Loading...
HomeMy WebLinkAboutSW6240502_Supplement-EZ Form_20241105 SUPPLEMENT-EZ COVER PAGE t GRp45 L0.4GFu PROJECT INFORMATION 1 Project Name DOLLAR GENERAL-DUNN 2 Project Area ac — 2.26 3 Coastal Wetland Area(0) _ 0 4 Surface Water Area ac 0 5 is this project High or tow Density? High 6 Does this project use an off-she SCM? No COMPLIANCE WITH 02H.100 4 7 Width of vegetated setbacks Rrovided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003 4 c-d? NIA 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System i - - 12 Bioretention Cell 13 Wet Pond _ 1 14 Stormwater Wetland 15 Permeable Pavement -- 18 ISand Filter 17 Rainwater Hervesti ARWH� 18 Green Roof 19 level Spreader-Filter Strip LS-FS _ 20 Disconnected Im tvlous Surface DIS 21 Treatment Swale _ 22 Dry Pond --- 23 SlormFilter _ 24 Silva Cell 25TBa lter26terra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Michael Riemann,Principal 28 Organization: —— Becker Morgan Group 29 Street address: 3333 Jaeckle Drive,Suite 120 30 City,State,Zip: _ --- —- Wilmington,NC 28443 31 Plane num s: 9103417600 32 Email: MRiemann@BeckerMorgan.com Certification Statement: I certify,under penalty of law that this Suppiement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer •p O' z qSignatuie SEALsigner 049463 y A0,Q ' 4F �►�-M♦ 11 S- Z'� /' 00 1111111111 Seat Date DRAINAGE AREAS 1 Is this a h h densq project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this ect have low dens areas? s 4 If so,number of low densq drainage areas 1 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Endre She 1 LD 1 4 Type of SCM - Wet Pond Post DA 5 Total drainage area(sq ft 98446 52707 45739 6 Onsite drainage area(sq ft 98446 52707 45739 7 Offsite drainage area ft 0 0 8 Total BUA in project ft 43073 sf 38983 sf 4090 sf New BUA on subdivided lots(subject to permitting) 9 ft).. sf sf New BUA not on subdivided tots(subject to 10 permittin 43073 sf 38983 sf 4090 sf 11 Offsite BUA(sq ft sf sf 12 Breakdown of new BUA not on subdivided lots., -Parking(sq ft 24872 sf 24872 sf sf -Sidewalk ft 3471 sf 3471 sf sf -Roof(sq ft 10640 sf 10640 sf sf -Roadwa ft 4090 sf sf 4090 sf -Future(sq ft), sf sf -Other,please specify in the comment box below ft sf sf New infiltrating permeable pavement on '13 subdivided lots ft sf sf New infiltrating permeable pavement not on 14 subdivided lots s ftJ_ sf sf Existing BUA that will remain(not subject to 15permitting) s ft sf sf 16 Existing BUA that is already permitted(sq ft) sf sf 17 Existing BUA that will be removed(sq ft _ of sf 18 Percent BUA 44% 74% 9% 19 Desi n storm inches 1.0 in 20 Design volume of SCM(cu ft) 3128 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1.Drainage area number 1 2'Minimum r wired trealmeM volume�cu h) 3128 cf GENERAL MDC FROM WHAM _ 3 is the SCM sinad to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of t 3:1(2:1 below veg.he SCM(H:V)7 shel 6 Does the SCM have retaining watts,gabion walls or other engineered No side slopes? Are the inlets,outlets,and receiving stream protected from erosion 7(10year storm Yes Is there an overflow or bypass for inflow volume in excess of the -_design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump erred 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC 8? Yes 12 Does the drainage easement oomply with General MDC 9? Yee 13 If the SCM is on a single family lot,does(will?)the plat comply With NIA General MDC 10? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 1 Is tltere an O&M Plan that complies with General MDC 12? Yes 161 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 18 Suing method used v SA1DA 19 Has a stage/storage stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment removal) fmsl 170.50 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 171.00 22 Elevation of the bottom of the vegetated shelf fmsl 176.25 23 Elevation of the permanent pool(fmsi 176.25 24 1 Elevation of the top of the vegetated shelf fmsl) 177.25 25 Elevation of the pout fmsl 177.60 26 Surface area of the main permanent pool(square feet)_ 3941 27 Volume of the main permanent pool(cubic feet) _ 12622 of 28 Average depth of the main pool(feet) 3.20 ff 29•Average depth equation used Equation 2 30 If using equation 3,main er feet NIA 31 if using equation 3,width of sub shelf feet N/A 32 Volume of the foreba cubic feet) 2273 of 33 Is this 15-20%of the volume in the main pool? _ Yes 34 Clean-Gut depth for forebaylinches) 6 in 51 De n volume of SCMMMM(c fi) 8712 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 1.25 in. 38' If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pod(days) — 3.74 41 Are tte inlet(s)and outlet located in a manner that avoids short- Yes 42 Are berms or baffles provided to improve the flowpath? No 43 Depth of forebay at entrance(inches) 51 in 44 Depth of forebay at exit((inches) 27 in 45 Does water flow out of the foreba in a non-erosive manner? Yes 46 Width of the vegetated shell(test) 6 ft 47 Slope of vegetated shelf H:V 6:1 48 Does the orifice drawdown from below the top surface of the No _ rmament _? Does the pond minimize impacts to the receiving channel from the 1- 49 ,24-hr storm? Yes 50 Are fountains proposed?(If Y,please provide documentation that No MDC 9 is met. 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Red FescuslRyegrass 54 Has a p�anting plan been provided for the vegetated shelf? Yes ADDITIONAL_INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Permanent pool at 176.25'with tow flow onflce at 176.25'.1.0"storm event has a peak elevation of 176.51',A 6"x 6"orifice is set al elevation 177-60'and the top of strucWre as well as the emergency weir are set at 178,50'Top of pond is 179,00'. Wet Pond 3 4:37 PM 10/30/2024