HomeMy WebLinkAboutNCC243504_ESC Approval Submitted_20241113 4 Outlook
Review Completed - Stonebriar Way Subdivision
From City of Winston-Salem <noreply@geocivix.com>
Date Mon 9/30/2024 3:26 PM
To jlipka Ipk-consulting.com <jlipka@lpk-consulting.com>
(Si City of
WINSTON-SALEM
NORTH CAROUNA
Application Type: 04.02) Grading/Erosion Control Permit
Workflow: 04.02) Grading & Erosion Control
Project: Stonebriar Way Subdivision
A/P#: EN2400057
Acreage to be Disturbed: 6.10
https://winston-salem.geocivix.com/secure/project/?projectid=1259985
Hello DreamBuilt Construction, Inc.,
Thank you for submitting your project to City of Winston-Salem. Review of the Erosion Control Plan for this
project has been completed. The design is adequate to meet the ordinance standards and the plan has
been approved.
Be aware that this plan shall expire three (3) years following the date of approval, if no land disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Also, acceptance and approval
of this plan is conditioned upon compliance with Federal and State water quality laws, regulations, and
rules.
If you have not already done so, please provide an original signed and notarized Financial
Responsibility/Ownership (FRO) form as applicable. This document is required prior to the issuance of the
Grading/Erosion Control Permit. If this has already been provided, then please disregard this statement.
Reminder that a completed FRO form is not required in the instance where a project qualifies to use the
HB 489 Sketch Erosion Control Plan document.
If this project will disturb more than 1 acre or is part of a larger common plan of development, the
Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the
NCGO1 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the
permit at the following website (https://edocs.deq.nc.gov/Forms/NCG01-NOI). Once coverage is
obtained, please upload a copy of the Certificate of Coverage (COC) to the project documents in the
electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of
coverage under NCGO1 is provided. Please direct questions about the eNOI form to NCDEQ -
DEMLR Stormwater Program staff in the Raleigh central office. If the owner/operator of this project
changes in the future, the new responsible party must obtain a new COC. *** This approval email serves
as the "Approval Letter" that must be uploaded when filing the e-NOI application to obtain the
NCGO1 Certificate of Coverage. ***
As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of
Clemmons, Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically
inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and
the approved Erosion Control Plan. No person shall willfully resist, delay, or obstruct an authorized
representative, employee, or agent of the Erosion Control Division while that person is inspecting or attempting to
inspect a land disturbing activity under the ordinance.
Should you have any questions as you move forward please contact Kent Wall at 336-462-7481 or
kentw@cityofws.org.
Winston-Salem North Carolina and Forsyth County
City Link 311
311 or(336)727-8000
citylink@cityofws.org
100 E.First Street
Winston-Salem,NC 27101
City Directory