HomeMy WebLinkAboutSW6240502_Response To Comments_20241105 BECKER
MORGAN
GROUP
ARCHITECTURE
ENGINEERING November 05,2024
PLANNING OUR
CLIENTS'SUCCESS Jacob Beeker
Stormwater Permitting Engineer
North Carolina Department of Environmental Quality
DEMLR Post-Construction Stormwater Program
Fayetteville Regional Office
512 N. Salisbury Street, Office 625Z
Raleigh,North Carolina 27604
RE: Complete Stormwater Management Submittal
DOLLAR GENERAL DUNN
Dunn,North Carolina
BMG Project No. 2023218.00
Permit No: SW6240502
Dear Mr. Beeker:
Becker Morgan Group is submitting the complete documentation for a High-Density
Stormwater Management Permit on behalf of Rhetson Companies,Inc. (Applicant/Developer)
for a Dunn,North Carolina commercial development. The project includes a wet pond facility
and per NCDEQ request we have included the following documents with this submittal:
• Comment Response Letter(included in this document)
• Signed O&M Agreement(wet signed copy to be mailed)
• Signed EZ Supplement(wet signed copy to be mailed)
• Two (2)hard copy and One(1) electronic copy of Site Plans folded two(2) full-sized
BECKER MORGAN GROUP,INC. sealed, signed, and dated.
3333 JAEcKI.E DRIVE,SUITE 120
WIININCTON,NORTH CARouNA28403 Finally,we offer the following explanation to the comments that were given below:
910.341.7600
1.
615 SourN CoueoE STEEEr,SUrLE 9-112
CHARWME,NoRIli CAROUNA 28202 a. NCDEQ Comment: The temporary pond elevation for a wet pond is set by the
980.270.9100 invert of the lowest bypass device. This differs from the elevations of something
like the 1" storm, or a water quality elevation. Please revise the O&M Agreement
314 EAsr N STREET and line 25 of the wet page of the Supplement-EZ to refer to this elevation.
a,ArroN,NORTH CAROUNA 27520 pondp g pp
919.243.1332 b. BMG Response: The subsequent submission of the O&M Agreement will now
show the Temporary pond elevation at 177.60'which is the lowest elevation of
PORT EXCHANGES l� the 6" x 6" orifice or the lowest bypass device. Similarly, the subsequent
WEST MAN S 312 WETREFrET,,SUrre 300
SAusBURY,MARYLAND 21801 submission of the Supplement-EZ Form will now show line 25 the temporary
410.546.9100 pond elevation to be 177.60'.
309 SOUTH GOVERNORS AVENUE
DOVER,DELAWARE 19904 2.
302.734.7950 a. NCDEQ Comment: There is an inconsistency in the BUA accounting between the
supplement and the Application. In the Entire Site column of the Supplement,
THE TOWER
OVERYBOSTARCS 25 831 sf of BUA is claimed for parking space. In the wet pond column,24 872 sf
100 Dlsc;ovERr BOULEVARD,Suns 102 >
NEWARK,DEIAwARE 19713 of BUA is proposed,which matches what is listed in the application.
302.3693700 b. BMG Response: The areas accounting for the difference in the BUA come from
www.beckermorgan.com the proposed entrance between the parcel boundary and the LOD that could not
BECKER
MORGAN
GROUP
ARCHITECTURE
ENGINEERING be graded to drain into the SCM.After the meeting with Mike Lawyer, this area
will be put together with the remaining onsite pervious area that was not
draining to the SCM. This will be used to make a low-density drainage area
consisting of the proposed turn lane and entrance. For this area, the percent
impervious came out to be 6.50% which is less than the 24% max. Supplement
EZ will show LD-1 as the impervious area for the proposed turn and entrance.
3.
a. NCDEQ Comment: The Entire Sit column ( Drainage Areas, Supplement)
references 3090 sf of off-site BUA, please clarify what this is referencing ( this
appears to be the portion of the road that drains to the parking lot). This off-site
BUA is not reflected on the application, and no off-site drainage area has been
accounted for on the application or the supplement.
b. BMG Response: The off-site BUA area accounting for this 3090 SF comes from
the proposed turn lane that could not be graded to drain into the SCM.Instead,
this area drains to the modified existing swale along US 301. This BUA area is
going to be combined with the proposed entrance and the remaining pervious
area within the LOD not draining to the SCM. This area will be part of a low-
density drainage area totaling 6.50% impervious area which is under the 24%
max. The Supplement EZ form will show LD-1.
If there is any additional information that we can provide to aid in your review,please do not
hesitate to contact me.
Sincerely,
BECKER MORGAN GROUP,INC.
c.T�nce
Trevor H.M. Smith,P.E.
Civil Engineer
202321800ap-ltr-Dunn-NCDEQ SWM response letter.docx