HomeMy WebLinkAboutNCG081054_Cover Letter (Signed)_20241112 ROY COOPER ]
Governor
MARY PENNY KELLEY , a
Secretary
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
tmenm Director Environmental quality
November 12, 2024
Case Farms, LLC
Attn:Trent Reynolds
330 Westbrook Road
Goldsboro, NC 27530 ---- -- --
Subject: General Permit No.NCGO80000
Case Farms-Truck Shop
COC No.NCGO81054
Wayne County
Dear Mr.Reynolds:
In accordance with your application for a discharge permit received on July 5, 2024,we are
forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state-
NPDES general permit. This permit is issued pursuant to the requirements of North Carolina
General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US
Environmental Protection Agency dated October 15,2007 (or as subsequently amended).
In order to comply with the conditions of NCGO80000 to which you are now subject,you are
required to do the following:
➢ Develop and Implement a SWPPP within 12 months of permit issuance.
➢ Download and print a copy of the NCGO80000 Permit from the General Permits page on the
NPDES Industrial Stormwater Program web site,which can be reached by typing
"deq.nc.gov/SW-industrial" into your browser and hitting enter.
➢ When you receive an invoice for your annual permit fee each year,pay it promptly.
Electronic payment is convenient and quick,you can access the ePayment web site by
typing"deq.nc.gov/SW-ePayments" into your browser and hitting enter.
➢ If you have not already enrolled in electronic Data Monitoring Reports (eDMR),view the six
step process and complete the registration by typing"deq.nc.g-ov/SW-eDMR" into your
browser and hitting enter.
➢ Keep information about your facility name, ownership,legally responsible person,address,
and stormwater outfalls up to date. See the Industrial Stormwater Program web site for
instructions.
➢ Per the requirements of the Neuse Riparian (streamside) Buffer Rule (15A NCAC
02B.0714),all stormwater runoff into the riparian buffer shall meet dispersed flow
requirements of 15A NCAC 021-1 .1002 for portions of the project built after July 22,
1997. Also, drainage conveyances (drainage ditches,roadside ditches, and stormwater
conveyances) through riparian buffer must meet requirements of the Neuse Riparian buffer
rules,per 15A NCAC 02B .0714.
'. North Carolina Department of Environmental Quality I Division of Energy,Mmera!and Land Resources
512 North Salisbury Street 11612 Mail Service.Center I melgh.North Carolina 27699-1612
914 .
.707.4z�
Please take notice that this certificate of coverage is not transferable except upon approval from the
Division of Energy, Mineral, and Land Resources (Division). The Division may require modification
or revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required
by the Division of Water Resources,the Coastal Area Management Act,or any other federal or local
government permit that may be required.
If you have any questions concerning this permit,please contact Brittany Cook at(919) 707-3648
or by email at brittany.cookOdeq.nc.gov.
Sincerely,
Brittany Cook
NPDES Stormwater Permit Coordinator
Division of Energy, Mineral,and Land Resources
cc: Washington Regional Office/S.Dumpor
North Carolina Department ofErMronmental Quality I Division of Energy,Mineral and Land Resources
_ Jl 512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612
rvcn.rwT,vn. !ll���
919.707.4200