Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6241007_Stormwater Report_20241111
Bowman [Von7Fl CAROL10A Shahbain Farms Posey Farm Road Raeford, North Carolina (Hoke County) COORDINATE: 34°59'10.0"N 79°07'16.7"W Project No.: 220198-01 -010 Stormwater & Erosion Control Design Report Prepared By: Bowman NORTH CAROLINA 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 EESio Q, S %../y 24627 1J/11J PREPARED FOR: %'•.°'I'4 D A�S".•ss Raeford Development Company, LLC 1. 4,, Attn: Mubarak Shahbain Donald Sever, PE PO Box 2048 NC License No. 24627 Raeford, NC 28376 0: (919) 553-6570 (910) 777-7778 donald.sever@bowman.com OCTOBER 17, 2024 Shahbain Farms—Posey Farm Rd. (Hoke County) 1 I P a g e Bowman [Von7Fl .9 kTUL!NA TABLE OF CONTENTS PAGE • Project Narrative 3 • Design Requirements 4 • Conclusion 4 • Erosion Control 6 Appendix A: Figures 7 • County Soil Survey • Topography Map • FEMA Flood Map • Hydrologic Unit Code (HUC) • Surface Water Classification Map • NOAA Point Precipitation Frequency Estimates • Drainage Area Maps Appendix B: Wet Pond Calculations 8 • CN Values • Infiltration Basin Design • Hydrographs • Stormwater Management Details • Spillway Design • Rip-Rap Dissipator Design Appendix C: Erosion and Sediment Control Calculations 9 • Rip-Rap Aprons • Skimmer Basins • Temporary Diversion Ditches Shahbain Farms—Posey Farm Rd. (Hoke County) 2 Bowman [Von7FlCAULNA PROJECT NARRATIVE This report contains the stormwater and erosion control design calculations for the proposed Shahbain Farms development in Raeford, Hoke County, North Carolina. The report consists of a review of available hydrologic data, methods analysis, development of existing and proposed hydraulic models, and presentation of the impacts of the proposed development in the project. SITE HISTORY The proposed site is located in Hoke County, North Carolina and is within an unincorporated area of McLauchlin Township. The site is along Posey Farm Road to the west, adjacent to single-family residential subdivision along the north, and adjacent to wooded area along the east and south sides of the property. Soils located within the project site as defined by NRCS (National Resources Conservation Service) are described in Table 2. Table 1:Hydrologic Soil Groups Group Description BaB Blaney loamy sand, 2 to 8 percent slopes CaB Candor sand, 1 to 8 percent slopes FaB Faceville loamy sand, 2 to 6 percent slopes GdB Gilead loamy sand, 2 to 8 percent slopes JT Johnston loam WaB Walgeam loamy sand, 0 to 6 percent slopes According to the Web Soil Survey, majority of the subject site falls within the hydrologic soil groups A and C. For the purposes of design, the same hydrologic groups were utilized for both Pre- and Post- Development conditions. PROJECT DESCRIPTION Raeford Development Company, LLC. is proposing to develop a 16.1 acre tract of land. The proposed development consists of a commercial building, including parking areas, drives, and curbs. The project includes approximately ±11.5 acres of land disturbance. STREAMS Puppy Creek is located on-site along the eastern boundary of the parcel. Shahbain Farms—Posey Farm Rd. (Hoke County) 3 Bowman nonx�+ CA UL A FLOODPLAINS The project is shown to be located in within FEMA Flood Zone(s) per FEMA Panel 3710946500J & 3710946400J located in Appendix A. Because the post-developed conditions will not result in a net increase in runoff from the site, no adverse downstream impacts are expected to occur. The development built-upon area will be situated outside of the FEMA Flood zones. DESIGN REQUIREMENTS Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NCDEQ) Stormwater Design Manual. Storm drainage was designed to 10- year. The NC DEQ requires that post-development discharge rates for the site are not to exceed pre- development discharge rates for the one (1)-year - twenty-four (24)-hour duration storm event. Stormwater quantity control will be provided by one new wet pond as part of the development. WATER QUALITY The following criteria below was considered for the design of SCMs in regard to water quality: 1. High density developments must manage and attenuate the first inch of runoff for water quality in an approved Stormwater Control Measure(s) (SCM). 2. The increase in the 1-inch design volume shall be released over a 2-to-5-day period. METHODOLOGY Hydrology and storm water modeling calculations were performed using the latest version of Hydraflow modeling software. Simulations were set up based on information provided within the North Carolina Department of Environmental Quality (NC DEQ) Stormwater Design Manual. The Soil Conservation Service (NRCS TR-55) hydrologic method was utilized for the estimation of stormwater runoff peak rates and the generation of hydrographs for the routing of stormwater flows. Input and results can be found summarized in tables throughout this report and in the appendices. CONCLUSION Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NC DEQ) Stormwater Design Manual. PEAK RUNOFF ANALYSIS • Pre-Development Conditions The site is currently undeveloped open and wooded space and is planned for commercial development. For the purposes of SCM design, one drainage area was analyzed in this report with its own study point, composite runoff curve number and single point of analysis. SCM#1 Pre-Developed Area covers 17.5 acres of the site and directs water to the east corner of the lot. Of this area, approximately 6 acres are from offsite runoff. Shahbain Farms—Posey Farm Rd. (Hoke County) 4 I P a g e Bowman N0aTF! ( .9 at) INA Drainage Area #1 drains uniformly to Puppy Creek. The characteristics for the pre-development condition are shown below and additional calculations such as can be found in Appendix B. A drainage map identifying the basin can also be found in Appendix B. Table 5:Pre-Development Drainage Area Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] SCM #1 Pre-Developed Area 17.5 55 10 • Post-Development Conditions The post-development condition contains one drainage area to the wet pond. Drainage Area #1 consists of the proposed commercial development area. The drainage area collects runoff with catch basins, curb inlets, yard inlets, and drainage pipes that connect to the proposed wet pond SCM. The characteristics for the post-development drainage areas are shown below and calculations can be found in Appendix B. A drainage map identifying the area can be found in Appendix A. Table 6:Post Development Area Summaries Composite Time of Basin ID Area Curve Concentration [acres] Number (CN) (Tc) [min.] SCM #1 Post-Developed Area 17.5 68 10 • Comparison of Peak Discharges The pre- and post- development peak discharges are shown below. Full calculations and hydrographs can be found on Appendix B. Table 6: Total Site Downstream Impact—Normal Condition Pre-Dev. Post-Dev. w/o Detention Post-Dev. w/ Detention Peak Discharge Rate Peak Discharge Rate Peak Discharge Rate Storm Event (cfs) (cfs) (cfs) 1-yr 24-hr 1.55 14.3 0.7 10-yr 24-hr 27.4 55.1 24.3 Shahbain Farms—Posey Farm Rd. (Hoke County) 5 I P a g e Bowman nonx�+ CA UL A WATER QUALITY There will be one wet pond for water quality. Since the project site is located in the Cape Fear basin, the following criteria below was considered for the design of SCMs in regard to water quality and quantity: 1. The increase in impervious and built-upon-area (BUA) on the site will be treated by a stormwater control measure. The impervious area for the post-developed conditions treated by the wet pond is 5.1 acres. 2. High density developments must manage and attenuate the first 1.0 inches of runoff for water quality in an approved Stormwater Control Measure(s) (SCM). The peak flow rate of the first 1.0 inches water quality volume from the SCM must also be shown to be less than the predeveloped peak rate for the 1 year-24-hour storm event. EROSION CONTROL Erosion control measures have been designed in accordance with NCDEQ erosion control standards and regulations to minimize sediment laden runoff from exiting the site. Silt fence will be installed along the low sides of the site prior to construction. The construction entrance will be installed prior to construction commencing. A skimmer basin will be used to treat stormwater runoff prior to leaving the site. Accumulated sediment within the project site will need to be removed and the stormwater wetland constructed to final design conditions prior to final acceptance of the project. SITE STABILIZATION During construction phase, the permanent stormwater wet pond will be utilized as a temporary sediment basin. An additional temporary sediment basin will be installed for the initial phase. Skimmers will be used in the temporary sediment basins to dewater the basin from the surface. After final grading is completed, permanent vegetation shall be applied in accordance with the NCDEQ planting requirements and the landscape plan for this site. Shahbain Farms—Posey Farm Rd. (Hoke County) Wage Bowman [Von7FlC CAUL !!VA APPENDIX A Figures County Soil Survey Topography Map FEMA Flood Map Hydrologic Unit Code (HUC) Surface Classification Map NOAA Point Precipitation Frequency Estimates Drainage Area Maps Shahbain Farms—Posey Farm Rd. (Hoke County) 7 I P a g e Hydrologic Soil Group—Hoke County, North Carolina to (Shahbain Farms) to F ro 671450 671510 671570 671630 671690 671750 671810 671870 671930 671993 34°59'19"N - 34°59'19"N ' Ilk c 1Wer'' .lipi ., _. doe* -• \to - t . ' - aB _ se iv \ IS 1 - ill- . ••� u - .. . ffl \\ iliti B _ WaB FaB - iiir NIF .. �j.Y �'111111111.111114_ 'sm..----l•mmmommommmoml, • �000 L, uA,R, t a a Q. Q 34°59'6"N gj 34°59'6"N 671450 671510 671570 671630 671690 671750 671810 671870 671930 671990 3 3 ro Map Scale:1:2,670 if printed on A landscape(11"x 8.5")sheet. - il Meters N 0 35 70 140 210 Feet 0 ice 200 400 600 Map projection:Web Mercator Corner coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 10/2/2024 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Hoke County, North Carolina (Shahbain Farms) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 C/D Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Hoke County, North Carolina Survey Area Data: Version 22,Sep 9,2024 • • C/D Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 17,2022—May Soil Rating Points 20,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 10/2/2024 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Hoke County, North Carolina Shahbain Farms Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Blaney loamy sand,2 to C 0.8 4.8% 8 percent slopes FaB Faceville loamy sand,2 B 3.5 21.7% to 6 percent slopes GdB Gilead loamy sand,2 to C 6.9 42.9% 8 percent slopes JT Johnston loam ND 2.0 12.1% WaB Wagram loamy sand,0 A 3.0 18.5% to 6 percent slopes Totals for Area of Interest 16.1 100.0% USDA Natural Resources Web Soil Survey 10/2/2024 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Hoke County,North Carolina Shahbain Farms Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 10/2/2024 Conservation Service National Cooperative Soil Survey Page 4 of 4 UU I- cm CERTIFICATE OF EXEMPTION I , MELVIN A. GRAHAM, CERTIFY THAT THIS PLAT WAS DRAWN o z F ui� P4o� NOTE: UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER d ui o w m 0- I CERTIFY THAT THIS PLAT IS EXEMPT FROM THE DEVELOPMENT THIS PROPERTY IS SUBJECT TO ANY AND ALL CAR MY SUPERVISION ( DEED DESCRIPTION RECORDED IN BOOK 692 , 11 U J W LL mil ORDINANCE UNDER THE DEFINITIONS OF SUBDIVISION CONTAINED EASEMENTS, RIGHT OF WAYS, AND AGREEMENTS Q-. 04 i PAGE I , ETC. ): THAT THE BOUNDARIES NOT SURVEYED ARE W _a!G x X r'SITE IN N. C. G.S. 153A-335 AND SECTION I. 5 OF THE HOKE COUNTY OF RECORD PRIOR TO THIS PLAT. �O ��ES S i p�I. E =U 14I2 q CLEARLY INDICATED AS DRAWN FROM INFORMATION FOUND IN UBD IV I S ION ORD i NANCE. a SEAL ( BOOK N/A , PAGE N/A : THAT THE RAT I 0 OF PRECISION OR ���+���� LOT 32 CO ` � POSITIONAL ACCURACY AS CALCULATED IS I : 10,000 ; THAT `� BD ,V I S ION ADM I RATOR DATE �. 3-67, MAP 6 L-3417 I THIS PLAT WAS PREPARED IN ACCORDANCE WITH G. S. 47-30 AS `' o �, �� �<"� O J„, AMENDED. WITNESS MY ORIGINAL SIGNATURE, LICENSE NUMBSR in cr, AND SEAL T IS 14 DAY OF APRIL , A. D. 2022 a q z 1422 ' ' ` ` • 'O�� GSA/ � cV N. ` A 0 D CDd9 NOT TO SCALE N \ •�� LOT 22 'c : • MELVIN A. GRAHAM, PLS. REGISTRATION NUMBER L-347 I zt7 VICINITY MAP \\ SL. 3 LOT 23 g ` \\'.�•; • Q w z q< \ LOT 24 , \ 3L. 3-52, MAP 6 • o Q w LOT 25 \ SL. 3-52, MAP 6 \ \ GQVR� EIP •-•' �/ wp0m05 SI. 3-52, MAP6 \� , ` _ i � - � \ %G� /�1 ck tim a w - / 5 A P! �? \\ 1 "-f -Lpy\.\�' a HEATHER E. BARNES :' THIS NOTE : SURVEY IS OF ANOTHER CATEGORY SUCH AS 11 • 1389, PG. 518 •F. THE RECOMBINATION OF EX I ST I NCB PARCELS, A \ g6 D.B.' EIP \ti COURT-ORDERED SURVEY OR OTHER EXCEPTION TO LOT 26 \ ALLEN CRIGGS LOT 31 Yy F LIV I T I�iO*N F S U ! VISION. �. 3-52, MAP 6' �� SL. 3-52, MAP 6 ‘" CP D.B. 1380, PG. 244 a SL. 3-67, MAP 6 mot <b.`l; 0 ' ' c.0 1 EIP LOT 30 6 !6, SURVEYOR ` / SL. 3-52, MAP 3 p -+A ` ' / 2 ASI � � . JOSEPH W. SHEETS re to.,co Z- 1 \ / D.B. 1343, PG. 877 v, ns N I CONTROL CR. v SLIDE 3-87, MAP 3 / LOT 28 �° �' 1 w �?I EIP of STATE OF NORTH CAROL INA EI EIP SL. 3-52 MAP 6 .(5-, - (� m{ \•E COUNTY OF HOKE L35 ` '-- 0.78% "E De LOT�xs �2 I �I N T4°�\g3` /� I REVIEW OFFICER OF HOKE COUNTY, / 23p, EIP �• S-52, MAP 6• 1 �' EIP egg• //. CERTIFY THAT THE MAP OR PLAT TO WHICH THIS CERTIFICATION / 78 EIP L3�. IS AFFIXED MEETS ALL ST TUTORY REQUIREMENTS FOR • • / EIP L37 • EIPL3g RECORDING.�- I- 'a0�.'> a t L1:�� / • D. . 69t, Pa I �. DATE . V I • W OFFICER = St.. 4-7, MAP I • o NORTH BY / • SL. 2-51 , MAP I / . BOBBY L. POSEY 7/ EIP 0 c CURVE RADIUS LENGTH CHORD CH.BEARING COURSE BEARING DISTANCE D.B. 155, PG. 86 EIP • • ' ' ' • • ' • EIP' I 50.00' 9.62' 9.61' N T3°06'S4"E I S 54°40'14"E 46.83' ero • • 2 S 28°52'57"E 21.56' 3 S 38°00'09"E 26.57' • w 4 S 03°41'30"E 30,61' ,kr { 5 S t I°i t'40"E 43.97' ��ti BOBBY L. POSEY 67 S o9°I2 5i"E 21.o h • • NOTE: ALL POINTS ALONG C/I CREEK o °` PG. t 7- 8 S 25 3 I 52 W 26.50' \ D.B. 692, I ARE CALCULATED POINTS ° " \ n� 4, UNLESS OTHERWISE NOTED. 9 S 13°22'S8"W 26.07' ''� LOT 2 cn - • " </y . S 53°47 07"E 39.89, \ sL. 2-51, MAP I M TRACT A r o ; ti �' 2 S 2 109 36"E 91.79' L' I 6. I I AC. .'�te/ NOTE: RUN OF CREEK IN PROPERTY LINE 3 S 06°38'30"W 30.58' .• 4 S 24 45 02 W 20.36' 5 S 03°27'08"E 72.10' CO. .ROL CR. ''•�c� 6 S 26°52'45"E 18.93' EIP • 7 S 62°30'34"E 17.79' 8 S 2v IO'02"E 27.31' ram, -Si S 58°22'36"E 33.44' ' 20 S 35°1 2'58"E 37.39' • �a 2 i S 55°47'53"E 28.19' �% 22 S 34°I2'33"E 49.21' \ NIP " < • 23 S i 0°44'04"W 36.85' "J. ,. 24 S 32°47'23"W 32.40' r D.S, elm, PO. I ' fN 25 S 06°29'38"W 22.52' \ S 6?0 0± 26 S 20°46'28"E 44,15' ` 4� ?z2+ (Zr 27 S 69°37'10"E 39.89' 4.60, E 28 N 86°05'38"E 16.84' NIP "' L28•. 2a.. 29 S 57°05'54"E 49.23' L30.., 30 S 77°I6'37"E 48.51' NIP •• 31 S 45°38'54"E 72.04' N 67.5r, • e 32 S 77°48'59"W 25.03' , `�/. 33 N 18°I O'2 I"W 79,16' 2+W 34 N I8°10'2 I"W 83.66' 1261.08' 3 •0 35 S 79°32'12"E 17.57' • \ m` NIP 0 S 89°00'02"W - EIP t3�.:•. Q,o 36 N66°16'12"E 84.22' /- 37 N 74°05.04"E 77.23' 38 N 74°27'48"E 28.53' 6 - ,i-^-� FF,¢ 39 N 73°19'08"E 22.89' N 40 N 48°21'12"E 23.05' �S BOBBY L. POSEY a1 1•52'/ D.B. 692, PG. I s 77°4-6`59"4/ LOT 2 -•--�f - POSEY FARM ROAD SL. 2-51, MAP 1 �.-- - I00 0 100 200 300 S.R. 1412 60' R/W EIP 342.20' (PAVED ROAD) 121.11_ 0IP 192.38' _ - - S 88°21'46"W EIP GRAPHIC SCALE - FEET Elp S 88°21'51"-W s 88°18'29"W cok1TTR°L CR. LOT I-A `� BUTCH T. POSEY PIN $ 494650301225 SL. 4-38, MAP 6 - - \ D.B. 434, PG. 616 \ _ _ _ LOT 3 # TOWNSHIP COUNTY STATE \, SL. 2-51, MAP I PIN 494640001 I43 McLAUCHLIN HOKE NC LOT I-B - ' SL. 4-38, MAP 6 , - PIN # 494650301355 SURVEY FOR DATE: NOTES: LEGEND: .- ' PROPERTY CONSIST OF ALL OF D.B. 1138, PG. 922 AND A 04i I I i2022 NIP-NEW T ON IRONIP PIPE OR IRONO ROD - ' PORTION OF D.B. 692, PG. I BY THE BOBBY L. POSEY NIP NEW IRON PIPE OR IRON ROD - - RAEFORD DEVELOPMENT NRPS-NEW RAILROAD SPIKE ' PROPERTY AS RECORDED IN HOKE COUNTY REGISTRY" SCALE: ERRS-EXISTING RAILROAD SPIKE COMPANY, LLC. 11, = I ool NPK-NEW P.K. NAIL NORTH CAROL INA, HOKE COUNTY EPK EXISTING P.K. NAIL PRESENTED FOR REGISTRATION ON THE ____ DAY ECM C/L-CENTER LINE OF _ LO AT ___�__ML PP-POWER POLE OWNER: BOBBY L. POSEY LP-LIGHT POLE RECORDED AT ____��__� 423 POSEY FARM ROAD 4022 R/W-RIGHT OF WAY \ PROPERTY ZONED R-20 RAEFORD, NC 28376 CP-CALCULATED POINT MELVIN A. GRAHAM, PLS. REVISION: -E- -ELECTRICITY REGISTER OF DEEDS - ASS' T. DEPUTY - GROUND ELEVATION \ 3679 N ICHOLSON ROAD -X-X-X- FENCE CAMERON, NC 28326 PHONE( 919 )499-6 174 7 MOnft 11 >T ' XI \ IL.° # = V/fi, —11f\ 4.. Ja• (,),_./....„--T--:.-1- NKIPt 0 •o Pip3874000mNtroP."4"11 „_ 225 CC tn A \-K, *\ .____ % ; • o Off/ v225hsJ ..• zROCKF/SH , O� Q il Vs O it ti O 73 A $ _ �� z 1?;3 )___ 175 \ _ s�'f �,s l \-\ ti� i 1ti5 72 io, - ,,., .-4, ii lik \ .s,:s us ...-1.. \)) ,06, \IIIIIIj,4)/ cy - ii,011111111111111111111111111111111.° vgcy 4. A.........-----...___ y- i7 ,, e IS National Flood Hazard Layer FIRMette - FEMA _Legend 79°7'30"W 34°59'27"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT `% 160 FEET - _ , Without Base Flood Elevation(BFE) Zone A,V.A99 • *� L' With BFE or Depth Zone AE,AO,AH,VE,AR % OM SPECIAL FLOOD a -- - , f •a HAZARD AREAS Regulatory Floodway 160 !i I •. e • 0.2%Annual Chance Flood Hazard,Areas f • r . of 1%annual chance flood with average \ • depth less than one foot or with drainage .� • Ilk •' , areas of less than one square mile zone x 11:.' Future Conditions 1%Annual 11ki • Chance Flood Hazard zone x . r \ �" Area with Reduced Flood Risk due to 711,0r;- \ OTHER AREAS OF Levee.See Notes.zonex �r , . • ElfFLOOD HAZARD �� Area with Flood Risk due to Leveezone D III:\ eft r • , .It ililli:: 4 ` �� `� • NO SCREEN Area of Minimal Flood Hazard zonex 1 f f t f Effective LOMRs k 1 4-111111. 46500J 15g FEES OTHER AREAS Area of Undetermined Flood Hazard zone D •t ? 10/17/2006 _ 173"5 --- .^ I L o DWAY GENERAL - - Channel,Culvert,or Storm Sewer - STRUCTURES I I I I I Levee,Dike,or Floodwal� • Zone A r • Zone AE 0 20.2 Cross Sections with 1%Annual Chance • Water Surface Elevation Ho COUNTY t�5 A lb • \ e- - - Coastal Transect It -•••••513^^^^'•• Base Flood Elevation Line(BFE) ,`r' 4114 370397 Q Limit of Study AREA'OF MINIMAL 1-LOOD HA i RD tr.. • , Zone AE \ 7•_„� --- CoastalJurisdiction TransectBoundary Baseline '-a " " �� \ OTHER - — Profile Baseline 0 • i I 0.�/ FEATURES Hydrographic Feature I • • Digital Data Available N 1. \ No Digital Data Available • •• T A MAP PANELS Unmapped H I ' � • • - • I\ y�� r , ,,�h 9 The pin displayed on the map is an approximate 00 / ..�j point selected by the user and does not represent do I . , an authoritative property location. It igli . . ‘• • This map complies with FEMA's standards for the use of j, • OrAi k % - • 4 digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap �/f` , . 3710946400J 1 . © % <� accuracy standards • • ` `fit ••t{ •� �++ • �.' 1 The flood hazard information is derived directly from the et ` eff. 10/17/2006 authoritative NFHL web services provided by FEMA.This map 1 i r was exported on 5/23/2024e at 2:16 PM and does not reflect changes or amendments subsequent to this date and _ time.The NFHL and effective information may change or r ••• become superseded bynew data over time. -• . Itilille -4, '. + This map image is void if the one or more of the following map V. elements do not appear:basemap imagery,flood zone labels, •• • +' ) I z - legend,scale bar,map creation date,community identifiers, s ` ` FIRM panel number,and FIRM effective date.Map images for Feet 1:6 79°6'53"W 34°58'58"N unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 '�0� regulatory purposes. Basemap Imagery Source:USGS National Map 2023 • rn # O0 40 ‘r ill" ' . d f • 1'Z • _r i i • • • i �� • • • • • )101P1' i • • UM CI # i : , ., -%n SWEEIG r • • • , ++ • • 0. • PAN • # •• • • 5? • • • t 1� c..) •\ • , • GAP • • • 11 • i ••• • • CN • •qsy • • • • •qLF, i -_ • • • • i r PIN NO. 494650301225 Disclaimer OWNER NAME RAEFORD DEVELOPMENT COMPANY ADDITIONAL OWNER This data was prepared for the inventory of real property found within this jurisdiction,and is compiled from recorded deeds, plats, PHYSICAL ADDRESS 469 POSEY FARM RD and other public records and data. Users of the data are hereby notified that the aforementioned public primary information sources 0 270 540 1,080 Feet should be consulted for verification of the information. Hoke I i i i I i i i I May 23, 2024 County and mapping companies assume no legal responsibility for the information. Lower Puppy Creek ED x `, Zoom to h Rd Subwatershed(12) Lower Puppy Creek HUC 12 030300040606 Watershed(10) Rockfish Creek HUC 10 0303000406 HUC 8 03030004 Severs Rd River Basin Cape Fear < > - 2of3 N -o cc L 7 r u a, A O, .c C7 -o C o rp 1 , E T a P0- } Surface Water Classifications: ED - x qz0,r»t..1 Sa(d in 1, kbrep Stream Index. 18-31-19 • Stream Name: Puppy Creek r„) Description: From source to Rockfish Creek `),, 3 2. O Classification: C d Date of Class.: June 30,1973 a v z What does this Class_mean? d cw �;;,, River Basin: Cape Fear '"ab• Rocky ,h %'m• ot. 4rs.h • 'Sl ^V �, Ivy rood�ri �� Gatsby Dr f Beaver Creek co„ 3 G 6 y Ha,n plc nUr a, ¢y ,0-`' _ 0 PROJECT SITE E. f9� _ PhohP4 Church Rd NOAA Atlas 14,Volume 2,Version 3 et,'"°°' Location name: Raeford,North Carolina,USA* ,,,u ' 1 V a Latitude:34.9872°,Longitude: -79.1213° _ nonn • ..:3 • Elevation:204 ft** 6" *source:ESRI Maps w�N m **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration - 1 2 5 10 25 50 100 200 500 1000 5-min I 0.435 0.513 0.599 0.664 0.741 0.798 0.851 0.902 0.965 1.01 (0.396-0.481) (0.467-0.568) (0.544-0.663) (0.602-0.733) (0.669-0.817) (0.718-0.877) (0.762-0.935) (0.803-0.990) (0.852-1.06) (0.889-1.11) 10 min 0.695 0.821 0.960 1.06 1.18 1.27 1.35 1.43 1.53 1.60 1(0.632-0.769) (0.747-0.909) (0.872-1.06) (0.962-1.17) (1.07-1.30) (1.14-1.40) (1.21-1.49) (1.27-1.57) (1.35-1.68) (1.40-1.75) 15-min 0.869 1.03 I 1.21 1.34 1.50 1 1.61 1.71 1.80 1.92 2.00 (0.790-0.961) (0.939-1.14) (1.10-1.34) (1.22-1.48) (1.35-1.65) (1.45-1.77) (1.53-1.88) (1.61-1.98) (1.70-2.11) (1.76-2.20) 30-min I 1.19 1.43 1.72 1.95 2.22 2.42 2.62 2.81 3.06 3.24 (1.08-1.32) (1.30-1.58) (1.57-1.91) (1.76-2.15) (2.00-2.44) (2.18-2.66) (2.34-2.88) (2.50-3.08) (2.70-3.36) (2.84-3.56) 60-min 1.48 1.79 2.21 2.53 2.95 3.28 3.61 3.94 4.39 4.74 (1.35-1.64) (1.63-1.98) I (2.01-2.45) I (2.30-2.80) (2.66-3.25) 1 (2.95-3.61) (3.23-3.96) (3.51-4.32) (3.87-4.81) (4.15-5.20) 2-hr 1.73 2.09 2.64 3.05 3.61 I 4.06 4.52 4.98 5.61 6.12 (1.56-1.95) (1.89-2.36) (2.37-2.96) (2.74-3.42) (3.22-4.05) (3.61-4.55) (3.99-5.06) (4.37-5.57) (4.88-6.28) (5.28-6.84) 3-hr 1.83 2.22 2.80 3.27 3.92 4.45 5.00 5.59 6.41 7.07 (1.65-2.07) (2.00-2.50) (2.52-3.16) (2.93-3.68) (3.49-4.40) (3.94-5.00) (4.39-5.61) (4.87-6.25) (5.52-7.17) (6.03-7.91) 6-hr 2.18 2.65 3.35 3.91 4.70 5.36 I 6.04 6.77 1 7.81 8.65 (1.98-2.44) (2.39-2.95) (3.02-3.73) (3.52-4.35) (4.20-5.22) (4.75-5.94) (5.32-6.69) (5.90-7.48) I (6.72-8.61) (7.36-9.53) 12-hr 2.58 3.12 3.96 4.66 5.64 6.46 7.33 8.27 9.62 10.7 (2.32-2.88) (2.82-3.48) (3.57-4.43) (4.18-5.19) (5.02-6.26) (5.71-7.16) I (6.41-8.11) (7.16-9.14) (8.20-10.6) (9.04-11.8) 24-hr 3.03 3.67 4.66 5.45 6.54 7.42 8.32 9.26 10.6 11.6 (2.82-3.28) (3.41-3.97) (4.32-5.04) (5.04-5.88) (6.02-7.05) (6.81-7.99) (7.62-8.97) (8.45-9.98) (9.59-11.4) (10.5-12.5) 2-day 3.52 4.25 5.35 6.23 7.44 8.41 9.41 10.4 11.9 13.0 (3.28-3.78) (3.96-4.57) (4.98-5.75) (5.78-6.69) (6.87-7.99) (7.74-9.03) (8.64-10.1) (9.55-11.2) (10.8-12.8) (11.8-14.0) 3-day 3.74 4.51 5.64 6.54 7.79 8.79 9.82 10.9 12.3 13.5 (3.50-4.01) (4.21-4.83) (5.26-6.04) (6.09-7.00) (7.22-8.33) I (8.12-9.40) (9.04-10.5) (9.98-11.7) (11.3-13.2) (12.3-14.5) 4-day 3.96 4.77 5.94 6.86 8.14 9.17 10.2 11.3 12.8 I 14.0 (3.71-4.23) (4.47-5.09) (5.55-6.33) 1 (6.41-7.32) (7.57-8.68) (8.49-9.77) (9.44-10.9) (10.4-12.1) i (11.7-13.7)1 (12.8-15.0) 7-day 4.60 5.51 6.78 7.79 9.17 I 10.3 11.4 12.6 14.2 15.4 (4.30-4.92) (5.15-5.89) (6.33-7.26) (7.26-8.32) (8.52-9.80) (9.52-11.0) (10.5-12.2) (11.6-13.4) (13.0-15.2) (14.1-16.6) 10-day1 5.28 6.30 7.63 8.67 10.1 11.2 12.3 13.4 15.0 16.2 (4.97-5.61) (5.92-6.69) (7.16-8.10) (8.13-9.20) (9.42-10.7) (10.4-11.9) (11.4-13.1) (12.4-14.3) (13.8-15.9) (14.9-17.2) 20-day 7.12 8.44 10.1 11.3 13.0 14.4 15.7 17.1 18.9 20.4 (6.72-7.55) (7.96-8.96) (9.47-10.7) (10.6-12.0) (12.2-13.8) I (13.4-15.2) (14.7-16.7) (15.9-18.1) (17.5-20.1) (18.8-21.7) 30-day 8.85 10.4 12.2 13.6 15.4 16.8 18.2 19.6 21.4 22.9 (8.38-9.37) (9.88-11.1) (11.6-12.9) (12.8-14.4) (14.5-16.3) (15.8-17.8) (17.1-19.3) (18.3-20.8) (20.0-22.8) (21.2-24.3) 45-day 11.2 13.1 15.2 16.7 18.7 20.2 21.6 23.1 25.0 26.4 (10.6-11.8) (12.5-13.9) (14.3-16.0) (15.8-17.6) (17.6-19.7) (19.0-21.3) (20.3-22.8) (21.7-24.4) (23.4-26.4) (24.6-28.0) 60-day 13.4 15.7 17.9 19.6 21.8 23.4 25.0 26.5 28.5 30.0 (12.7-14.1) (14.9-16.5) (17.0-18.8) I (18.6-20.6) (20.6-22.9) 1 (22.1-24.6) (23.6-26.3) (25.0-28.0) (26.8-30.1) (28.2-31.8) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. IPlease refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based depth-duration-frequency (DDF) curves Latitude: 34.9872°, Longitude: -79.1213° Average recurrence 30 — interval (years) i :: : — 2 p a ,a) p —— 510 oc 15 - 111M — 25 ro ca. — 50 200 a 500 5 - / — 1000 o - . .I ; a ; C C_ C C C i- L " L- " >. > >, >, >. T A T>+•_ - _ _ L L t t t E E E E E N A b ,� v -f 00 -o v 7 v v v v v r-1 N 0 M Duration N ^ O N RRI Ct 30 - 25 - c •-= Duration 20 _ aa, — 5-min — 2-day v c 15 - - • 1 — 10-min — 3-day z 15-min — 4-day o. — 30-min — 7-day 10 - f� — 60-min — 10-day I.. �;� J — 2-hr — 20-day 5 — 3-hr - 30-day — 6-hr — 45-day 0 _ — 12-hr — 60-day - 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Thu May 23 16:15:04 2024 Back to Top Maps & aerials Small scale terrain NOAA Atlas 14,Volume 2,Version 3 et,'""`N. Location name: Raeford, North Carolina, USA* � '° Latitude: 34.9872°, Longitude: -79.1213° - none • 4'i • Elevation:204 ft** 0") °" 'source:ESRI Maps w N^ **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration - - 1 2 5 10 25 50 100 200 500 1000 5-min 5.22 6.16 7.19 7.97 8.89 9.58 10.2 10.8 11.6 12.2 (4.75-5.77) (5.60-6.82) (6.53-7.96) (7.22-8.80) (8.03-9.80) (8.62-10.5) (9.14-11.2) _(9.64-11.9) (10.2-12.7) (10.7-13.4) 10-min 4.17 1 4.93 5.76 6.37 7.09 7.62 8.12 8.57 9.16 9.58 (3.79-4.61) (4.48-5.45) (5.23-6.37) (5.77-7.03) (6.40-7.81) (6.86-8.38) (7.27-8.92) (7.64-9.41) (8.08-10.0) (8.40-10.5) 15-min 3.48 4.13 4.86 5.37 5.99 6.43 6.84 7.22 7.68 8.01 (3.16-3.84) (3.76-4.57) (4.41-5.38) (4.87-5.93) (5.40-6.60) (5.79-7.07) (6.12-7.51) (6.43-7.92) (6.78-8.43) (7.03-8.80) 30-min 2.38 2.85 3.45 3.89 4.44 4.84 5.24 5.62 6.11 6.49 (2.17-2.64) (2.59-3.16) (3.13-3.82) (3.53-4.30) (4.00-4.89) (4.36-5.33) (4.69-5.75) (5.00-6.16) (5.40-6.71) (5.69-7.13) 60-min 1.48 1.79 2.21 2.53 2.95 3.28 3.61 3.94 4.39 4.74 (1.35-1.64) (1.63-1.98) (2.01-2.45) (2.30-2.80) (2.66-3.25) (2.95-3.61) (3.23-3.96) (3.51-4.32) (3.87-4.81) (4.15-5.20) 2-hr 0.864 1.05 1.32 1.52 1.81 2.03 2.26 2.49 2.81 3.06 (0.778-0.973) (0.943-1.18) (1.18-1.48) (1.37-1.71) (1.61-2.03) (1.80-2.28) (1.99-2.53) (2.19-2.79) (2.44-3.14) (2.64-3.42) 3-hr 0.610 0.738 0.933 1.09 1.30 1.48 1.66 1.86 2.13 2.36 (0.549-0.688) (0.665-0.833) (0.838-1.05) (0.976-1.22) (1.16-1.46) (1.31-1.66) (1.46-1.87) (1.62-2.08) (1.84-2.39) (2.01-2.64) 6-hr 0.364 0.442 0.558 0.653 0.785 0.894 1.01 1.13 1.30 1.44 (0.329-0.407) (0.399-0.493) (0.504-0.622) (0.587-0.727) (0.701-0.872) (0.793-0.991) (0.888-1.12) (0.986-1.25) (1.12-1.44) (1.23-1.59) 12-hr 0.213 0.258 0.329 0.386 0.468 0.536 0.608 0.686 0.798 0.891 (0.192-0.239) (0.233-0.289) (0.296-0.367) (0.346-0.430) (0.416-0.519) (0.473-0.594) (0.532-0.673) (0.594-0.758) (0.681-0.881) (0.750-0.982) 24-hr 0.126 0.153 0.194 0.227 0.272 0.309 0.346 0.386 0.440 0.483 (0.117-0.136) (0.142-0.165) (0.180-0.209) (0.210-0.244) (0.250-0.293) (0.283-0.332) (0.317-0.373) (0.352-0.415) (0.399-0.474) (0.436-0.521) 2-day 0.073 0.088 0.111 J 0.129 0.154 0.175 0.196 0.217 0.247 0.270 (0.068-0.078) (0.082-0.095) (0.103-0.119) (0 120-0.139) (0 143-0.166) (0.161-0.188) (0.179-0.210) (0.198-0.234) (0.224-0.266) (0.245-0.292) 3-day 0.051 0.062 0.078 0.090 0.108 0.122 0.136 0.151 0.171 0.187 (0.048-0.055) (0.058-0.067) (0.073-0.083) (0.084-0.097) (0.100-0.115) (0.112-0.130) (0.125-0.145) (0.138-0.161) (0.156-0.183) (0.170-0.201) 4-day 0.041 0.049 0.061 0.071 0.084 0.095 0.106 0.117 0.133 0.145 (0.038-0.044) (0.046-0.053) (0.057-0.065) (0.066-0.076) (0.078-0.090) (0.088-0.101) (0.098-0.113) (0.108-0.125) (0.122-0.142) (0.132-0.156)1 7-day 0.027 0.032 0.040 0.046 0.054 0.061 0.067 0.074 0.084 0.091 (0.025-0.029) (0.030-0.035) (0.037-0.043) (0 043-0.049) (0.050-0.058) (0.056-0.065) (0.062-0.072) (0.068-0.080) (0.077-0.090) (0.083-0.098) 10-day 0.021 0.026 0.031 0.036 0.041 0.046 0.051 0.055 0.062 0.067 (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.033-0.038) (0.039-0.044) (0.043-0.049) (0.047-0.054) (0.051-0.059) (0.057-0.066) (0.061-0.071) 20-day 0.014 0.017 0.020 0.023 0.027 0.029 0.032 0.035 0.039 0.042 (0.013-0.015) (0.016-0.018) (0.019-0.022) (0.022-0.025) (0.025-0.028) (0.027-0.031) (0.030-0.034) (0.033-0.037) (0.036-0.041) (0.039-0.045)1 30-day 0.012 0.014 0.016 0.018 0.021 0.023 0.025 0.027 0.029 0.031 (0.011-0.013) (0.013-0.015) (0.016-0.017) (0.017-0.019) (0.020-0.022) (0.021-0.024) (0.023-0.026) (0.025-0.028) (0.027-0.031) (0.029-0.033) 45-day 0.010 0.012 0.014 0.015 0.017 0.018 0.020 0.021 0.023 0.024 (0.009-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.016) (0.016-0.018) (0.017-0.019) (0.018-0.021) (0.020-0.022) (0.021-0.024) (0.022-0.025) 60-day 0.009 0.010 0.012 0.013 0.015 0.016 0.017 0.018 0.019 0.020 (0.008-0.009) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.019-0.022) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based intensity-duration-frequency (IDF) curves Latitude: 34.9872°, Longitude: -79.1213° 101 • • • I Average recurrence interval ` (years( c 10° - �\ — 5 ._ �: — 25 o .„ — 50 100 a _ — 200 V �- v \ - 500 a - — 1000 10-z __ i L L -c .c t E E E E E N di ib ,� .0 -f 00 -o-aa 7 v v v v v r-1 N in 0 M Duration N ^ 0 0 m it;VD 101 - j- r t C _ Duration :' 100 . MO c — 5-min — 2-day ar 0111111 c — 10 min — 3-day 11011 c 15-min — 4-day — 30-min — 7-day ;° 10-1 - � - — SO min — 10 day 'a 0 — 2-hr — 20-day a — 3-nr — 30-day -- — 6-hr — 45-day 10-2 1 — 12-hr — 60-day I i I I - 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Thu May 23 16:16:16 2024 Back to Top Maps & aerials Small scale terrain / \ \ C \ I / /\ s \\ \ E I 10 \ ,,,,, \ „ ,.., s \-- � ......, s> i „,,, /, ,9 ..... ‘o \ ,. G3 \ \ ‘1110 —i i �`\ I\I II <`r_ r - ' - ) 1/ - \ ' .. \11',, ("CL ,\I U \, / /t,' ,1.. ' ; c 3 ,f ) F' ( 1 , , , , f .,„ hi ' Cr PRE DEVELOPED DA 1 1 1 I MI s o I v , t' 0 1 \ 1. o\ , „.. ..„...--- ,,......T,,,...,..;-;775 . // / �\_\�1_ \ 182.766��� \\\\ 5�., :��,�.r•...) ��- t I ,-r Li ,I I I `m ,,, 116 ,, , ot- --------,:, , .„„,.. \ /, , , , , , , , c.„ -\\ '� I � v olil � h � �--, .y � i 1 \-‘.\\\ . �I N �� ro 1 1 \`\ P ,05 m \ J1 • a )1\i„! ' I�1rl°' � � \\ Q / ! / "lbA-180 W - �� Q CC 4-I 0 CC iiii___ ifc 0 11 .,----\\i //;-'' ... °... gl --ii, -1;,, \ WL Q } z (1 Z N / 1,,,,,‘ w b o o % r ,, • ,,,• CL \ it i\ \: fr. I • .07 �' ' �' yl Q OD 97 �\ ,, 0 11 s ��� PRELIMINARY \ `"� _ O \ Lss DO USE L USE FOR \ ss as ° O O \ \\ti \� \N �\ ,o CONSTRUCTION \ a \ \ 790 /r�.. \ 11: SS '_oP�H[ss o..1y \ .F 195 • �, _ Q,a 17 " \\ \ �. 1 ? 246ii'd!7/2:�' 1 /�J \1\ \ Q \<\ \\ %O•'�•'s,61 NEEp••4h:\ ' _ '95 \ l `v \\Y - 1 ll \,VVtl .\ '�"vALD A.S�;�.'. 1. Q \\�\ �-, ,� I I (� �v \ PLAN STATUS \ a - 206 t, \` \ \ r o � ,p `f ` \\ � / ` El3# 10/17/202415T SUBMITTAL r ` ( \\ \\ \ \ � � \\ 6EFOREYOUDIG\ o �\ \\ `�- ^ STOP P• 1 V \ N \�. " CALL 1 ONE I632d949 DATE DESCRIPTION \ '� ' _+1210- ■ -� ����� - .� \ \\\ \\ \\ N.C.OTSTHEIAWNTER Know what's below. DS KXO DS — z —_ I Call before you dig. DESIGN DRAWN "K° \\ � \\ \ SCALE 2:198-0' 10B No. 220198-01-010 j — �� GRAPHIC SCALE \ 11 \ --'_ DATE OCTORER 17,2024 7 \ eh , ,� FILE No. \ \ _/ \\ m IN FEET) DDX 1 inch= 80 ft. SHEET Cod file name:V:\220198-J@K General Contractor,Inc\220198-01-010(ENG)-Shahbain Fauns Posey Farm Rd Raeford NC\Engineering\Engineering Plans\Construction Documents\220198-01-010-DDXdrg \ I C/ \ \ (...-------- \ i \\/ \ . ----' ------ \ (CI i \ - \ \ \ s ' \-: s 6A s O ait 10 / q1 I n i ''' 1 J 0 r - :)\--\ ) ,f/\r \ \ • \ cN:\,,,\\W Ti \, ‘ •' . . • (3 ) ,f ( ri—ic-=----- 0----17 7 ` CO do \) � \ \ ' Q 1 bCr Le•>,\ \ ^ ( ( ( Jp /�� P \ I gLLJ/ o m a aD �\ I - \` \ \\ \S "E �o � W E 74/ / I I C90 ` U R O U NU � 11 I^ \ \\\\ \ A ,I L" • _ _ 1 \ , e \ , y z Nm3 z • 1 182766 , \ .->' :7: `y / I E ¢ E E . v �.e � al11a i1r / m :--,,,,,,,:,,,,,,,,,.0\,-\\\,\,,,,,,,N,....,,,, Iyy-1 ) ,r '',. ip tit f y ' lik IR /ICI \ w Q / i %� `'jam � �80 . , Q z 11,11 tc‘'-'9*-261->%:/-1''':1////1 ci 4 riElE .1 \: ..... . -- .---.___-e)t____ t ___Y. ____ \ ,1 Ill < cc \*,(i • ,, 4•1 CC C) \ 1 g:/ 0 - 1 ) I 11111 D a = \ � } z i Etiiib 0 P2I LU - ►4111017:_irj3:•—wAk-117740\ii\ 0 cc a .�.__ �\ > a p s �c �I�/� 0 0 --/] DaC IL ��a 4i p0����� 3 .1 \ *\'\\ . . -' ' / .1 , / ' \ '5':' 11(0,423 L e it \ I 000 0 \ ) ill gat-ANNIUMININIIA ►,%�m y, I I I 0_a o ‘� 97�1 ®� oo : .•,„s, Fj ' I A I �' so d, PRELIMINARY ��' �, I I I I I ` � � : Lss DO NOT v` ��;�,,,,jiiiiL* \* \101" * ,6s, ----<_,,,,---..,,,.0 \ USE FOR � �`s� a * � y \g r O Q 1 �- -\ \� \\ �\ CONSTRUCTION gore �C fi 0 .,.4.1k .r-1 zoo . ,CARp• \ \ \ / aril `' ��� _ \ \\ S 'oP C55%'. /' 1 _.—— t95 ��_ • Qc1a \ v vvv 1 i 2i611 j0!7/11 \ oo �� a 5 �� u\ \ � J I I 1 I L\\v \ F ''''..,___ \\ :7\1111;-.-- lkdil . i\\777\ \. Q. \\� \\ \\ I I I �� \\r PLAN STATUS a 20 4. \\ \ r� o \ \ l� f `� \\ / 10/17/2024 1ST SUBMITTAL - - e _ \ 1 0 L 4 L\ �v �`� I II \ \ \ \ \\ \\` l \ �EFORE'DIG` O LI 1414411.\ 0 1 POST DEVELOPED DA 1\\ 9 \ 1 �� -- STOP a DATE DESCRIPTION \ 210Ill o ° \ _17.50 AC `� CALL T fi32P (eV ■ �� \ NC.ONE-CALL CENTER I DS KXO DS , \ \ \_\_��� _ _—1_1\:- \ - - �,\ ` / Know what's below. IT'SZLLAW DESIGN DRAWN CHKD j \ \ - Call before you dig. SCALE "=60' \ \ JOB No. 220198-01-010 � \ ------ \ �� GRAPHIC SCALE\1 \ DATE OCTOBER 17,2024 1 -� sa FILE No. ( IN FEET) DDP 1 i ch= 60 ft. SHEET Cod fle name:V:\220198-JOB General Contractor,Inc\220198-01-010(ENG)-Shahbain Farms Posey Form Rd Raeford NC\Engineering\Engineering Plans\Construction Documents\220198-01-010-DDP.dog Bowman [Von7FlC CAUL !!VA APPENDIX B Wet Pond Calculations CN Values Wet Pond Design Hydrographs Stormwater Management Details Spillway Design Rip-Rap Dissipator Design Shahbain Farms—Posey Farm Rd. (Hoke County) Wage Bowman North Carolina,Ltd. Shahbain Farms,Hoke County,NC Curve Number Calculation (CN) Post-Developed Conditions(Wet Pond) Total IA Drainage Area(acres): 17.50 SF Acres Pavement 142400 3.3 Sidewalk 49070 1.1 Existing Soil Groups: Building 31424 0.7 Sod Group Llap Symbo Soil Description Acres 'ercent of DA Total IA 222894 5.1 A NoA/WaB rfolk loamy sand,Wagram loamy s; 17.50 100% 17.500 Open Space 539406 12.4 Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# 'Veighted CN Open Space-Good Stt A 12.40 55 682.0 Impervous Area A/D 5.10 98 499.8 Cumulative Curve#= 67.5 Proposed Wet Pond Project Information Project Name: Shahbain Farms Project#: 220198-01-010 Designed by: DS Date: 9/9/2024 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 17.54 Acres 764,176 sf Impervious Area (IA) = 5.12 Acres 222,894 sf Percent Impervious (I) = 29.17 Required Surface Area Permament Pool Depth: 3.00 ft SA/DA= 1.143 Min Req'd Surface Area = 8,731 sf(at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non-Coastal County Determine Rv Value = 0.05 + .009 (I) = 0.313 in/in Storage Volume Required = 19,901 cf(above Permanent Pool) Elevations Top of Pond Elevation = 154.00 ft Temporary Pool Elevation = 152.60 ft Permanent Pool Elevation = 152.00 ft Shelf Begining Elevation = 152.00 ft Forebay Weir= 151.00 ft Shelf Ending Elevation = 153.00 ft Bottom Elevation = 148.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 32,000 sf Volume of Temporary Storage = 70,548 cf Is Permenant Pool Surface Area Sufficient(yes/no)? Yes ( 32000 > 8731 ) sf Volume of Storage for Design Storm = 70,548 Yes ( 70548 > 19901 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD-Water Quality Volume Project Information Project Name: Shahbain Farms Project#: 220198-01-010 Designed by: DS Date: 9/9/2024 Revised by: Date: Checked by: Date: Water Quality Orifice Incremental Determination of Water Quality Volume Drawdown Time Zone 3 Q3=0.0437 CD*D2(Z-D/24-Ei)^(112) • Zone 2 Q2=0.372 CD*D`(Z-Ei)^(312) ♦ Zone 1 Q1 =0 r Orifice Diameter(D)= 3 in Cd= 0.6 Ei= 152 Orifice Inv. Zone 1 Range= 0.00 to 152 Zone 2 Range= 152 to 152.1 Zone 3 Range= 152.1 to 154 Incremental Drawdown Method Contour Incremental Drawdown Countour Z Zone Area Volume Stage, Q Time sq ft cu ft ft cfs min 152.00 32,000 0 0.00 2.00 0.000 -- 153.00 35,420 33,710 1.00 3.00 0.221 2,545 154.00 38,256 36,838 2.00 3.00 0.323 1,900 Total -- 70,548 -- -- -- 4,445 Drawdown Time=Incremental Volume/Q/60sec/min Summary Total Volume= 70,548 cf Total Time= 4,445 min Total Time= 3.09 days 9/10/2024 Prop Wet Pond#1-new volume_Shahbain Farms.xls 1 of 1 Proposed Wet Pond Project Information Project Name: Shahbain Farms Project#: 220198-01-010 SF AC Designed by: DS Date: 9/9/2024 TOTAL DA TO POND 764176 17.5 Revised by: Date: IMPERVIOUS Checked by: Date: PARKING 142400 3.3 BLDG 31424 0.7 Site Information SIDEWALK 49070 1.1 Sub Area Location: Drainage to Proposed Pond 222894 5.1 Drainage Area(DA)= 17.50 Acres Impervious Area(IA)= 5.10 Acres DA TO PIPE OUTFALL 502714 11.5 Percent Impervious(I)= 29.17 %(Drainage Area) 5.998 0.519725 Orifice Sizing Orifice Size= 3.00 in (Diameter) Drawdown Time= 3.09 days (Incremental Draw Down Method) less than 5 days(yes/no)? yes greater than 2 day(yes/no)? yes Anti-Flotation Device 4'x 4' Outlet Structure Area: 0.0 sf Volume: 0.0 cf (Water Displaced-Top of Pond to Bottom of Pond) Weight: 0 lbs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 0.0 lbs Volume of Concrete Req'd: 0.0 cf (Unit WT of Concrete=150 pcf) Volume Provided: 0.0 cf (4'x4'riser x 2.5'=40 sf,5'x5'footing x 1.5'=37.5cf) 1 Watershed Model Schematic HydraflowHydrographsExtensionforAutodesk®Civil3D®byAutodesk, Inc.v2022 1 -Pre 2-Post E m 3-Post through Pond lipl Legend Hyd. Origin Description 1 SCS Runoff Pre 2 SCS Runoff Post 3 Reservoir Post through Pond Project: V:\220198- J&K General Contractor, Inc\220198-01-010 (ENG)-Shahbain Farms iPoeetAoritti Rt1CRatiattl NC\Engineering 2 Hydrograph Return Period Recap Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 1.548 27.45 Pre 2 SCS Runoff 14.31 55.12 Post 3 Reservoir 2 0.739 24.28 Post through Pond Proj. file: V:\220198-J&K General Contractor, Inc\220198-01-010 (ENG)- Shaibiire ynl969*/ Rd Raeford NC\Engineerin! 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.548 2 726 13,240 Pre 2 SCS Runoff 14.31 2 722 42,065 Post 3 Reservoir 0.739 2 912 38,286 2 152.65 97,053 Post through Pond V:\220198-J&K General Contractor, Inc\2201 filltaaOR®r(ei(1;)Y-ahahbain FarmItGalsajyFQ Rd/F252fbrd NC\Engineering\Design 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,09/10/2024 Hyd. No. 1 Pre Hydrograph type = SCS Runoff Peak discharge = 1.548 cfs Storm frequency = 1 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 13,240 cuft Drainage area = 17.500 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 2.00 - 2.00 I 1.00 - 1.00 0.00 _ 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,09/10/2024 Hyd. No. 2 Post Hydrograph type = SCS Runoff Peak discharge = 14.31 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 42,065 cuft Drainage area = 17.500 ac Curve number = 68* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.03 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(5.100 x 98)+(12.400 x 55)]/17.500 Post Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 15.00 15.00 • 12.00 — • 12.00 9.00 9.00 6.00 6.00 3.00 - 3.00 0.00 - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,09/10/2024 Hyd. No. 3 Post through Pond Hydrograph type = Reservoir Peak discharge = 0.739 cfs Storm frequency = 1 yrs Time to peak = 15.20 hrs Time interval = 2 min Hyd. volume = 38,286 cuft Inflow hyd. No. = 2 - Post Max. Elevation = 152.65 ft Reservoir name = Pond 1 Max. Storage = 97,053 cuft Storage Indication method used. Wet pond routing start elevation=152.00 ft. Post through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 - 3.00 iliallisi."--W 0.00 — 0.00 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 97,053 cuft Pond Report 7 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,09/10/2024 Pond No. 1 - Pond 1 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation. Begining Elevation=148.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 148.00 1,200 0 0 3.00 151.00 32,000 39,393 39,393 4.00 152.00 35,420 33,692 73,085 5.00 153.00 38,250 36,822 109,907 6.00 154.00 41,000 39,613 149,520 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 3.00 0.00 0.00 0.00 Crest Len(ft) = 15.00 0.00 0.00 0.00 Span(in) = 3.00 0.00 0.00 0.00 Crest El.(ft) = 152.60 0.00 0.00 0.00 No.Barrels = 1 0 0 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El.(ft) = 152.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length(ft) = 50.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 148.00 0.00 --- --- --- 0.00 --- --- --- --- --- 0.000 3.00 39,393 151.00 0.00 --- --- --- 0.00 --- --- --- --- --- 0.000 4.00 73,085 152.00 0.00 --- --- 0.00 0.000 5.00 109,907 153.00 0.13 oc --- --- --- 9.87 --- --- --- --- --- 9.997 6.00 149,520 154.00 0.18 oc --- --- --- 64.60 --- --- --- --- --- 64.78 8 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 27.45 2 722 79,424 Pre 2 SCS Runoff 55.12 2 722 144,528 Post 3 Reservoir 24.28 2 732 140,690 2 153.33 122,803 Post through Pond V:\220198-J&K General Contractor, Inc\2201 11tia0R®r(01139-1Slaahbain FarmFarmIR2EalsaliFlaErA F001/F252fbrd NC\Engineering\Design 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,09/10/2024 Hyd. No. 1 Pre Hydrograph type = SCS Runoff Peak discharge = 27.45 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 79,424 cuft Drainage area = 17.500 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 — , \ - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,09/10/2024 Hyd. No. 2 Post Hydrograph type = SCS Runoff Peak discharge = 55.12 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 144,528 cuft Drainage area = 17.500 ac Curve number = 68* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(5.100 x 98)+(12.400 x 55)]/17.500 Post Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) — Hyd No. 2 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,09/10/2024 Hyd. No. 3 Post through Pond Hydrograph type = Reservoir Peak discharge = 24.28 cfs Storm frequency = 10 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 140,690 cuft Inflow hyd. No. = 2 - Post Max. Elevation = 153.33 ft Reservoir name = Pond 1 Max. Storage = 122,803 cuft Storage Indication method used. Wet pond routing start elevation=152.00 ft. Post through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 41=ININ. 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 122,803 cuft DESIGN OF RIPRAP OUTLET PROTECTION New York DOT Dissipator Method For Use in Defined Channels (Source: "Bank and channel lining procedures New York Department of Transportation,Division of Design and Construction.1971.) Guide to Color Key: User Input Data Calculated Value Reference Data Designed By: DS Date: 9/9/2024 Checked By: Date: Company: Bowman ,Project Name: Shahbain Farms Project No.: 220198 Site Location(City/Town) Raeford Culvert Id. 101 Estimation of Stone Size and Dimensions For Culvert Aprons Step 1) Compute flow velocity ve at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch,arch and box culverts,and paved channel outlets. D.=A.where A.=cross-sectional area of flow at outlet. For multiple culverts.use Ds=1.25 x Do of single culvert. Velocity(ft/s) 11.1 Opening type Pipe Culvert Single or multiple openings? Single Outlet pipe diameter,Do(ft) 2 NOTE 1:If opening type is anything other than"Pipe Culvert",Do A0 (Cross-sectional area of flow at outlet). NOTE 2:If multiple openings,Do 1.25 x Do of single culvert. Step 3 Fun apron grades of 10%or steeper,use recommendations For next higher zone. (Zones 1 through 6). Zone 2 Figure 8.06c Will apron have>/=10%grade? No NOTE:For apron slopes equal to or greater than 10%,use next higher Zone in Figure 8.06d to determine apron length. Apron length(ft) 12 Figure 8.06d Determination of Stone Sizes For Dumped Stone Channel Linings and Revetments Step 1. Use figure 8.06.©to determine maximum stone size(e.g.for 12 Fps='_0"or 550 lbs. Max.stone size(in.) 16 Figure 8.06e Step 2. Use figure 8.06.0 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs.for 75%of stone,and the maximum and minimum range in weight should be 25-500 lbs.). NOTE:In determining channel velocities for stone linings and revetment. use the following coefficients of roughness: Diameter Mannng's Min.thickness (inches) "n" of lining (inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Charnels) (Dissapatars) Min.&max range of stones(Ibs) 25-250 Figure 8.05f Weight range of 75%of stones(Ibs) 50-250 Figure 8.05f Bowman [Von7FlCAUL !!VA APPENDIX C Erosion and Sediment Control Calculations Rip-Rap Aprons Skimmer Basins Temporary Diversion Ditches Shahbain Farms—Posey Farm Rd. (Hoke County) 9 I P a g e Selection of Sediment Control Measure 17.5 Total Drainage Area (Acres) 35 Peak Flow from 10-year Storm (cfs) Q is calculated based on Drainage Area Do Not Use Temporary Sediment Trap Do Not Use Skimmer Sediment Basin User entry Okay Temporary Sediment Basin Calculated Value 11.3 Disturbed Area (Acres) 11.3 Updated to comply with NPDES Permit Conditions TGH and BRB 07/03/2012 Updated to provide instructions and additional checks JEC 07/17/2023 Temporary Sediment Basin Simplified design Okay 11.3 Disturbed Area(Acres) Imported from the"Measure Selection"tab. 35 Peak Flow from 10-year Storm(cfs) 20331 Required Volume ft3 Minimum sediment storage volume. Based upon the disturbed area. 15246 Required Surface Area ft2 Required surface area of basin. Based upon peak flow for the entire drainage area. 87.3 Suggested Width ft 174.6 Suggested Length ft Trial Top Width at Emergency Spillway Invert ft Trial Top Length at Emergency Spillway Invert ft Trial Side Slope Ratio Z:1 (2.5:1 or flatter) Trial Depth ft (2 to 13.5 feet above grade) Depth as measured from bottom of basin to crest of emergency spillway. 101 Bottom Width ft 258 Bottom Length ft 26058 Bottom Area ft2 56520 Actual Volume ft3 Okay 30510 Actual Surface Area ft2 Okay Use Spillway Capacity Sheet to Size Primary and Emergency Spillways 3 Skimmer Size(inches) Skimmer Size Formula based on the use of a Faircloth skimmer type 0.25 Head on Skimmer(feet) (Inches) 2.aOrifice Size(1/4 inch increments) 1.5 2.82 Dewatering Time(days) 2 Dewatering time is computed for the REQUIRED volume and takes into consideration the head on skimmer and orifice size. Suggest about 3 days 2.5 The skimmer must take at least 2 days and no more than 5 days to dewater the REQUIRED volume. 3 4 5 6 8 Check L:W ratio Check dam height(max.15 ft) Okay 2:1 to 6:1 Okay Water surface for 10-year storm can be no greater than 13.5 feet in depth(13 ft+0.5 ft of head on spillway assumed). Cleanout elevation(ft) rairr Elevation of bottom of basin near riser structure 149.0 Depth at one-half of sediment storage volume. Elevation to be staked in the field. ElNORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS »>-rpm Name TD#1 Discharge 18.7 Channel Slope 0.025 Channel Bottom Width 2 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Silt Loam(SM) DS150 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS150 Straight 18.7 cfs 4.77 ft/s 0.99 ft 0.035 1.8 lbs/ft2 1.54 lbs/ft2 1.17 STABLE D Unvegetated Underlying Straight 18.7 cfs 4.77 ft/s 0.99 ft 0.035 1.32 Ibs/ft2 0.95 Ibs/ft2 1.38 STABLE D Substrate S75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern S75 Unvegetated Straight 18.7 cfs 5.34 ft/s 0.92 ft 0.03 1.6 lbs/ft2 1.43 lbs/ft2 1.12 STABLE D Underlying Straight 18.7 cfs 5.34 ft/s 0.92 ft 0.03 1.17 Ibs/ft2 0.9 Ibs/ft2 1.31 STABLE D Substrate DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 18.7 cfs 5.34 ft/s 0.92 ft 0.03 1.6 lbs/ft2 1.43 lbs/ft2 1.12 STABLE D Unvegetated Underlying Straight 18.7 cfs 5.34 ft/s 0.92 ft 0.03 1.17 Ibs/ft2 0.9 Ibs/ft2 1.31 STABLE D Substrate ElNORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>TD#2 Name TD#2 Discharge 10 Channel Slope 0.01 Channel Bottom Width 2 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Silt Loam(SM) DS150 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS150 Straight 10 cfs 2.4 ft/s 1.03 ft 0.046 1.8 lbs/ft2 0.64 lbs/ft2 2.81 STABLE D Unvegetated Underlying Straight 10 cfs 2.4 ft/s 1.03 ft 0.046 1.32 Ibs/ft2 0.39 Ibs/ft2 3.34 STABLE D Substrate S75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern S75 Unvegetated Straight 10 cfs 2.95 ft/s 0.89 ft 0.034 1.6 lbs/ft2 0.56 lbs/ft2 2.87 STABLE D Underlying Straight 10 cfs 2.95 ft/s 0.89 ft 0.034 1.17 Ibs/ft2 0.35 Ibs/ft2 3.33 STABLE D Substrate DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 10 cfs 2.95 ft/s 0.89 ft 0.034 1.6 lbs/ft2 0.56 lbs/ft2 2.87 STABLE D Unvegetated Underlying Straight 10 cfs 2.95 ft/s 0.89 ft 0.034 1.17 Ibs/ft2 0.35 Ibs/ft2 3.33 STABLE D Substrate