° CLEANOUTS SHALL BE INSTALLED ALONG THE LINES FROM THE OUTFALL TIE-IN TO 40' 30' 20' 10' 0 40' 80, TEE o o �� CLASS 1 JONE , / �� / m o r�'ccc c L d38 „s� d gs 9ZL PHASE 1 DURING PHASE 1 CONSTRUCTION TO FACILITATE TESTING. BOX �� I SSMH A-6 2' 103 LFr6" / BOX �� STA 9+22.53 .� I 2, CASP ; 0.97% N / SCALE: 1 "=40' 3SEM. �s: 4/' (R) , I (6" BU Y DEPTH AT ENTRANCFf / o I �/ I NO BURY ON EXIT DUE TO CK o +42) P� 'I STA 9+30 !0 1 ' ) o " o c, + - p CI ]� ' P INV OUT 1 I w/ H ADWALLS * �^� N � Ln o o A S- B U I L TS: II . • (DESIt, BY OTHERS) J < I ao ao II JITH RAIL/FEN 2 Q=740.3t 2�p r0 if) nj O 9 I SSMH A-7 _ (0 � AS -BUILT SURVEY DATA PROVIDED BY COE FORESTRY &SURVEYING. STA A O+51.0 �� �� `� I� I� (PHASE 1) cnmm TEMP. B. 1.1' JR) I I Q � � U + �>�m o -- A ° .9 I ri `-) 0 0 Ld �r z W o +mzo30 V ` a R P ° CL ^� Q -cop 2 BLOC D1 S.L. STA 10+93.33 / �/ o CI 3-7 'xs w 26. �° \ STA 11+6 .17 N ° 71�Xb w STA 9 30.50 36" RCP CI 3-6 r CI 1-3 0@ --9� 11 o CA N / 3O'R ( YP I N O N O V � r m Z NO I m ' mZ __-I U N m 0Z z ao �5�TA 10+93. 3 �, m c c,�9 cn , m 1 2' 6.00 L o \ 00 \ / 1� 0 S \ 28 0 \ \ m 15" RCP 7C O 7 xy� 1 V_ ' 1.00% 2 \ INV IN 2' LA O �� - N=741.3f N 0 7 <• M Q0 ti v _ N O N O ° °' R NSITION�TO STANDA D o cn S s -- -- L `� CUR STA 9+30-12+10 m m T9 S ° YI 1-4 ' TRA SITION 0 6' SIDE A K I I N I < c' TOP= 1-5E}771. 7 AGA NST CU B w/ 3' G S cc W 0 Oxpx�� ° Qx%� / 09 STA 18+92 c yx� YI 3-17 s 6"x6" HYD. TEE T1 rrl O •� 8.. �, 00 LF P i 6" G.V. &BOX INV OUT=�6968768. 2 , STRI w/ N DOT STD Gp RD RAIL m I I D 6, p0 O A v 4" P 0� O 862.01 & 862.02 AT STA m �,p J� O /6�7 .00 o x G TOP=787.60 5 O Fs �9+ 11+5 (WEST SIDE) & o J /�'o �A� / x �`L,�F �pJ 4� /� INV OUT=785.10 5 HYDRANT ASSEM. 9+40-12�6� EAST SIDE V 5 ` �o ° ti ���+`�� 6" PLU V..+ 52 TA 49 _ 12+ 3 o i� sos o� �1 tea'` c� CI -11 5 2 �6,69STA 13+99 58 © 6-0- �� oy`� / \ 6"x6" HYD. TEE 5 5 R F I 6" G.V. & BOX 57 SS A-13 4 O HYDRANT ASSEM. 5 6 a CT�A 1R9+09. 5 O I C R 29 Q y �SS A- TA 12+97.8 � STA 4+55. 8 N <s ' STA 16+15.53 30 5.4(R 7 ( -11 ) � s SSM A I 0 I x7 / STA 15+58. 5 CI 3-16 O *NOTE: I 31 / % 5.6' (R) P THE DETAILED DESIGN FOR THE HEADWALLS SHALL I / BE SUBMITTED TO THE TOWN OF JAMESTOWN FOR a" p� LPc p pR78�w REVIEW AND SHALL BE APPROVED PRIOR TO dy^ \ / Pic SDR L 0, 350' CL R _ COMMENCEMENT OF INSTALLATION. �x� ya �� / 32 S.L. o �� any TA 14+61.1 8" PUBLI PVC SDR-2 S.L. CI -13 SSMH A 12 N N O Z �` f 33 T P Y7 5.80 110.01 LF STA 16+ 2.19 46 w 8 a �� 3 4 ©1.0 %STORM CI -14 A l 61. 1 7.5' (R \ (44) 0 T=7 3.30 n45 a) LO O Co CD O � a) rM CD L � � W O n 00 a) a) a) O O O O O O n O 00 I__ O N 00 U CD O 1- CA 1- CA 1 O O It 00 O 00 It) O It 00 C4 to O 1* 00 N cD O � n to to ui N 6 to Co I_� 00 ai O cV rM Lri / (6 00 ai � C4 4 ui C6 I-: 00 ai ai ai O O � � cV cV ri rM M to CD to Co CD Co CD Co CD Co I- I- I- I- I- I- I- 00 00 00 00 00 00 00 00 00 00 a) w O O O O O O O O SSMH A•-9 JOJTSIDE DROP) - eng_= 3_z 11 TOP=== , 1� 7'71.88 0 LO 0 N TOP=768.97 O Q' + CI 3-6 INV IIN-��fifi• (A•-8)75'7.3;3 �ri o cri c► � T P=766.72 INV IN=763.90 (3-1 )INV IINZ764.46 (A-10) / '+ + 0000 '+ a; SSMH A--12 IN IN-i'61.28 (3--9) INV IN=765.67 (3-1 )INV )UT=:!�iP / ^ �D r� TCIP=789.3T SSMI� A�_1:3 Q 76 .92, INV OUT=�E�,�$ 757.23 / INV IN=781.85 T•OP 793.51 N IN IN= i 61.28 (3--7) SSMH A- 763.79 / II I i" II II INV OUT:=781.75 INV OUT=787.01 763.59 IN OUT==761.08 TOP=T / / U � a o 766.51 SSMH A--7 _ CI 3--9 O '°� CI i-13 w h a► w INV' IN:= TOP=76�3.9-7 O i TOP=782.32 I 11 LEI 763.39 TOP=766:$1- 7 65.72 6/ INV' OUT 7?.Ay i�''GF INV IN==777.33 �� INV 1I1=7�. 759.22 INV IN=_ 63 4 (37-11A55.19 g i CI 14 INV C)UT= T59.12 57„97 87 INV IN== § Er (:5�-1 /�� rLN � INV OUT=;�77.13 � TOP 787.59 CI 3=16 p_ INV OUT=7E4 7E>3.14 i�a� INV N=783.18 (3-16) TOP=789.12 �_-� / �� // IfJV N=78'� 20 (3-15) INV IN==78 .918 1 oo, % T01 , 65.95 i< <_. 770 1INV OUT=4�6-,2-4E�-76 .75 % �790 INV UT=782.00 INV OUT= 8-3.78 SSMH A-•11 _ CI 3-7 ,� TOIP=787.16 TOP=765.95 / / /// / INV INI=778.42 /i go__I_ I N V I N =�� 764.27 / INV OIJ T==77,M r���� INV OUT=4& lH EI-76 .0.7�� A / -it �/ / 8. '' 760 L 0 cJ Cr �I PC 150 DR 18 W 1= 6ennc in == jou. r� r� r� c Cb c occ r III II �> 4 CL LL 03 LF 96C.A.S.F 0-5" BURY DEPTF 1 I 10+00 TOP='781.62 � _j �3 INV IN=773.59 RC;P c� 8 � `0 �0 (2) 22 �;, INV OUT==773.49 _j VERTICAL BENDS WITH- =�J + _= THRUST / Y BLOCKING 780 i ZDr' R j� CL / 1�. r I- CC /� r0 1 �/ ao V _ ^ c// o III II - - LF 8" DUCTILE IRON 0 -e.6H&% 11 +00 12+00 74.33 4-E49-LF 8"' PV SD,R-26 0 0.73% 11 13+00 1158,.46 LF 8" PVC SDR-26 0 5.7090 14+00 105. 7 LF PVC SDR- 6 C) 4.50% 15+00 RCp 0 1 • l0 z Go (2) 22..5• 04 \ VERTICAL BENDS WITH THRUST T BLOCKING 95.113 F 'B" PVC; SDR-23 0 3.50% 2:i7.91 LF 8" PVC SRD 26 ® 2.010% 16+00 17+00 18+00 19+00 20+00 U J J (n w U w N� O Zw w d N O J W W Z in uj ui M �QO LO QeF O�M 0_ ZNcV � ZOZN OFO I wNwLu >D -j �0Qml fr mW w0c ZZOW O O_�0 CL U J J 0- C� C:I� CD U CD z azLu cr- CDF-0=(.0 .�> ZOCD-CD LUC:jm-zj-J M Z cn t\i CD >-w�=c�O M U N CD r, C m ry r., V w zZD W- ZD Lucz Lit z� O z w - �U F- o C' w g Will t1r) U W tW ^ c7p• -`(N� 141/1 z_ J O a C) N _ � Lu O W z Q > _ Z) O p Of J W U) O LL Z W LL 0 J 0 LL W W z � Q Q0o LL. Q LU 0 J O M I Y Q Lu � 0 Q ILL O z 3 O z) 0 H By Revision TRG 1-MIRRORED BUILDING & ADJUSTED GRADES 1/18/24 TRG 2-REVISED VALVES AT INTERSECTION 1/18/24 PROJECT NUMBER 22-13 DATE OCTOBER 2023 Sheet: C-202 rn �o �r 0 0$ 00 I II 0 CL> �0z IVNOIl332d10 @dWV2l 'llV 1000N d� s! � y� 06 03Ab3S _61. w 38 Ol V3bV SIHl �xZ NI 030V�d 38 -nVHS 96-06 SiINn bad SNVO 31SVM OIdOS_ 'd_S 9Z-b0S OAd onend „9 LIC C-900 PC 150 DR18 W.L. 1 N HAR N o r-K-11 810 m m w�� SEE SHEET C-201 i a � O U rn a STA 2\44 HYYD. TEE m 6' G.V. &BOX CIO HYDRANT ASSEM. a on P, � I 10 Q ° 6„ PLUG \ b 00x� �J I o 0. L MAILBOX UNIT _ 6x16=96 TOTAL OXES) OgKpALE FOREST CT. (50' P BLIC R W 2 g0 0 ►� Y CL R + 11 W.L. + N C PVC I+ o — 0 7L�J SD 2 S.L. o o`� 1e 30'R F- TY . I I _ SSMH C-1 �s STA 2+46.21 I II ---_ a 809 D �� -- _ �8 11.8' (R) 110 _ — q Permanent Utility Easement p 8412 P } --,A O Per DB E E Gc 498 40' TYPE 'A' BUFFER (TYP.) E� 8 0 PUBLIC C-900 PC 9 x-�x— x x x X X X X Y ROAD 0 0 S.R.1355 � o o o o_ ++ - cn - I 0 ----------------------------- a:) "— STA 9+93 12"x8" TEE "' STA 9+49 12"x8" REDUCER 8"x6" HYD. TEE (2) 8 G.V. & BOX 6" G.V. & BOX HYDRANT ASSEM. 0' CL 8" WL Cm ` TA 0+3 . 1 1-18 H NDICAP AMP PER STA 3O'R F88C (TY .) CI 1 Il I: , la) � .. N _ EX. 4' CONCRETE MEDIAN to_ N 0 EOP EOP -------------- w, —lo+ — c, ,. o 0 0000 0000 rn L to r- N 000 p t j O O O O O O O O O O O O 00 00 00 00 00 00 00 00 00 00 00 00 Oto N U) N) d Ld O D' + 00 o II II Q �> a>i Q O SSIMH A-2 _ TOIP=f3e+85 — 805.14 INV IN=71,93:13& 793.1154 00 INV OIJT=79-3-793.44 q IN if >R CL 24" R 0+00 N TOP=805.29 INV OUT=$$4--��3- 1301.98 co M TO 1-14 37.07 LF----" J5" R�P1.43% 238.58 =2-39- LF 8"' PVC SDFt-26 0 -4-.00% 1 +00 2+00 00 u") mi u� 04 C] LnJ 809.531 Top=a99�9&r 803.4-31 INV OUT­43a' 3+00 STA 14+03t LOCATE & TIE-IN TO EXISTING 12" WATERLINE �$_ A- / O x x _x �_X 0 �- EX. 12" PUB IC W.L. _ I -0 O p - o o c _(-p _-.0. Z71 --- 40' 30' 20' 10' 0 40' 80, SCALE: 1 "=40' AS- B U I LTS: 114� AS -BUILT SURVEY DATA PROVIDED BY COI FORESTRY &SURVEYING. (PHASE 1) U J J N w U w N� O H � Z w w 0 N 0 JLj W W Z 0 Ld LO >00M 0<00LO ¢or"' Z N N O��ZN 0FZI0MwNw0 wU�0r� �<Qml wC]mOf W c zzpW O 0 _j 0 CL U J J p O CD CDZaON CJ w � v Z w — Z w ��� LLJ CD�> ZOO—O LUpm-zj-J M Z cn �i CD >�w��LO 2 oo=MUN CD I� L7 M OC n w zZD W- ZD Ic Lu < LuLL z� 0- z Lu V mirD 0 C.7 Lu g Ld _U tW VA .WO�d � •� �: fill Q z_ J O a U _ H O z z ZD Z) O � W H U � J Cn O � � Lu LL J LPL/ 0 " W 0 LL �0w LL. Z Q Q LU C) J 0 Q 0 U Y Lu } ILL ~ O z 3 O By Revision PROJECT NUMBER 22-13 DATE OCTOBER 2023 Sheet: C-203 N X j 3 � so3 �C}ili}� }uauo�aad < _ 011 1 2 o 53a0l U E-WZ11 'W3SSV 1NV8(lkH X08 28 'A'0 „9 331 'aJ.H „9x„8 bmn438 „8x„z L \, > SEE SHEET C-201 .JI I I❑ „o 3NI_lb31VM „8 GN3 DIKLU11UNAL TYPE 1 TYPE �Ssy 0 Z II I zoo o o LO i J b J �y-� to a a `/ uJ W M p0 a a a a I L J V`J OD � 2 v a a e a L-LI I J > 00 a a a a LL c0 Li r1 Id (_0 O -- - O n M n M � 0000 co co 0 r M n M L0 0000 co co O n n ^ ui 0 ui ui 0 0 cO co 0 0 cO I_� r-: 0 0 0 o0 00 00 0i ai 0i O O 0 0 0 0 0 0 oo 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 IN L� CD cn 0o w rK > O LLJ I I L.I W J O < 0 p O < <O � J (n U 00 �I `O J SSMH S-1 _ a TOP==8ta_.&7_ 810.49 k� INV IOU1-=-� 8A7+ 802.54/I SSMH A--1 c� 806.94 TC)P=8AE 00 W 79;5.14• INV I N= i38- 79;5.04 INV OUTS=79r .e- M Nlo 810 + 00 5� aw -CL 8" Wl_ EX. O'�,gOE\S�` WE 0+00 —�� HARVEY RCAD_EF_ — O ' 36.01 .36:13} ILF 8" PVC SIRD 26 ® -MLOR 1 +00 2+00 3+00 4+00 5+00 40' 30' 20' 10' 0 40' 80, SCALE: 1 "=40' AS—BUILTS: 62 . I/ // 44 AS -BUILT SURVEY DATA PROVIDED BY COE FORESTRY & SURVEYING. (PHASE 1) U J J N w U w N� 0 H � Z w w 0_ N O JLj w W Z 0>00M 0 < 0Lr, < M Z N N a00Z0N0 �I O-U L U) LLJ w��0r� cl 0 <M womw c zZOw 0 O_j 0CL U J J 0— C� CD c:j CZ) CDZaON C rJ w iv Z w — Z w LLJ CD �__ co > Z O O — O LUC:jM-zj-J o0ZC/)N0�` w >��vLOO 2 l �� M U CD I,CoMOCr., N V w zZD W- ZD >wcz w z� O Z w C.7 w g Wr =Q : N -co U W tW ^ 6• VA � •� �WOdd �: Q z_ J O a U _ H O z z D O Lu 0 Lu z Elf J C) O L.L J W LL L O I..LN LLI LU z � Q Q C) C) �0< 0 Q z O w v } ILL ~ O Z 3 O 0 By Revision PROJECT NUMBER 22-13 DATE OCTOBER 2023 Sheet: C-204 ysb� 4xV 031Vi303A ,OS ° a D D - J (10 S xp� ay ° o° osX/�� c)+ W .* m m _ �xti�� ° ^ /off W (� O \ \ f l 40' 30' 20' 10' 0 40' 80' �, \ SCALE: 1 "=40' ° — s n o 2 > Q — + 6 730, NORM \ / \ 4 ° o \9�TA 2+75 3 \ \ AS—BUILTS. 71 6" G.V. & BOX AS -BUILT SURVEY DATA PROVIDED BY COE FORESTRY &SURVEYING. \ 3o'R -C (T P. HYDRANT ASSEM. (PHASE 1) o/ YI 3-2 �/ / TOP=767.50 — �" INV IN=758.63 (3-6) CO INV IN=759.79 (3-3) \ N + D X o7622o INV OUT=755.1100 \ \ 45. � o r/ O 8,� X ° BENDS STA 2+92.28 � Cl 3-3 � �_ O x qT 15 & /, S m N a eo �° Q ~ C 0 ES 3-1 (CONCRETE) \ ° �� _ = rn rn cn � N N a; / INV OUT=747.00 ���D 60 /l R wj 6 67 1 L=16' W= 8'-19' s kz z _ + 61 TA 2+ 0.41 D=24" o / / Cl 3-4 CLASS 1 STONE W + m o / / MH -1 m xm m �/STA 62 68' (R)5 / 66 All > �, 63 y 64 �0 -� / / ti � o 0 00 \00 •�. 00 0 a C II •�..... =� SEE SHEET C-206 ' - s 1N3W3SV3 213M3S /.dV11NVS oi�gnd ,oz A3-5 1 0 0 0 0 o TOP=765.80 hX 'r 7S 9Zt m SAd oiignd'T M \� � SEWER NOTE: o W INV OUT=762.80 � _ o = o J CLEANOUTS SHALL BE INSTALLED ALONG THE LINES FROM THE OUTFALL TIE-IN TO �N� cwn b)D� I w x N 40' TYPE 'A' BUFFER (TYP.) PHASE 1 DURING PHASE 1 CONSTRUCTION TO FACILITATE TESTING. O Qiii Qi O Q O r�LLC-`TI�In rrnir /T. .r. SEE SHEET C-202 co W in n oo n M rn rn o N N N N N C4 6 6 6 0 —Len2 th = 130.00' K=32.5—� w --- QYc) i�O p� ��O o c� rLL.� Sri 04 6 c�1 III� �n �i cv r- ; �i I�uj �: ± +_ �: SSMHII 8 -2 — Y II II II II II II II II TOP=43-4�3• 7�70.08 Q > INV I IN= ; 7 55.54 > r>• 5 a� �• o q.> ; a� L) a, w h a, INV OUT=:P&5 E' 7 55.44 11 LEI 11 LEI U CI 3=4--- �� TOP=770.70 'r I IN V I N 1� I IN V OUT 761. 1 + 780 1� -� SSMH A-9 OUTSIDE DROP' w / SS B---1 _ T13P==74�1- 771.138 / TC►P=z� T72.3, INIV IN='s7t-(A-8;175'7.33 `'-' IN'V IN=�:Sfr.� T56.34 INIV IN='764.46 (A-10) o i� INV ClUT:=?r,%-.44 756.24 INIV OUT'=-5�57-:15+- + 757.23 O CI 13 10 Q TOP'=771.99 ccnn INV OUT=-�8-+9-- / '768.37 770 TO 3-9 15" RCP © -4­2� 4.14� I 0+00 CL 8" WL 1161.13 � LF 8" DUCTILE IR4 0 �60% 1 +00 } I �Q47 9- LF 8" DUCTII-E IRON 0 $,-Gellg ---- ---- 0.58%. TI J T P=769.56, IN IN=�4& 4 7130.119 1 N 0UT==-;`-Er944-7,59.99 2+00 3+00 4+00 U J J N W U w N O Z W W d N 0 J W W Z O > 00 M OQOILn Q O M Z N N 1LOuZN OFO I wNwOr� D of w �gQml W O m W c ZZOw 0 O_j-01L U J J CL pj CD c:j cz) CD ZON C rJ w v Z w — Z w LLJI CD�C=0�> ZOO—O LUC:jm-zj-J C= Z cn �i CD >-w��� l �= M U N �� w zZD ZD — WICE cc >w w z Oz� w — L a C' Lu g W -U :W I� z_ J O a U _ H O z F_ z O � W H � 0 J C) O U � LU 0��� O 0 L.L J W 0 J z = Q 0 J W LU 0 Of z U o 07 Y w } LL ~ O z 3 O , By Revision TRIG 2-REVISED VALVES AT INTERSECTION 1/18/24 TRG 3-REVISED FITTING AT END OF WATERLINE 1/18/24 TRIG 4-CLARIFIED TRANSITION & CONC. FES AT END 1/18/24 PROJECT NUMBER 22-13 DATE OCTOBER 2023 Sheet: C-205 I I / I III / I TIE-IN TO EXISTING MANHOLE W/ OUTSIDE DROP STA 0+00.00 / o � ,7,g \1� FLAT -TOP SSMH OF-3 STA 5+66.80 • any / / \\ �0) aR 0) FLAT -TOP SSMH OF-1 �� GAO / •�` 0) STA 1 +10.00 Xr)° •. ti o e� �L I \ + LAT-TOP SSMH OF-2 00 STA 2+30.38 0'y 760 O ' gaimn vr- i _ TOP=�75�:� 753.16 INV 743.29 INV OUT==743:A9-743.'19 750 740 al)mn yr-4-- 756.02 TOP==756:-%- T49.19 INV IN=7494& 749.09 INV OUT==-7494. &_, L 770 !ay Ato 0 N � 0 \C, C� LI 0 w�ULS dN o��0 ������ � 00�CV G, •rd /� / �� 0�' •�� • �'�' 1, Cv r W.% 1 -j i yr--_ SSIMH OF-3 767 09 TOIP= ;7fi� 754 69 INV IN=9154-.13-3- 754 59 INV OIJ T=--7&4.8;3- SEE SHEET C- 202 13 0 0 N 13 0 Z - 66 6 Ld - Ld _ 0 o� N a� 00 LLI Ld y,00 N �. SANIIPn' - \ 2�' PUBL N o o N r J t0 t0 00 2+� I o ct =+oco p � \/ � - C) Al P� Z J V • o F 0 0 0JF / 11I 50 J �� 00 p 60. 1+17.4 , O�`'Slp LO/J �b� Oisl(�SdJI SEE SHEET C- 202 770.08-rOP=7:r'Q-..3& 755.54 INV IN==75&.4 - 755.44 INV OUT= ,%&- FINAL I GRADE 780 L) 7�p FLAT -TOP SSMH OF-4 STA 1+32.57 40' 30' 20' 10' 0 40' 80' SCALE: 1 "=40' AS- BUILTS: AS -BUILT SURVEY DATA PROVIDED BY COE FORESTRY & SURVEYING. (PHASE 1) 0 / w Of � _ IN TO EA. 'A' `3SMIH -8 767.92 TOP=756-.2& Li -iTIE o NA I WITH OUTSIDE DROP /' 7:57.97 INV IN==75ff+7-- Y TOP=749-. 729.7- (2) 3'x3'x1I' �, / 757.87 INV OUT=758-.e7 0 EX.. INV='712.21 / ;3000 PSI _ � AL -_UP_ EX. SHELIF=713.20 CONCRETE -- �• SSMH OF'-4 NEW INV IN=7-2 , 72,4�16; Z IkNCHORS /' N FINAL GF'ADE� + 76T.11 TC)P=7fri�-6& 730 INV IN GROIP=;714.,17 10 �� 0 36' 'D.C., I 760 770 N _ 760.71 INV OUT-=760.85 cn 00 LF 8" DI 108.74 (TOTAL) 88.74 4+9: AEI} LF 8" PVC SD,R-26 0 'F9 O(W. _ 17.03% 0+00 1+00 120.17 4-2448- LF 8" PVC SD ��4.83% 2+00 3+00 335.08 33+Cr.41- L1= 8" PVC SDIR-26 01-.66,% 4+00 5+00 6+00 7+00 EX. GRADE-\ 131.63 -132.57 LF 8" PVC 'SDR_26 40 4 (Ncre 2.08% 0+00 1 +00 2+00 U J J N Ld 0 W _ N H � Zw w d N O JLLI W W Z Ld �>00M 0Qo0Ln <or- , Z N CLo0Z� OF-0I L Ld > pJ Q,QQm l Of womw c ZZpLd O O_j-0CL U J J (- �� CD U zaz zooo Lu C:j m J pCZC/:)NCD j�w�@LO 2 oo=MUN CD r` CoM OC CL V w o= zZD W- ZD o= Wcz Lu z� O z Lu - mi z� C' w g =Q : o Ln dam; AS. N : N .`° •� VA W%.W e �: Q z J 0 a U _ H 0 J > J z Q Z) LL. O Lu H o J U) LL. OwJ ILL 0of0� � LJJ 0 LL � i�: wLumo�^^ J v! Q � J � Q Q ~ 0 Z z 0 C) 07 Lu Y a LL 0 z 3 0 0 By Revision PROJECT NUMBER 22-13 DATE OCTOBER 2023 Sheet: C-206 ('d,ll) 0—d b,01 STA 5+78 END 8" WATERLINE 8" PLUG m E + +� 0 E - m \ — � E `^ m o 6 g \ o o 0 STA 5+82 � W 8"x6" HYD. TEE m 8" G.V. & BOX m 6" G.V. &BOX m g H'f YDRANT ASSEM. v/ 0 E u T o_ - - O o o z m � m m O, � �x 03Ab3S ems. r 38 Ol V3bV SIHl NI 030V1d 38 IIVHS S6-06 S11Nn NOd A6 SNVO 31SVM (1110S_ 0 Ar S'S 9Z-b0S OAd O118f1d „8 �5 @ c 0 v --- 8" PUBLIC C-900 PC EnP 150 DR18 W.L. 1 SEE SHEET C-201 ------- --- f q,3 <i0 a aoco00 v I 1~ — — I Ln D -- 7' Q I II O > �Q Z _ E0 0 Permanent Utility +4 94 - Qo + Easement per DB 8412 PG � O° E E�498 40' TYPE 'A' BUFFER (TYP.) yo 8 x —x �x 12" PUBLIC g x x x x x _ C-900 PC 150 DR18 WL N HAR �. Y ROAD o o S.R.1355 _ N cp _ + o_ — + EX. 4' CONCRETE MEDIAN c� 0 _ o A O O ° D W --_ O IQ O co________- N O f+_ cn -- m r STA 9+93 -- -- 12"x8" TEE-------- 12"x8" REDUCER �--- m STA 9+49 - 2 8" G.V. &BOX _ - 8"x6" HYD. TEE 6" G.V. & Box EOP HYDRANT ASSEM. Ld z Q EOP —lo+ �- - o — \ — C,_ 0 0------------ v 40' 30' 20' 10' 0 40' 80, SCALE: 1 "=40' AS—BUILTS: �% . �► �� 2� AS —BUILT SURVEY DATA PROVIDED BY COE FORESTRY & SURVEYING. (PHASE 1) STA 14+03t LOCATE & TIE-IN TO EXISTING 12" WATERLINE } x S x _x x o 0 EX. 12" PUB IC W.L. I _0 O F c @o m E O c 0 0 0 — cn + o a -- m D_ ------ ------ m O O 820 Lu 0-1 L- w J Q 0 Y Q O J U O O o+ -- 810 _ GRADE cn _ CENTERLINE HARVE:Y ROAD __ _ -- -- -- — — -- -- � E.X. 12r' W.L. \ -- � STA 14+0:3f LOCATE AND TIE TO EXISTING 112" WATERLINE L—STA 5+82 HYDRANT TEE STA 5+78 -.DR 1S W•�� �� Cg (0(0 O�50 TSTA 9+97 END WATERLINE l—STA 9+49 MAINLINE TEE 800 HYDRANT TEE 5+00 6+00 7+00 8+00 9+00 10+00 11 +00 12+00 13+00 14+00 15+00 U J J [n W U C'r W N O H � Z Ld W d N 0 JLj W >> W Z 0>00M p Q O LO 4- PO ZNCV OD0Z000 J — cU 5 w L U)Ld M uj cy cl 0 <M Of W c ZZ0W U O_j-0CL U J J o- C:) o CD z CD U CD LLJ z_Qz r CD cr) zoor-CD w�m�tJ w w z o �> WC l=C.0 CD CV LLJ CD U N C7 r` c-D cy-) r-L u) w W- " rr Lu 0z w z� O— `L_ z w L o C.7 w •p Z J Z � 0 C) o Z z uj z >G o Ljj J LJJ 0 ry U) z W o ILL 0.0� Lu LL LJJ Q J Z � Q 0 C) 0 LL Z O Lu w v > Q } Q LL LL r= = O C Z 3 O By Revision TRG 6-RELOCATED HYDRANT PER PWSS 2/4/24 PROJECT NUMBER 22-13 DATE OCTOBER 2023 Sheet: C-207