HomeMy WebLinkAboutSW3240601_Statutory Permit_20240911 W STATE oFA'
o o,my O
� � n
ROY COOPER 1
Governor
MARY PENNY KELLEY
Secretary
WILLIAM E.TOBY VINSON,]R NORTH CAROLINA
Interim Director Environmental Quality
November 12,2024
SJP I85, LLC
Attn: Steve Pozycki, CEO
389 Interpace Parkway
Parsippany,NJ 07054
Subject: Post-Construction Stormwater Management Permit No. SW3240601
Grace Church Road Industrial
High Density Project
Rowan County
Dear Steve Pozycki:
The Division of Energy,Mineral and Land Resources received a Post-Construction Stormwater Management
Permit Application for the subject project on June 13,2024.
Per 15A NCAC 02H .1042 (3) (c) of the North Carolina Administrative Code, an application is considered
approved per the response times outlined in G.S. 143-215.1,unless one of the following exceptions applies:
(i) The applicant agrees, in writing,to a longer review period.
(ii) A public hearing is required for a final decision.
(iii)The applicant fails to provide necessary information for the Division's review.
(iv)The applicant denies the Division access to records or premises for information gathering.
As none of these exceptions were relevant to your application, it is considered approved per 15A NCAC 02H
.1042 (3) (c).
We are hereby forwarding Permit No. SW3240601 dated September 11,2024, for the construction,operation
and maintenance of the built-upon areas (BUA)and stormwater control measures(SCMs) associated with the
subject project. If the permittee files a request with the Division for a permit modification,the modified project
must comply with the applicable Laws,Rules, and Regulations promulgated and adopted by the North Carolina
Environmental Management Commission, including the Stormwater Regulations set forth in Title 15A NCAC
2H.1000 amended on January 1,2017 (2017 Rules).
This permit shall be effective from the date of issuance until September 11,2032 and does not supersede any
other agency permit that may be required. The project shall be subject to the conditions and limitations as
specified therein. Failure to comply with these requirements will result in future compliance problems. Please
note that this permit is not transferable except after notice to and approval by the Division.
If any parts,requirements, or limitations contained in this permit are unacceptable,you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty(30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee(if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh,NC 27699-6714,or via telephone at 919-431-3000,or visit their website at www.NCOAH.com.
Unless such demands are made this permit shall be final and binding.
This project will be kept on file at the Mooresville Regional Office. If you have any questions concerning this
permit,please contact Brianna Holland in the Central Office at(919)707-9218 or postconstruction@deq.nc.gov.
E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612
NORTH CAROLINA -
oowrow,tot�.imnm,miawiZI- � 919.707.9200
Post-Construction Stormwater Management
Permit No. SW3240601
Sincerely,
Ouqwd aged 4 vu"sa qd&,d
William E. Toby Vinson, Jr.,Interim Director
Division of Energy,Mineral and Land Resources
Enclosures: Attachment A—Designer's Certification Form
Application Documents
cc: Nester Hernandez,PE;Thomas&Hutton; 1020 Euclid Avenue;Charlotte,NC 28216
Michael Gorman,Project Manager;SIP Properties;389 Interpace Parkway;Parsippany,NJ 07054
Thomas O'Kelly,Director;Rowan County Building Inspections; 130 W.Inns Street;Salisbury,NC 28144
Mooresville Regional Office Stormwater File
Page 2 of 2
Post-Construction Stormwater Management
Permit No. SW3240601
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North
Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on
January 1, 2017 (2017 Rules) (the "stormwater rules"),
PERMISSION IS HEREBY GRANTED TO
SJP 185, LLC
Grace Church Road Industrial
Grace Church Road, Salisbury, Rowan County
FOR THE
construction, management, operation and maintenance of built-upon area (BUA) draining to two (2)
sand filters ("stormwater control measures" or"SCMs") as outlined in the application, approved
stormwater management plans, supplement, calculations, operation and maintenance agreement,
recorded documents, specifications, and other supporting data (the "approved plans and
specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and
Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and
maintained in accordance with these approved plans and specifications. The approved plans and
specifications are incorporated by reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until September 11, 2032 and shall be subject
to the following specified conditions and limitations. The permit issued shall continue in force and
effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition. The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al.
1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 680,077
square feet. The runoff from all BUA within the permitted high density drainage areas of this
project must be directed into the permitted SCMs. The BUA requirements and allocations for
this project are as follows:
a. SCM BUA LIMITS. The SCMs labeled DA1 and DA2 have been designed to handle the
runoff from 652,883 and 27,194 square feet of BUA, respectively, within the delineated
drainage areas. This permit does not provide any allocation of BUA for future development
within the delineated drainage area(s).
2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements
listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this
project. Pervious area improvements will be allowed in this project if documentation is provided
demonstrating those improvements meet the requirements of the stormwater rule.
Page 1 of 5
Post-Construction Stormwater Management
Permit No. SW3240601
3. SCM REQUIREMENTS. The SCM requirements for this project are as follows:
a. SCM DESIGN. The SCMs are permitted based on the design criteria presented in the
sealed, signed and dated supplement and as shown in the approved plans and
specifications. These SCMs must be provided and maintained at the design condition.
b. SAND FILTER MEDIA MAINTENANCE: The sand filter shall be maintained in a manner that
results in a drawdown of at least two inches per hour at that sand surface.
4. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause
erosion downslope of the discharge point.
5. VEGETATED SETBACKS. A 30-foot wide vegetative setback must be provided and maintained
in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The
setback is measured horizontally from the normal pool elevation of impounded structures, from
the top of bank of each side of streams or rivers, and from the mean high waterline of tidal
waters, perpendicular to the shoreline.
a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback
except as shown on the approved plans.
b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated
in an SCM must be released at the edge of the vegetated setback and allowed to flow
through the setback as dispersed flow.
6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following
documents to be recorded with the Office of the Register of Deeds:
a. EASEMENTS. All SCMs, stormwater collection systems, vegetated conveyances, and
maintenance access located on property owned by other persons or entities must be located
in permanent recorded easements or drainage easements as shown on the approved plans.
b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance
agreement must be recorded with the Office of the Register of Deeds.
c. FINAL PLATS. If a final plat is recorded, it must reference the operation and maintenance
agreement and must also show all public rights-of-way, dedicated common areas, and/or
permanent drainage easements, in accordance with the approved plans.
d. DEED RESTRICTIONS AND PROTECTIVE COVENANTS. The permittee shall record deed
restrictions and protective covenants prior to the issuance of a certificate of occupancy to
ensure the permit conditions and the approved plans and specifications are maintained in
perpetuity.
7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded
areas of the on-site stormwater system will be repaired immediately.
a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all
operation and maintenance for the project shall follow the Erosion Control Plan requirements
until the Sediment-Erosion Control devices are converted to SCMs or no longer needed.
Once the device is converted to a SCM, the permittee shall provide and perform the
operation and maintenance as outlined in the applicable section below.
b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device
and/or removed or destroyed during construction, it must be restored to the approved design
condition prior to close-out of the erosion control plan and/or project completion and/or
transfer of the permit. Upon restoration, a new or updated certification will be required for the
SCM(s) and a copy must be submitted to the appropriate DEQ regional office.
Page 2 of 5
Post-Construction Stormwater Management
Permit No. SW3240601
8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component
shown in the approved plans and specifications. Prior to the construction of any modification to
the approved plans, the permittee shall submit to the Director, and shall have received approval
for modified plans, specifications, and calculations including, but not limited to, those listed
below. For changes to the project or SCM that impact the certifications, a new or updated
certification(s), as applicable, will be required and a copy must be submitted to the appropriate
DEQ regional office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including the
SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project
and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), stormwater collection system and/or vegetative
conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any infiltrating permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a pervious surface that were not included in the
approved plans and specifications.
g. Other modifications as determined by the Director.
9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if
the project is in compliance with the approved plans and take the necessary following actions:
a. If the permittee determines that the project is in compliance with the approved plans, then
within 45 days of completion, the permittee shall submit to the Division one hard copy and
one electronic copy of the following:
i. The completed and signed Designer's Certification provided in Attachment A
noting any deviations from the approved plans and specifications. Deviations
may require approval from the Division;
ii. A copy of the recorded operation and maintenance agreement;
iii. Unless already provided, a copy of the recorded deed restrictions and
protective covenants; and
iv. A copy of the recorded plat delineating the public rights-of-way, dedicated
common areas and/or permanent recorded easements, when applicable.
b. If the permittee determines that the project is not in compliance with the approved plans, the
permittee shall submit an application to modify the permit within 30 days of completion of the
project or provide a plan of action, with a timeline, to bring the site into compliance.
10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and
maintenance necessary, as listed in the signed operation and maintenance agreement, to
assure that all components of the permitted on-site stormwater system are maintained at the
approved design condition. The approved operation and maintenance agreement must be
followed in its entirety and maintenance must occur at the scheduled intervals.
a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by the
Division and the stormwater rules such as the construction of additional or replacement on-
site stormwater systems. These additional or replacement measures shall receive a permit
from the Division prior to construction.
b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made
available upon request to authorized personnel of the Division. The records will indicate the
date, activity, name of person performing the work and what actions were taken.
11. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the
expiration date of this permit. The renewal request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(3).
Page 3 of 5
Post-Construction Stormwater Management
Permit No. SW3240601
12. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION.
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes.
13. TRANSFER. This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request
must be submitted within 90 days of the permit holder meeting one or more of the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved;
iii. A person or entity who has been lawfully and finally divested of title to the property
on which the permitted activity is occurring or will occur through foreclosure,
bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur;
V. The assignment of declarant rights to another individual or entity;
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2);
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection
will be conducted by Division personnel to ensure the permit conditions have been met and
that the project and the on-site stormwater system complies with the permit conditions.
Records of maintenance activities performed to date may be requested. Projects not in
compliance with the permit will not be transferred until all permit and/or general statute
conditions are met.
14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this
permit and the approved plans and specifications until the Division approves the transfer
request.
a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for
verifying that the proposed BUA within each drainage area and for the entire project does
not exceed the maximum amount allowed by this permit. The permittee shall review and
routinely monitor the project to ensure continued compliance with the conditions of the
permit, the approved plans and specifications.
b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable recorded
documents, and specifications shall be maintained on file by the permittee at all times.
c. MAINTENANCE ACCESS. SCMs, stormwater collection systems, and vegetated
conveyances must be accessible for inspection, operation, maintenance and repair as
shown on the approved plans.
d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property
during normal business hours to inspect all components of the permitted project.
e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions
of a stormwater management permit or the requirements of the stormwater rules is subject to
enforcement procedures as set forth in NCGS 143 Article 21.
f. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
projects conformance with permit conditions.
Page 4 of 5
Post-Construction Stormwater Management
Permit No. SW3240601
g. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site
does not meet one or more of the minimum requirements of the permit. Within the time
frame specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee shall provide
copies of modified plans and certification in writing to the Director that the changes have
been made.
h. OTHER PERMITS. The issuance of this permit does not preclude the permittee from
obtaining and complying with any and all other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or ordinances,
which are imposed by any other Local, State or Federal government agency having
jurisdiction. Any activities undertaken at this site that cause a water quality violation or
undertaken prior to receipt of the necessary permits or approvals to do so are considered
violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS
143-215.6.
Permit issued this the 11'h day of September 2024.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
f>ai,wd"9aa 4 Fuca qa"d
.William E. Toby Vinson, Jr., Interim Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW3240601
Page 5 of 5
Post-Construction Stormwater Management
Permit No. SW3240601
Attachment A
Certification Forms
The following blank Designer Certification forms are included and specific for this project:
• As-Built Permittee Certification
• As-Built Designer's Certification General MDC
• As-Built Designer's Certification for Sand Filter Project
A separate certification is required for each SCM. These blank certification forms may be copied and
used, as needed, for each SCM and/or as a partial certification to address a section or phase of the
project.
Page 1 of 1
Post-Construction Stormwater Management
Permit No. SW3240601
AS-BUILT PERMITTEE CERTIFICATION
I hereby state that I am the current permittee for the project named above, and I certify by my
signature below, that the project meets the below listed Final Submittal Requirements found in NCAC
02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and
specifications on file with or provided to the Division.
Check here if this is a partial certification. Section/phase/SCM #?
Check here if this is part of a Fast Track As-built Package Submittal.
Printed Name Signature
I, , a Notary Public in the State of
County of do hereby certify that
personally appeared before me this day of 120
and acknowledge the due execution of this as-built certification. (SEAL)
Witness my hand and official seal
My commission expires
Permittee's Certification NCAC .1042(4) Completed/ N/A
Provided
A. DEED RESTRICTIONS / BUA RECORDS
1. The deed restrictions and protective covenants have been recorded Y or N
and contain the necessary language to ensure that the project is
maintained consistent with the stormwater regulations and with the
permit conditions.
2. A copy of the recorded deed restrictions and protective covenants Y or N
has been provided to the Division.
3. Records which track the BUA on each lot are being kept. (See Note Y or N
1
B. MAINTENANCE ACCESS
1. The SCMs are accessible for inspection, maintenance and repair. Y or N
2. The access is a minimum of 10 feet wide. Y or N
3. The access extends to the nearest public right-of-way. Y or N
C. EASEMENTS
1. The SCMs and the components of the runoff collection / conveyance Y or N
system are located in recorded drainage easements.
2. A copy of the recorded plat(s) is provided. Y or N
D. SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that Y or N
have an SCM include the following:
1. The specific location of the SCM on the lot. Y or N
2. A typical detail for the SCM. Y or N
3. A note that the SCM is required to meet stormwater regulations and
that the lot owner is subject to enforcement action as set forth in Y or N
NCGS 143 Article 21 if the SCM is removed, relocated or altered
without prior approval.
E. OPERATION AND MAINTENANCE AGREEMENT Y or N
1. The O&M Agreement is referenced on the final recorded plat. Y or N
2. The O&M Agreement is recorded with the Register of Deeds and Y or N
appears in the chain of title.
F. OPERATION AND MAINTENANCE PLAN — maintenance records are
being kept in a known set location for each SCM and are available for Y or N
review.
Page 1 of 6
Post-Construction Stormwater Management
Permit No. SW3240601
G. DESIGNER'S CERTIFICATION FORM — has been provided to the Y or N
Division.
Note 1-Acceptable records include ARC approvals, as-built surveys, and county tax records.
Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach
additional sheets as needed.
Page 2 of 6
Post-Construction Stormwater Management
Permit No. SW3240601
AS-BUILT DESIGNER'S CERTIFICATION GENERAL MDC
I hereby state that I am a licensed professional and I certify by my signature and seal below, that I
have observed the construction of the project named above to the best of my abilities with all due care
and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in
accordance with the permit documents, plans and specifications on file with or provided to the
Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules
and statutes has been preserved.
Check here if this is a partial certification. Section/phase/SCM #?
Check here if this is a part of a Fast-Track As-Built Package Submittal per .1044(3).
Check here if the designer did not observe the construction, but is certifying the project.
Check here if pictures of the SCM are provided.
Printed
Name Signature
NC Registration
Number Date
SEAL: Consultant's Mailing Address:
City/State/ZIP
Phone Number
Consultant's Email address:
O Circle N if the as-built value differs from the Plan. If N is circled, provide an explanation on Page 2.
ON/E = not evaluated (provide explanation on page 2) ON/A = not applicable to this SCM or project.
Consultant's Certification NCAC .1003((3) & General MDC OAs-built ON/E ON/A
.1050
A. TREATMENT REQUIREMENTS
1. The SCM achieves runoff treatment. Y or N
2. The SCM achieves runoff volume match. Y or N
3. Runoff from offsite areas and/or existing BUA is Y or N
bypassed.
4. Runoff from offsite areas and/or existing BUA is directed Y or N
into the permitted SCM and is accounted for at the full
build-out potential.
5. The project controls runoff through an offsite permitted Y or N
SCM that meets the requirements of the MDC.
6. The net area of new BUA increase for an existing project Y or N
has been accounted for at the appropriate design storm
level.
7. The SCM(s) meets all the specific minimum design Y or N
criteria.
B. VEGETATED SETBACKS / BUA
1. The width of the vegetated setback has been measured Y or N
from the normal pool of impounded waters, the MHW
line of tidal waters, or the top of bank of each side of
rivers or streams.
2. The vegetated setback is maintained in grass or other Y or N
vegetation.
3. BUA that meets the requirements of NCGS 143-214.7 Y or N
152 2 is located in the setback.
Page 3 of 6
Post-Construction Stormwater Management
Permit No. SW3240601
4. BUA that does not meet the requirements of NCGS 143- Y or N
214.7 (b2)(2) is located within the setback and is limited
to:
a. Publicly funded linear projects (road, greenway
sidewalk)
b. Water-dependent structures
c. Minimal footprint uses (utility poles, signs, security
lighting and appurtenances)
5. Stormwater that is not treated in an SCM is released at Y or N
the edge of the setback and allowed to flow through the
setback as dispersed flow.
OAs-built ON/E ON/A
C. STORMWATER OUTLETS—the outlet handles the peak Y or N
flow from the 10 year storm with no downslo a erosion.
D. VARIATIONS
1. A variation (alternative)from the stormwater rule Y or N
provisions has been implemented.
2. The variation provides equal or better stormwater control Y or N
and equal or better protection of surface waters.
E. COMPLIANCE WITH OTHER REGULATORY PROGRAMS Y or N
has been met.
F. SIZING -the volume of the SCM takes the runoff from all
surfaces into account and is sufficient to handle the required Y or N
storm depth.
G. CONTAMINATED SOILS — infiltrating SCM's are not Y or N
located in or on areas with contaminated soils.
H. SIDE SLOPES
1. Vegetated side slopes are no steeper than 3H:1V. Y or N
2. Side slopes include retaining walls, gabion walls, or Y or N
other surfaces that are steeper than 3H:1 V.
3. Vegetated side slopes are steeper than 3H:1V (provide Y or N
supporting documents for soils and vegetation).
I. EROSION PROTECTION
1. The inlets do not cause erosion in the SCM. Y or N
2. The outlet does not cause erosion downslope of the Y or N
discharge point during the peak flow from the 10 year
storm.
J. EXCESS FLOWS —An overflow/ bypass has been Y or N
provided.
K. DEWATERING —A method to drawdown standing water has Y or N
been provided to facilitate maintenance and inspection.
L. CLEANOUT AFTER CONSTRUCTION —the SCM has been Y or N
cleaned out and converted to its approved design state.
M. MAINTENANCE ACCESS
1. The SCM is accessible for maintenance and repair. Y or N
2. The access does not include lateral or incline slopes Y or N
>3:1.
N. DESIGNER QUALIFICATIONS (FAST-TRACK PERMIT) —
The designer is licensed under Chapters 89A, 89C, 89E, or Y or N
89F of the General Statutes.
Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "WE",
below. Attach additional pages as needed:
Page 4 of 6
Post-Construction Stormwater Management
Permit No. SW3240601
AS-BUILT DESIGNER'S CERTIFICATION FOR SAND FILTER PROJECT
I hereby state that I am a licensed professional and I certify by my signature and seal below, that I
have observed the construction of the project named above to the best of my abilities with all due care
and diligence, and that the project meets all of the MDC found in NCAC 02H.1056, in accordance with
the permit documents, plans and specifications on file with or provided to the Division, except as
noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules and the general
statutes has been preserved.
Check here if this is a partial certification. Section/phase/SCM #?
Check here if this is part of a Fast-Track As-Built Package Submittal per .1044(3).
Check here if the Designer did not observe the construction, but is certifying the project.
Check here if pictures of the SCM are provided.
Printed Name Signature
NC Registration Number Date
SEAL: Consultant's Mailing Address:
City/State/ZIP
Phone Number
Consultant's Email address:
O Circle N if the as-built value differs from the Plan/permit. If N is circled, provide an explanation on
page 2
ON/E = not evaluated (provide explanation on page 2) ON/A = not applicable to this project or SCM.
This Certification must be completed in conjunction with the General MDC certification under NCAC
02H.1050
Consultant's Certification (MDC .1056) OAs-built ON/E ON/A
A. Two-chambers stem
1. Does the Sand Filter include a Sediment chamber and a Y or N
Sand chamber?
2. The storage volume in each chamber is equivalent. Y or N
3. The incoming stormwater is evenly distributed across the Y or N
surface of the sand.
B. Volume / Elevations
1. The volume of water stored in the sediment chamber and on
top of the sand in the sand chamber is at least 0.75 times the Y or N
treatment volume.
2. The elevation of the bypass device is set at or above the Y or N
ponding depth associated with the storage volume.
3. The ponding depth above the sand surface is six feet or less. Y or N
C. Sand Media / Drawdown /SHWT
1. Does the sand media meet ASTM C33 or equivalent? Y or N
2. The depth of the sand media is consistent with the approved Y or N
tans andspecs and is a minimum of 18".
3. The depth of the sand media over the underdrain is
consistent with the approved plans and specs and is a Y or N
minimum of 12 inches.
4. The sand media provides a minimum drawdown of two Y or N
inches per hour at the sand surface.
5. Open-bottom design —the minimum separation to the SHWT
at the lowest point of the sand filter is consistent with the Y or N
approved plans andspecs and is a minimum of 2 feet.
Page 5 of 6
Post-Construction Stormwater Management
Permit No. SW3240601
6. Closed -bottom design —The minimum separation to the
SHWT at the lowest point of the sand filter is consistent with Y or N
the approved plans and is a minimum of 1 foot.
7. At least one capped clean-out pipe has been provided at the Y or N
low point of each underdrain.
Provide an explanation for every MDC that was not met, or for every deviation from the permitted
condition below:
Page 6 of 6