Loading...
HomeMy WebLinkAboutSW8930809_Historical File_19931025 Tyd ho- F + rt State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary Regional Manager October 22, 1993 Mr. Joe Dunnehoo, P.E. Prestige Engineering 101 Manatee Street Swansboro, North Carolina 28584 Subject: ADDITIONAL INFORMATION Stormwater Project No. 930809 Woodlands Subdivision Carteret County Dear Mr. Dunnehoo: Upon further review of your now complete stormwater submittal, your calculations of total impervious area for the roads appears to be deficient. I have calculated 55,324 square feet of road impervious area. I have determined from the Submittal Form that you have calculated 50,065 square feet of road. Since you did not provide a breakdown of your impervious area calculations, I cannot compare the two and fmd the difference. Therefore, I am returning the Submittal Form so that the built-upon area per lot allowance can be changed to 5,100 square feet per lot. Please make the change, initial and date, and return to me. If you can defend your calculation of 50,065 square feet of road, please include the breakdown of the calculations by road name. Enclosed is a copy of my calculation form and the original Submittal form. Sincerely, Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\930809.00T cc: (2) Linda Lewis Central Files 127 Cardinal Drive Extension, Wilmington,N.C.28405-3845•Telephone 919-395-3900• Fax 919-350-2004 An Equal Opportunity Affirmative Action Employer TOWN OF NEWPORT MAYOR POST OFFICE BOX 98 BOARD OF COMMISSIONERS DERRYL GARNER NEWPORT,NORTH CAROLINA 28570 J.ROGER NEWBY CLERK 919-223-4749 BEVERLY MCCARVILL FAX 919.223.5382 SEYMOUR RUBIN JACKIE WINBERRY ATTORNEY VINCENT J.LASHAN NELSON TAYLOR TIMOTHY O. MANN 14 October 1993 -' APPROVED NoRnicARou IRGNMEN7AL State of North Carolina OFENVM 4�� Department of Environment, QNISION QF ENVIRONMENTAL�� MANAGEt9MIENT Health & Natural Resources Division of Environmental Management StormwaterCedcationNo. 127 Cardinal Drive Extension Wilmington, North Carolina 82405-3845 A < RE: Stormwater Project # 93089, Woodlands S/D, Carteret County Gentlemen: The Parks Division of the town Street Department will, generally, perform inspections, removal of sediment accumulation, mowing, weed eating and ditch maintenance as necessary but not less than one time per month, after acceptance of the project by the town Board of Commissioners. Should there be any questions, please do not hesitate to call. Sincerely, Agl`• Or NEWPORT STORMNATER ER wit • Derryl G rner 11 Mayor OCT 191993 DG:m -oi # 13080°( OCT 1 g 1993 THE TOWN WITH OLD FASHIONED COURTESY STATE o i,r ` State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL.MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary Regional Manager October 12, 1993 Mr. Gary Mercer 2501 Front Street Beaufort, North Carolina 28516 Subject: ADDITIONAL INFORMATION Stormwater Project No. 930809 Woodlands Subdivision Carteret County Dear Mr. Mercer: The Wilmington Regional Office received a Stormwater Submittal for the Woodlands Subdivision on August 13, 1993 revised on October 4, 1993. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stonnwater review: 1. The amount of runoff allowed to leave the site untreated is unacceptable. All road runoff must be treated in grassed swales with 5:1 side slopes prior to leaving the site. 2. The Operation and Maintenance Plan provided by the Town of Newport must include the frequency and type of maintenance activities that will occur. Generally, inspections, removal of sediment accumulation, mowing, etc. must be specified. 3. Please provide a detail of the 5:1 side slope grassed swales and note their locations on the plans. 4. Please provide 3 copies of the overall site plan sheet that you had provided with the first submittal. They will be a part of the approved plan once everything is settled. 127 Cardinal Drive Extension,Wilmington, N.C.28405-3845•Telephone 919-395-3900• Fax 919-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Mercer October 12, 1993 Stormwater Project No. 930809 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to November 12, 1993, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (919) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STOP—MWAT\ADDINFO1930809.00T cc: Mr. Joe Dunnehoo, P.E., Prestige Engineering (2) Linda Lewis Central Files 2 TOWN OF NEWPORT MAYOR POST OFFICE BOX 98 BOARD OF COMMISSIONERS DERRYL GARNER NEWPORT,NORTH CAROLINA 28570 J.ROGER NEWBY CLERK 919-223-4749 BEVERLY MCCARVILL FAX 919-223-5382 SEYMOUR RUBIN JACKIE WINBERRY ATTORNEY VINCENT J. LASHAN NELSON TAYLOR TIMOTHY O.MANN 30 September 1993 Reference: Woodlands Subdivision, situated at New Bern Street and Carolina Avenue, Newport, North Carolina It shall be the responsibility of the developer, Gary A. Mercer, to inspect and maintain all water, sewer, and stormwater utilities and easements during construction of the subdivision. Once the roads have been inspected and verification has been that these roads meet or exceed North Carolina Department of Transportation's Standards, then these roads will be accepted in the Town of Newports Street System. When all utilities including water, sewer and stormwater have been installed and all necessary certifications have been signed and sealed by the Engineer stating that these items have been installed as per the plans and specifica- tions, then the Town of Newport will assume the responsibility of inspection and maintenance. The developer will warranty these improvements for a period of one year after acceptance. Town of rt, 1 Mcl�arvill To Clerk STATE OF NORTH CAROLINA CARTERET OF CARTERET I, a Notary Public of the County and State aforesaid, certify that Beverly McCarvill personally appeared before me this diay and acknowledged the execution of the foregoing instrument. Witness my hand and official seal, this thirtieth day of September 1993. (13,14.1-rreal Notaary My commission expires: 4 / I AF rnOVED jp\ IE C E n W i ibi NORTH CAROL' F NVIRONM:;NTAtw MANAGE! o MISSION DIVISION OF ENVIR NMENTAL MANAUEMEPIT OCT 0 4 1993 Date gs ,19 13 aerometer CertificationNo, 3 ; # c 3o SO9 "" .-... THE TOWN WITH OLD FASHIONED COURTESY S44F ) D STATE OF NORTH CAROLINA DEHNR OCT 0 4 1993 IMOMEMEI, 127 CARDINAL DRIVE EXTENSION WILMINGTON, NC 28405-3845 '11 �30$oa OCT 0 4 1993 30 September 1993 REFERENCE: Agreement to accept and maintain all roads, water, sewer and stormwater utilities and easements It shall be the responsibility of the developer, Gary A. Mercer, to inspect and maintain all water, sewer, and stormwater utilities and easements during construction. Once the roads have been inspected and verification has been made that these roads meet or exceed North Carolina Department of Transportation's Standards, then these roads will be accepted in the Town of Newport's Roadway System. When all utilities including, water, sewer and stormwater have been install and all necessary certifications have been signed and sealed by the Engineer stating that these items have been installed as per the plans and specifications, then the Town of Newport will assume the responsibility of inspection and maintenance. The developer will warranty these improvements for a period of one year after acceptance. 6:11 , 4W.40"--- d / GARY A, ERCER DATE STATE OF NORTH CAROLINA COUNTY OF CARTERTET I, a Notary Public of the County and State aforesaid, certify that Gary A. Mercer personally appeared before me this day and acknowledged the execution of the foregoing instrument. ,,LWitness my hand and official seal, this At day of A4.. , 1993. ��P B. PFNR`- .emu I�O�A,RY Notary Public y co�si xpires: �'� 7-9W .45r State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary Regional Manager September 27, 1993 Mr. Gary Mercer Mercer Building Company 2501 Front Street Beaufort, North Carolina 28516 Subject: ADDITIONAL INFORMATION Stormwater Project No. 930809 Woodlands Subdivision Carteret County Dear Mr. Mercer: The Wilmington Regional Office received a Stormwater Submittal for the Northwoods Subdivision on August 13, 1993, and a revision on September 24, 1993. A preliminary review of the revised information has determined that the submittal for the subject project is still not complete. The following information was previously requested on August 16, 1993 and is still required to continue the stormwater review: A. Notarized submittal authorization between the engineer and the person who will hold the Certification of Compliance. C�a�n, 2. A signed and notarized Operation and Maintenance Plan for the stormwater controls (ie., A '� grassed swales in this case.) The plan should cover regular inspections throughout the life of the project, and provisions for repair of eroded areas. 3. Signed and notarized deed restrictions utilizing the correct wording that limits the allowable built-upon area per lot, and stipulates that the affected homeowners may not fill in the swales used to meet the density req uirements of the Sate of North Carolina. 4. Mr. Dunnehoo was given the option of filling out the revised submittal form which includes a submittal authorization and deed restriction, however, this Office has not received it. All submittals from now on must be accompanied by the new form. 127 Cardinal Drive Extension,Wilmington, N.C.28405-3845•Telephone 919-395-3900• Fax 919-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Mercer September 27, 1993 Stormwater Project No. 930809 or 036) �� �Y¢ 5. A cross-section of the roads including width, curb and gutter detail, right-of-way width, 4{7 and applicable street names. 'k 1% 6. A cross-section of the cul-de-sac including right-of-way and pavement radii and road width. It was previously stated that New Bern Street and Nellie Street were allowing runoff to c)Q w Ala' leave the site without passing through a 100' vegetated swale. The new plans do not (IF _ QN provide complete profiles of the streets, so it is impossible to determine if this situation has been corrected. jp AO' & ` Please note that this request for additional information is in response to a revised plan review. The requested information should be received by this Office prior to October 27, 1993, or the submittal will be returned as incomplete. In your response letter, please address each item individually and what you have done to correct it. If you have any questions concerning this matter please feel free to call me at (919) 395-3900. Sincerely, Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\930809.SEP cc: (2) Linda Lewis Mr. Joe Dunnehoo, P.E., Prestige Engineering Mr. William Whaley, Carteret County Inspections Central Files Drtlitigt Engineering and Land Surveying,P.A. • 101 Manatee Street Cape Carteret Swansboro,NC 28584 (919)393-2129 FAX (919)3935 22 September 1993 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT � HEALTH AND NATURAL RESOURCESR. WILMINGTON REGIONAL OFFICE DIVISION OF LAND RESOURCES Bi SEA 1993 LAND QUALITY SECTION 127 CARDINAL DRIVE EXTENSION -».M.11 WILMINGTON, NC 28405-3845 REFERENCE: WOODLANDS, FORMERLY NORTHWOODS, FORMERLY SHE-NELLE MANOR Dear MS. LINDA LEWIS I am sending you a new set of Construction Sequences and Calculation sheets due to the number of changes that have been made. I am sorry for the delay but many things had to be adjusted and revised. Please destroy the old drawings and work from these new drawings, thank you. incHerely You , 1 b4 -vj \ JJOS F. DUNNEHOO PE/RLS STORMWATEtI SEP 2 4 1093 DIEarO Water - Sewer- Structural - Storm Wafer and Sedimentation.Erosion Control Planning-Inspections Environmental - & dArlslons - Wetlands - Monitoring Wells - Computer Drafting - Land Planning PRESTIGE ENGINEERING AND LAND SURVEYING 101 MANATEE STREET ,CAPE CARTERET SWANSBORO, NORTH CAROLINA 28584 PHONE 919-393-2129 • 19 JULY 1993 REVISED 20 SEPTEMBER 1993 WATER REFERENCE: GARY A. MERCER % PRESTIGE ENGINEERING1.1 M 101 MANATEE STREET U II CAPE CARTERET/SWANSBORO, NC 28584 �J PHONE 919-393-2129 SEP 24 1993 CONSTRUCTION SCHEDULE 17 # 1. Obtain plan approval and other permits where needed. 2. Hold preconstruction conference at least one week prior to any construction or filling. 3 . Place temporary gravel construction entrances and exits on the entrance to Carolina Avenue and on Deep Creek Road (NCSR-1166) . 4. Clear all road beds and bring them to grade if in cut sections. 5. Construct sedimentation basin at end of New Bern Street to intercept all water prior to it leaving project. 6. Clear lots 20, 21, 22, and 23 . Place all top soil on these lots, then place silt fence on the low side of soil to prevent all sediment from exiting area. 7 . Place all fill material from cut area onto road beds to be filled or stock pile fill material on lots 20, 21, 22 and 23 . Care should be taken to prevent fill from running into ditch on south side of property. 8. Put 18 inch culvert in at STATION 1+81 on New Bern Street. See calculation sheets to insure placement at proper grade. Place 15 inch pipes at end of CUL-DE-SACS. 9. Protect all existing grass swales shown on plans thus allowing for proper drainage. Cut new grades as shown on plans for drainage ditches. Seed all disturbed areas as soon as land is brought to grade (SEE VEGETATION PLAN) . 10. Remove all existing pipes that do not fall into the designed drainage system and extend and repair those existing pipes that will be used, if needed. Then reseed as needed. 11. Install catch basins at designated points. 12 . Place rip-rap or other outlet protection devices at end of pipes number 3 and 4 as shown on plans. 13. Place excavated drop inlet- protection around each drop inlet or catch basin. 14 . All erosion and sedimentation control practices will be inspected weekly or after each rainfall which ever is less. Any needed repairs will be done immediately. 15. Estimated time of construction and completion of above will be approximately 120 to 180 days. MAINTENANCE PLAN 1. All erosion and sediment control practices will be checked for stability and operation following every runoff producing rainfall, but in no case less than once every week. Any needed repair will be done immediately to insure that all structures are functioning as designed. 2 . The sedimentation that settles around basin will be clean out when the sediment is 0. 25 feet deep. Gravel will be cleaned and replaced when needed or when sediment pool does not drain as designed. 3 . Sediment will be removed from behind the silt fence when it is from 0. 25 to 0.5 feet high or when needed. Repairs will be done to fence as needed to prevent sediment from leaving area. 4 . All seeded areas will be fertilized, reseeded as necessary, and mulched according to the Vegetation Plan. Grass must be maintained in a vigorous dense vegetative cover and mowed as needed. 2 SEEDING SCHEDULE SEED BED PREPARATION Lime 2 Tons/ac. 10-10-20 1, 000 lbs. /ac. 0-20-0 500 lbs. /ac. Straw Mulch 2 tons/ac. (after seeding) Asphalt Tack 200 gal. /ton of mulch SEEDING MIXTURE (February 1 - April 30) Tall Fescue 50 lbs./ac. Pensacola Bahiagrass 10 lbs. /ac. Korean or Kobe Lespedeza (scarified) 50 lbs. /ac. (May 1 - August 31) Tall Fescue 50 lbs./ac. Weeping Lovegrass 5 lbs. /ac. Korean or Kobe Lespedeza (scarified) 50 lbs. /ac. Browntop Millet 25 lbs. /ac. (September 1 - January 31) Tall Fescue 60 lbs. /ac. Korean or Kobe Lespedeza (unscarified) 60 lbs. /ac. Rye (grain) 25 lbs./ac. For Slopes 2 : 1 or steeper add 30 lbs. /ac. Sericea Lespedeza and 15 lbs. Weeping Lovegrass LANDSCAPING MIXTURE (January 1 - March 31) Common Bermuda grass (unhulled) 20 lbs. /ac. (April 1 - July 31) Common Bermuda grass (hulled) 12 lbs. /ac. Hybrid Bermuda grass sprigs may be used. 3 NARRATIVE PROJECT DESCRIPTION The purpose of this project is to construct 32 lots on approximately 17.2 acres of land. '• Included in the project will be the construction of about 2100 feet of road. Approximately 5.9 acres will be graded or cleared (2100 long X 60 wide) plus about three (3) acre on high lots and along drainage ways. The total disturbed area will be less than six (6) acres. This site is located between Caroline Avenue and NCSR 1166 in Carteret County on NCSR 1166 (See vicinity map) .- .. SITE DESCRIPTION The overall slope on this project is approximately 1%, although some parts are flat while other parts have a slope of 3%. There are drainage ditches along the western and northern edges of the property. There is no OFF-SITE drainage. The site is mostly open with pines vegetation on some lots and along the drainage areas. All trees will remain except those in drainage area, and the high spots on lots 20, 21,22,26 and 27 that interrupt drainage, and those small pines in the proposed road's Right-of-Way. At the present time there are existing ditches along the proposed road bed, these ditches will be filled after roadbeds are brought to grade. This project is laid out trying to match existing road beds that have been previously graded. ADJACENT PROPERTY. Areas to the North is undeveloped with small patches of open fields. The drainage area is intermittent and well stabilized with trees, grass, and shrubs. SOIL The soil in this project is mapped as Lynchburg soil. Lynchburg soils consists of poorly drained soils with erosion hazard being slight. The soil is fine sandy loam. All soil stripped from high lots will be placed on road beds except the topsoil which will be replaced on stripped lots and ditches. After road is completed this top soil will be spread along ditches and the edge of the Right-of-Ways to aid in establishing vegetation. Almost no water will be concentrated into any one spot, therefore no runoff problem is anticipated. PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES LAND GRADING The only grading that will have to be done is clearing small 4 growth in proposed Right-of-Way and cutting into the high lots. All drainage easements will also be cleared and regraded as needed. C9NSTRUCTION ROAD STABILIZATION As soon as final grade is established at the entrance to the A; project on New Bern Street, the road will be cross sloped so as to 1kdrain in an East-West direction into the existing ditches. This will be accomplished by placing 6" of NC DOT standard size ABC stone. At the entrance on NCSR 1166 the process will be to intercept downhill drainage from the culvert that crosses the proposed road, Nellie Street, to NCSR 1166. This construction entrance will be cross drained into the existing ditches along NCSR 1166 SILT FENCE As soon as lots are cleared and before top soil is brought in the silt fence will be set in place. The projected area where all top soil and other fill material will be wrapped with silt fencing. DUST CONTROL No dust problems are expected due to the small amount of grading and the short period of time this area will be exposed to the elements. FABRIC DROP INLET PROTECTION Place fabric barrier around structures as soon as they are constructed. These will be located on Nellie Street over existing pipe, at the end of Roy Court and Thomas Court. DRAINAGE CALCULATIONS The rational method will be used in all calculations determining runoff. The coefficient of runoff that will be used for developed property will be 0. 40. The charts from which intensity is determined will be Greenville, NC. CALCULATIONS FOR EACH DRAINAGE AREA DRAINAGE AREA "A" AREA IN ACRES = 0.34 ACRES INTENSITY = 7. 0 INCHES PER HOUR = 0.8 Q FOR AREA = 1.9 CFS DRAINAGE AREA "B" AREA IN ACRES = 0.34 ACRES 5 INTENSITY = 7.0 INCHES PER HOUR c = 0.8 Q FOR AREA = 1.9 CFS DRAINAGE AREA "C" • AREA IN ACRES = 0.41 ACRES INTENSITY = 7.0 INCHES PER HOUR Q FOR AREA = 1. 1 CFS DRAINAGE AREA "D" AREA IN ACRES = 0.24 ACRES INTENSITY = 7. 0 INCHES PER HOUR Q FOR AREA = 0.7 CFS DRAINAGE AREA "E" AREA IN ACRES = 1.21 ACRES INTENSITY = 7 . 0 INCHES PER HOUR Q FOR AREA = 3 .4 CFS DRAINAGE AREA "F" AREA IN ACRES = 3 .75 ACRES INTENSITY = 7. 0 INCHES PER HOUR Q FOR AREA = 10.5 CFS DRAINAGE AREA "G" AREA IN ACRES = 0. 55 ACRES INTENSITY = 7 . 0 INCHES PER HOUR Q FOR AREA = 1.5 CFS DRAINAGE DITCHES AND CULVERT CALCULATIONS ALL DITCHES WILL BE CROSS SLOPED AT 5: 1 (H:V) 6 Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: WOODLANDS SUBDIV Comment: PIPE 1 RUNOFF FROM AREA "A" AT CB "A" Solve For Actual Depth Given Input Data: Diameter 1.25 ft Slope 0.0030 ft/ft Manning's n. 0. 013 Discharge 1. 95 cfs Computed Results: Depth 0. 66 ft Velocity 2 .95 fps Flow Area 0. 66 sf Critical Depth 0.56 ft Critical Slope 0. 0055 ft/ft Percent Full 52 .99 % Full Capacity 3. 54 cfs QMAX @.94D 3.81 cfs Froude Number 0.72 (flow is Subcritical) Open Channel Flow Module, Version 3 . 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Mame: WOODLANDS SUBDIV Comment: PIPE 2 RUNOFF FROM AREA "B" AT CB "B" Solve For Actual Depth Given Input Data: Diameter 1.25 ft Slope 0. 0030 ft/ft Manning's n 0.013 Discharge 1.95 cfs Computed Results: Depth 0. 66 ft Velocity 2.95 fps Flow Area 0. 66 sf Critical Depth 0.56 ft Critical Slope 0. 0055 ft/ft Percent Full 52. 99 % Full Capacity 3 .54 cfs QMAX @.94D 3.81 cfs Froude Number 0.72 (flow is Subcritical) Open Channel Flow Module, Version 3. 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: WOODLANDS SUBDIV Comment: PIPE 3 RUNOFF FROM AREAS "C" AND "E" Solve For Actual Depth Given Input Data: Diameter 1.50 ft Slope 0. 0030 ft/ft Manning's n 0.013 Discharge 4 .50 cfs Computed Results: Depth 1.00 ft Velocity 3 .60 fps Flow Area. . . . 1.25 sf Critical Depth 0.81 ft Critical Slope 0.0056 ft/ft Percent Full 66.56 % Full Capacity 5.75 cfs QMAX @.94D 6. 19 cfs Froude Number. . . , 0. 68 (flow is Subcritical) Open Channel Flow Module, Version 3 . 12 (c) 1990 Haestad Methods, Inca * 37 Brookside Rd * Waterbury, Ct 06708 Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: WOODLANDS SUBDIV. Comment: PIPE 4 RUNOFF FROM AREAS "F" AND "G" Solve For Actual Depth Given Input Data: Diameter 1.50 ft Slope 0.0100 ft/ft Manning's n 0.013 Discharge 10. 50 cfs Computed Results: Depth 1.23 ft Velocity 6.78 fps Flow Area 1.55 sf Critical Depth 1.25 ft Critical Slope 0. 0098 ft/ft Percent Full 81.93 % Full Capacity 10.50 cfs QMAX @.94D 11. 30 cfs Froude Number 1. 03 (flow is Supercritical) ' Open Channel Flow Module, Version 3 . 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Triangular Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: WOODLANDS SUBDIV. Comment: DRAINAGE DITCH AT END OF PIPE FROM CB "A" Solve For Depth Given Input Data: Left Side Slope 5.00:1 (H:V) Right Side Slope 5.00:1 (H:V) Manning's n 0.030 Channel Slope 0.0050 ft/ft Discharge 1.95 cfs Computed Results: Depth 0.52 ft Velocity 1.42 fps Flow Area 1.38 sf Flow Top Width 5.25 ft Wetted Perimeter 5.35 ft Critical Depth 0.39 ft Critical Slope 0.0232 ft/ft Froude Number 0.49 (flow is Subcritical) Open Channel Flow Module, Version 3 . 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Triangular Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: WOODLANDS SUBDIV. Comment: DRAINAGE DITCH AT END .OE' PIPE FROM CB "B" Solve For Depth Given Input Data: Left Side Slope 5. 00:1 (H:V) Right Side Slope 5.00: 1 (H:V) Manning's n 0.030 Channel Slope 0. 0050 ft/ft Discharge 1.95 cfs Computed Results: Depth 0.52 ft Velocity 1. 42 fps Flow Area 1.38 sf Flow Top Width 5.25 ft Wetted Perimeter 5.35 ft Critical Depth 0.39 ft Critical Slope 0.0232 ft/ft Froude Number 0.49 (flow is Subcritical) Open Channel Flow Module, Version 3 . 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Triangular Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: WOODLANDS SUBDIV. Comment: DRAINAGE DITCH SOUTH OF'AREA "E" Solve For Depth Given Input Data: Left Side Slope 5.00: 1 (H:V) Right Side Slope .5. 00:1 (H:V) Manning's n 0.030 Channel Slope 0. 0050 ft/ft Discharge 3 .40 cfs Computed Results: Depth 0. 65 ft Velocity 1. 63 fps Flow Area 2.09 sf Flow Top Width 6.46 ft Wetted Perimeter 6.59 ft Critical Depth 0.49 ft Critical Slope 0.0215 ft/ft Froude Number 0.50 (flow is Subcritical) Open Channel Flow Module, Version 3 .12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Triangular Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: WOODLANDS SUBDIV. Comment: DRAINAGE DITCH AT END OP PIPE 3 Solve For Depth Given Input Data: Left Side Slope 5.00: 1 (H:V) Right Side Slope - • 5. 00:1 (H:V) Manning's n 0.030 Channel Slope 0.0050 ft/ft Discharge 5.20 cfs Computed Results: Depth 0.76 ft Velocity 1.81 fps Flow Area 2 .87 sf Flow Top Width 7.58 ft Wetted Perimeter 7.73 ft Critical Depth 0.58 ft Critical Slope 0.0203 ft/ft Froude Number 0.52 (flow is Subcritical) Open Channel Flow Module, Version 3 . 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Triangular Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: WOODLANDS SUBDIV Comment: DRAINAGE DITCH IN MIDDLE OF AREA "F" Solve For Depth Given Input Data: Left Side Slope 5.00:1 (H:V) Right Side Slope .. 5.00: 1 (H:V) Manning's n 0.030 Channel Slope 0.0050 ft/ft Discharge 10. 50 cfs Computed Results: Depth 0.99 ft Velocity. . 2. 16 fps Flow Area 4.87 sf Flow Top Width 9.86 ft Wetted Perimeter 10.06 ft Critical Depth 0.77 ft Critical Slope 0.0185 ft/ft Froude Number 0.54 (flow is Subcritical) Open Channel Flow Module, Version 3. 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Triangular Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: WOODLANDS SUBDIV Comment: DRAINAGE DITCH AT END OF PIPE 4 Solve For Depth Given Input Data: Left Side Slope 5.00: 1 (H:V) Right Side Slope 5.00:1 (H:V) Manning's n 0. 030 Channel Slope 0. 0030 ft/ft Discharge 12. 00 cfs Computed Results: Depth 1. 14 ft Velocity 1.84 fps Flow Area 6. 51 sf Flow Top Width 11. 41 ft Wetted Perimeter 11. 64 ft Critical Depth 0.81 ft Critical Slope 0. 0182 ft/ft Froude Number 0.43 (flow is Subcritical) Open Channel Flow Module, Version 3. 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 • TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT Sheet 1 of 2 MIN. 50' 41)14-011V.IFireri7170,'drall Tin?WIT Q �i, a�rja ger •44114, ;.rj 00/i,1• •1+ ' • : 6..a •o"tii 'Yaip 11. •ei di•Iy MIN. 12 G[ ►�1��it4.3v,=a_�i}ail��y1�11 l • �..�Y•.4.�.i rIP`, °' 2-3"COARSE AGGREGATE MIN. %.:3 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT Sheet 2 of 2 DEFINITION: A groveled area or pad located at points where vehicles enter and leave a construction sites. DESIGN CRITERIA;Aggregate Size-Use 2-3 inch washed stone. Dimensions of gravel pad- thickness:6 inches minimum Vidth: 12 ft. mininum or Full w dth at all points of the vehicular entrance and exit area, whichever is greater length: 50 Ft. moo location- Locate construction entrances and exits to limit sediment from leaving the site and to provide For maximum unity by oil construction vehicles. Avoid steep grades and entrances at curves in public roads. Noshing- IF conditions at the site ore such that most of the mud and sediment ore not removed by vehicles traveling over the gravel, the tires should be washed Vashig should be done on on area stabilized with crushed stone that drains into a sediment trap or other suitable disposal area. A wash rack may also be used to make woshig more convenient and effective. MAINTENANCE:Maintain the gravel pad in a condition to prevent mud or sediment From leaving the construction site. This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials stilled, washed or tracked onto public roadways. CONSTRUCTIIJI SPECIFICATIONS: I. Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properly grade it, 2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. a Provide drainage to carry water to a sediment trap or other suitable outlet, 4, Use geotextile Fabrics because they improve stability of the foundation in locations subject to seepage or high water table. ln In d' ad 1 /I >,4 d C ;- pi O tw O1 d, 0 L N4Q. E% 0 c W%0 i+ > 1 O L OI d -IN L ++ CU a 1=1I z Cu° +' I I I I IF-' Ix P _ d ;Il i lll a o, L =1iTA > 0 x 0 4- _ 73 In y • / N a : ;;�•�iOkli ••40,k i i I - I 1 •1••: Z co • • . LLI - •••101041• N 4- Q 0) • •• ••• C + ••••••••••• ( ) £ � °' :W1 nN n- •••••P w it••••••�f I-- it•et' 0 j��•• � IOC -P d CI--L. I III c0) I Ilia 4- X ___ d -- CVW0 11=1 �' � � A V1 -P I—ll l TEMPORARY SEDIMENT TRAP Sheet 2 of 3 Definition: A small, temporary ponding basin formed by an enbanknent or excavation to capture sediment. Design Criteria: Ensure drainage area for a sedinentotion.trap does not exceed 5 acres. Storage capacity- Keep the minimum volume of the sediment trap at 1600 cubic ft/acre based on disturbed area draining into the basin, Measure volume below the crest elevation of the outlet. The volume of a natural sediment trap may be satisfactory approximated by the equation. volume (cubic ft) = 0.4 x surface area (square Ft) x maximum pool depth (Ft) Trap cleanout- Remove sediment From the trap and restore the capacity to original trap dimensions when sediment has accumulated to one-half the design depth. Trap efficiency- Keep the surface area peek flow as large as possible. Research by Barfield and Clor (1985) indicates that use of the following equation will give trap efficiency of 15% For most Coastal Plain and Piedmont soils: surface area at design Flow (acres) (0.01) peak inflow rate (cis) Embankment- Ensure that embankments for temporary sediment traps do not exceed 5 Ft in height measured at the center line from the original ground surface to the top of the embankment, Additional Freeboard nay be added to the embankment height to allow flow through a designated bypass location. Construct embankments with a minimum top width of 5 Ft and side slopes of 2:1 or flatter. Machine compact embankments. Excavation- Where sediment pools are formed or enlarged by excavation, keep side slopes at 2:1 or Flatter for safety. Outlet section- Construct the sediment trap outlet using a stone section of embankment located at the low point in the basin. The stone section serves two purposes: (1) the top section serves os o • nonerosive spillway outlet for Flood Flows, and (2) the bottom section provides a means of dewatering the basin between runoff events. Stone size- Construct the outlet using well-graded stones with a d50 size of 9 inches (class B erosion control stone is recommended) and a naxinum stone size of 14 inches. Al-Ft thick layer of 1/2-3/4 inch aggregate (N.C. DOT 151 washed stone is recommended) should be placed on the inside Face to reduce drainage flow rate, Side slopes- Keep the side slopes of the spillway section at 2:1 or Flatter. To protect the embankment, keep the sides of the spillway at least 21 inches thick. Depth- Keep the crest of the spillway outlet a minimum of 1:5 Ft below the settled top of the embankment, Protection From piping- Place filter cloth on the Foundation below the riprap to prevent piping. An alternative would be to excavate a keyway trench across the riprop Foundation and up the sides to the height of the dam, TEMPORARY SEDIMENT TRAP • Sheet 3 of' 3 Construction Specifications 1: Clear, grub, and strip the area Under the embankment of all vegetation and root not. Remove all surface soil containing high amounts of organic ratter and stockpile or dispose of it properly Haul all objectionable material to the designated disposal area, 2: Ensure that fill material for the embankment is Free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3: Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using Filter Fabric or a keyway cutoff trench between the riprap structure and the soil. Place the filter Fabric between the riprap and soil, Extend the Fabric across the spillway foundation and sides to the top of the dam; or : excavate a keyway trench along the centerline of the spillway foundation extending up the sides to the height of the dam, The trench should be at least 2 ft deep and 2 ft wide with 1:1 side slopes, 4: Clear the pond area below the elevation of the crest of the spillway to Facilitate sediment cleonout. 5: All cut and fill slopes should be 2:1 or Flatter. 6: Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 Ft and maximum side slopes of III that extend to the bottom of the spillway section, 1: Construct the minimum Finished stone spillway bottom width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment. Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. 8:Material used in the stone section should be a well-graded mixture of stone with a d50 size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather-resistant. 9: Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable For the receiving stream. Keep the edges of the stone outlet section Flush with the surrounding ground and shape the center to confine the outflow stream. 10: Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. 11: Stabilize the embankment and all disturbed areas above the sediment pool and downstream From the trap immediately after construction. 12: Show the distance From the top of the spillway to the sediment cleanout level (one-half the design depth) on the plans and mark it in the field, Sheet 1 of 2 SEDIMENT FENCE (SILT FENCE> Definition Atemporary sediment barrier consisting of' filter fabric buried at the .bottom,stretched,and supported by posts.. Design Criteria - Ensure that the drainage area is no greater than 1/4 acre per 100 ft of fence.Make the fence stable for the 10 yr peak storm runoff.Where all runoff is to be stored behind the fence, ensure that the maximum slope length behind a sediment fence does not exceed the specifi- cations are shown on sheet 2 of 2. Construction Specifications - MATERIALS) 1. Use a synthetic filter fabric or a pervious sheet of potypropytene,nyton, polester,or polyethylene yarn,which is certified by the manufacturer, 2.Ensure that the posts for sediment fences are either 4-inch diameter pine.,2-inch diameter oak,or. 1.33 lb/linear ft steel with a minimumlength 3.For reinforcement of' standard strength filter fabric,use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. Construction -1,Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2.Enure that the height of the sediment fence does not ex- ceed 18 inches above the ground surface. 3.Construct the filter fabric from a continuous roll cut to length of the barrier to avoid joints.When joints are necessary,securly fas- tenthe filter cloth only at a support post with overlap to the next post. 4.Support standard strength filter fabric by wire mesh fasten- ed securely to the upslope side of the posts using heavy duty wire staples at least 1 inch long,or tie wires.Extend the wire mesh support to the bottom of the trench. 5.When a wire mesh support fence is used,space posts a maximum of 8 ft apart.Support posts should be driven securely into the ground to a minimum of 18 inches. 6.Extra strength filter fabric with 6-ft post spacing does not require wire mesh support fence.Staple or wire the filter fabric directly to posts. 7.Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed tine of posts and upslope from the barrier. 8.Backfill the trench with compacted soil or gravel placed over the filter fabric. 9.Do not attach filter fabric to existing trees. Maintence- Inspect sediment fences at least once a week and after each rainf( Make any required repairs immediatety.Should the fabric of a sediment fence collapse,tear,decompose or become ineffective,replace it promptly.Replace burlap every 60 days.Remove sediment deposits as necessary to provide adequate stot volume for the next rain and reduce pressure on the fence.Remove all fencing materials and unstable sediment deposits and bring to grade and stabilize it af- the contributing drainage area has been properly stabilized. Sheet 2 of' 2 maximum slope length and slope for for sediment fence SLOPE SLOPE LENGTH <2% 100 2 to 5% 75 5 to 10% 50 10 to 20% 25 >20% 15 Spesifications for sediment fence fabric Physical Property Requirements Filtering efficiency 857.-min tensile strength- at standard strength 20% max elongation 301b/lin In extra strength 50tb/lin In slurry flow rate 0,3 gal/sq ft/min Installation detail of' sediment fence Ih744.e1"4IOI�yOIO�`�i'Icompacted /444j�OI��4 fill C ll= • i ���,����%/�;; ll —1 [1—II—'11=11—IIIII II j III I—Mg—I ,II 11 11 I 11 —ll[1 II—TfI_' �hlll 1II II T—I I—II II-11 T1=11I111=11 yJ-11—I 11=11—II ll—H 1111-I1 lI—II-11 filter fabric • Backfill min 8' thick layer of gravel 14' T irizemaimenn r •:ib u u u 1`"11 a T—T—II I 171-I--vII-� ' II -iTI—TI-IIi " " "' l 11 1-11 11-m-�Il. �11 11-LI-11 II=ll! mi V-trench 1 ll 1 .. -1 �-11—�, r•J Extension of fabric and wire Into the trench filter fabric s . I�IIIIIIIIIIH III ./4 :: H iil III III i 1 lIII III I I I III l l ll l l III III III III III III III :::;: :::::ti: WIRE II III Ljl II IIIII III _ ��Ae", —T.— =ul- ml SHEET 1 OF 4 DESIGN FOR OUTLET STABILIZATION STRUCTURES DEFINITION A. structure designed to control erosion at the outlet of a channel or conduit, PURPOSE, To prevent erosion at the,outlet of a channel or conduit by reducing the velocity of flow and dissipating the energy. DESIGN CRITERIA' The criteria for design o f riprap outlets are' Capacity--10 year,peak runoff or the design discharge of..the water conveyance structure, whichever is greater. Ta/Iwa ter depth--Determine the depth of tailwa ter immediately below the pipe outlet based on the design discharge plus other contributing flows. If the tailwa ter depth is less than half the diameter of the outlet pipe and the receiving stream is sufficiently wide to accept the divergence of flow, it is classed as a minimum ta/wa ter condition. If the to/Iwa ter depth /s grea ter than half the pipe diameter, It is classed as a maximum tailwa ter condition. Pipes that outlet onto broad flat areas with no defined channel may be assumed to have a .minimum ta/lwa ter condition unless site condition indicate otherwise, Apron size--The apron length and width can be determined according to the tailwa ter condition, IF the water conveyance structure discharges directly into a well-defined channel, extend the apron across the channel bottom and up the channel banks to an elevation of 0,5 Ft above • the maximum ta/lwa ter depth or to the top of the bank, whichever is less. Determine the maximum allowable velocity For the receiving stream, and design the riprap apron to to reduce Flow to this velocity before flow leaves the apron. Calculate the apron length required to meet stable conditions downstream, whichever /s greater. Grade--Ensure that the apron has zero grade. There should be no over fall at the end of the apron/ that is, the elevation of the top of the riprap at the downstream end should be the same as the eleva tion of the bottom of the receiving channel or the adjacent ground if there is no channel, Alignment--The apron should be s traigh t throughout its entire length, but if a curve is necessary to align the apron with the receiving stream, locate the curve in the upstream section of riprap. SHEET 2 OF 4 • Ma terials--Ensure that riprap consists of a well graded mixture of stone. Larger stone should be predominate, with sufficient smaller sizes to fill the voids between the stones. The diameter of the largest stone .size should be no grea ter than 1.5 times the d50 size. Thickness—Make the minimum thickness of riprap 1.5 times the maximum stone diameter. Stone quality--Selec.t stone for riprap from field stone or quarry stone, The stone should be hard angular, and highly wea ther-resistant. The specific gravity of the Individual stones should be at least 2.5, Filter--Install a filter to prevent soil movement through the openings in the riprap. The filter should consist of a graded gravel layer or a syn the tic filter cloth, Design filter blankets by the method described in Practice 6.15,Riprap. CONSTRUCTION SPECIFICATIONS, 1. Ensure that the subgrade For the filter and riprap Follows the required lines and grades shown in the plan. Compact any fill required in the subgrade to the density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soil may also be filled by Increasing the riprap thickness. e The riprap and gravel filter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected from punching or tearing during installation. Repair any damage by removing the riprap and placing another piece of filter cloth over the damaged area. All connecting jo►nts should overlap a minimum of 1 Ft. IF the damage is extensive, replace the entire Filter cloth. 4. Riprap may be placed by equipment, but take care .to avoid damaging the filter. 5. The minimum thickness of the riprap should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone. It should be hard, angular, highly weather-resistant and well graded 7. Construct the apron on zero grade with no overfall at the end Make the top of the riprap at the downstream end level with the receiving area or slightly below it. SHEET 3 OF 4 8. Ensure that the apron Is properly aligned with the receiving stream and preferably straight throughout its length, If a curve is needed to fit site conditions, place It in the upper section of the apron, 9. Immediately after construction, s to bilize all disturbed areas with vegeta tion. 'AINTENANCE' Inspect riprap outlet structures a f ter heavy rains to see if any erosion around or below the riprap has taken place or If stones have been dislodged Immediately make all needed repairs to prevent further damage. SHEET 4 OF 4 / L ��•���••••••••••• •-��•�•0••••••••••••••••••• I► • • • • • • • • • • • • • 010.000A6.00.00000 • • • • w • • • • • • • • • \(, • • • • • • • • • • • • • • • • • • • • • • • •••••••• • ---- / 1:1:: I • • • • • • • • • • • • • • • • a 10••••••••••••••_•••••••••••• -4111.014.201. PLAN b .,iL ii ii: ii• • • • • • • • • • • • • • =11I #1= —•••••••••••••••••••••••••••• = 11= HI I*1#1 1 11# —••:0000•0:0•0:0•000•00•••0 1 I' 11 II.1;=I: 7 rrr SECTION FILTER FABRIC NOTES 1. L /s the length of the riprap 5. For riprap protection use class apron. A or class B erosion control 2. d=1.5 times the maximum stone stone, diameter but not less than 6` 6. Apron to be placed level with 3. In a well-defined channel extend the top surface of riprap a t the apron up the channel banks same level as surrounding land to an eleva tion of 6' above the surface-- no overran should maximum toil wo ter depth or to exist, the top of the bank, whichever is less. 4. A fitter blanket or filter fabric should be installed between the riprap and soil Foundation. Excavated Drop Inlet DEFINITION- An excavated area in the approach to a drain drop inlet or curb inlet PURPOSE- To trap sediment at the approach to a storm drainage system, this practice allows use of permanent stormwater conveyance at an early stage in site development. DESIGN CRITERIA- Limit the drainage area .to less than one acre. Keep the minimum depth at 1 ft, and the maximum depth of two ft, as measured from the crest of the inlet structure. Maintain side slopes around the excavation no steeper than 211. Keep the minimum volume of the excavated area around the drop inlet at approximately 35 cu.yds./acre disturbed Shape the basin to fit site conditions, with the longest dimensions oriented toward the longest inflow area to provide maximum trap efficiency, Install provisions for draining the temporary pool to improve trapping efficiency for small storms and to avoid problems from standing water after heavy rains. MAINTENANCE- Inspect, clean, and property maintain the excavated of ter every storm until the contributing drainage area has been permanently stabilized, To provide satisfactory basin efficiency, remove sediment when the volume of the basin has been reduced by one-half. Spread all excavated material evenly over the surrounding land area or stockpile and stabilize it appropriately, CONSTRUCTION SPECIFICATIONS- 1, Clear the area of' all debris that might • hinder excavation and disposal of spoil. 2. Grade the approach to the inlet uniformly, 3, Protect weep holes by gravel, 4 When the contr►buting drainage area has been permanently stabilized,seal weep holes,fill the basin with stable soil to final grading elevation, compact it properly, and stabilize. 3 0 > - c , -'4 d U75 0) - O +' +' o, 75 O +' a) Cu aO -75 -P at c O d D d E I 3 U —Id O) c - .. a > Z c E I ELd3 III cdLIz 0S75 VI II=11 ,III _ 1=1 =I I = \ IcpA1 III-I \ , / .....„ I=111,=, ={ Li., 1 =III- �I11= N i_. :.I III=1 I 1=1 I I w ;40.4III-1I1= -11I- IY III=1 I 1-11 ••••••••••••••• .-.•.0. .- - 1" . I I=1 Ali "'I O i • • •••, ••••• W _ a d `_I I I / , I r r :;.;0111=III=III-s-(7 19tn III-�, tU11A =1 W = -4lI7 (4- d0 W £ Q ~ I O -JI U O I � W N =w -Q 'NA VI stAir State of North Carolina Department of Environment, Health, and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary Regional Manager August 16, 1993 Mr. Joseph Dunnehoo, P.E. Prestige Engineering 101 Manatee Street Swansboro, North Carolina 28584 Subject: ADDITIONAL INFORMATION Stormwater Project No. 930809 Northwoods Subdivision Carteret County Dear Mr. Dunnehoo: The Wilmington Regional Office received a Stormwater Submittal for the Northwoods Subdivision on August 13, 1993. A preliminary review of that information has determined that the submittal for the subject project is not complete. The following information is needed to continue the stormwater review: SUBMITTAL PACKAGE q.j,¢ /1. North Carolina registered Professional Engineers seal sh'II need 2. Notarized submittal authorization. The authorization you provided is between Mr. Mercer and Nellie Gamer. It must be between you and the person applying for the Stormwater Certification. Sh'I l need 3. Signed and notarized Operation and Maintenance Plan for the upkeep of the grassed swales, including inspection interval, repair of eroded areas and mowing. SJ l need 4. Signed and notarized deed restrictions utilizing the correct and acceptable wording as noted on the revised submittal form enclosed. 5. You may elect to fill out the enclosed revised submittal form and forego the necessity of providing separate authorization and deed restrictions. In the future, all submittals not using the new form will be returned. 127 Cardinal Drive Extension,Wilmington, N.C.28405-3845 •Telephone 919-395-3900• Fax 919-350-2004 An Equal Opportunity Affirmative Action Employer Mr. Dunnehoo August 16, 1993 Stormwater Project No. 930809 PLANS 5};I Ihoed 1. Cross-section of the road with curb and gutter detail, road width, right-of-way width, and applicable street names. Sh'I I need 2. Cross-section of the cul-de-sac, including road and right-of-way radii, and approach road width. 3. Because this density project is utilizing curb and gutter, the road runoff must be treated in 100' long grassed swales with 5:1 side slopes, < 5% longitudinal slope, and non-erosive • a Z4 velocity for the type of grass specified. The swales are required prior to the runoff entering waters of the State, including the perimeter ditches. Therefore, pipes 1 and 2 must provide the 100' swales prior to entering the ditch. 4. The profiles of New Bern Street and Nellie Street indicate that runoff is allowed to leave nok `^� 5 ,19)" the site without benefit of passing through a 100' vegetated swale. This is not acceptable. if, `� All road runoff must be directed to a 100' grassed swale prior to entering another water Of' AO tlit body. d et 5. The Sedimentation and Erosion Control Plan shows pipe #3 just long enough to reach de— under the right-of-way, however, the plan and profile sheets show the pipe extending for or 90' between Lot 19 in Northwoods and Lot 6 in She-Nelle Manor. Which is correct? CALCULATIONS 1. In addition to the drainage areas and flowrates you have calculated, please provide velocity rod` calculations based on the allowable velocity for the particular grass specified to show that f c .2 the anticipated velocity is non-erosive. Please find enclosed copies of the submittal requirements, Stormwater Rules with Directives, and a revised submittal form. Please familiarize yourself with these requirements so that consistency within the density submittals can be achieved and maintained, and so that these information request letters can be kept to a minimum. Please note that when using the revised submittal form, it is not necessary to provide separate submittal authorization or deed restrictions. 2 Mr. Dunnehoo August 16, 1993 Stormwater Project No. 930809 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to September 16, 1993, or the submittal will be returned as incomplete. If you have any questions concerning this matter please feel free to call me at (919) 395-3900. Sincerely, G O 66CA'`"4"J- Ms. Linda Lewis Environmental Engineer DA/arl: S:\WQS\STORMWAT\ADDINFO\930809.AUG cc: (2) Linda Lewis Central Files 3 i • NEWPORT INSURANCE AGENCY Complete Insurance Service P.O. Box 160 ,�rw^,�,a«•'n........... ..... «• NEWPORT, NORTH CAROLINA CQ P‘ . 223-4637 June. 29, 1993 • • • . Town of Newport Planning Board Newport North Carolina 28570 Attention: Robert W. Chambers Dear Sir, • Gary A. Mercer, Mercer Building Company, has my authority to represent me and to proceed with his plans , on acres recently purchased from me and located along New Bern Street in Newport, N. C. Sincerely, ' • Agile C. Garner CC: Gary A. Mercer • County of Carteret, State of North Carolina; Sworn to and subscribed before me this the 29th day of June, 1993. My commission expires: /,_ a- q51:4/ Not ry Public STORM WATER AECEIIVLihi AUG 1 .3 1993 ti ' 'Oj # 93 0q • PRESTIGE ENGINEERING AND LAND SURVEYING 101 MANATEE STREET ,CAPE CARTERET SWANSBORO, NORTH CAROLINA 28584 PHONE 919-393-2129 19 JULY 1993 REFERENCE: GARY A. MERCER STaa WATER % PRESTIGE ENGINEERING U [ 101 MANATEE. STREET U I' CAPE CARTERET/SWANSBORO, NC 28584 PHONE 919-393-2129 AIIr 1 3 1993 DEM CONSTRUCTION SCHEDULE 'Oj # q30 8OcI 1. Obtain plan approval and other permits where needed. 2 . Hold preconstruction conference at least one week prior to any construction or filling. 3 . Place temporary gravel construction entrances and exits on the entrance to Carolina Avenue and on Deep Creek Road (NCSR-1166) . 4. Clear all road beds and bring them to grade if in cut sections. 5. Construct sedimentation basin at end of New Bern Street to intercept all water prior to it leaving project. 6. Clear lots 20, 21, 22, and 23. Place all top soil on these lots, then place silt fence on the low side of soil to prevent all sediment from exiting area. 7. Place all fill material from cut area onto road beds to be filled or stock pile fill material on lots 20, 21, 22 and 23 . Care should be taken to prevent fill from running into ditch on south side of property. 8. Put 18 inch culvert in at STATION 1+81 on New Bern Street. See calculation sheets to insure placement at proper grade. 9. Protect all existing grass swales shown on plans thus allowing for proper drainage. Seed all disturbed areas as soon as land is brought to grade (SEE VEGETATION PLAN) . 10. Remove all existing pipes that do not fall into the designed drainage system and extend and repair those existing pipes that will be used, if needed. Then reseed as needed. 11. Install drop inlets and catch basins at designated points. 12. Place rip-rap or other outlet protection devices at end of pipes as shown on plans. 13 . Place excavated drop inlet protection around each drop inlet or catch basin. 14. All erosion and sedimentation control practices will be inspected weekly or after each rainfall which ever is less. Any needed repairs will be done immediately. 15. Estimated time of construction and completion of above will be approximately 120 to 180 days. MAINTENANCE PLAN 1. All erosion and sediment control practices will be checked for stability and operation following every runoff producing rainfall, but in no case less than once every week. Any needed repair will be done immediately to insure that all structures are functioning as designed. 2 . The sedimentation that settles around basin will be clean out when the sediment is 0.25 feet deep. Gravel will be cleaned and replaced when needed or when sediment pool does not drain as designed. 3 . Sediment will be removed from behind the silt fence when it is from 0.25 to 0.5 feet high or when needed. Repairs will be done to fence as needed to prevent sediment from leaving area. 4 . All seeded areas will be fertilized, reseeded as necessary, and mulched according to the Vegetation Plan. Grass must be maintained in a vigorous dense vegetative cover and mowed as needed. 2 SEEDING SCHEDULE SEED BED PREPARATION Lime 2 Tons/ac. 10-10-20 1, 000 lbs. /ac. 0-20-0 500 lbs. /ac. Straw Mulch 2 tons/ac. (after seeding) Asphalt Tack 200 gal./ton of mulch SEEDING MIXTURE (February 1 - April 30) Tall Fescue 50 lbs./ac. Pensacola Bahiagrass 10 lbs./ac. Korean or Kobe Lespedeza (scarified) 50 lbs. /ac. (May 1 - August 31) Tall Fescue 50 lbs. /ac. Weeping Lovegrass 5 lbs. /ac. Korean or Kobe Lespedeza (scarified) 50 lbs. /ac. Browntop Millet 25 lbs./ac. (September 1 - January 31) Tall Fescue 60 lbs. /ac. Korean or Kobe Lespedeza (unscarified) 60 lbs./ac. Rye (grain) 25 lbs. /ac. For Slopes 2: 1 or steeper add 30 lbs. /ac. Sericea Lespedeza and 15 lbs. Weeping Lovegrass LANDSCAPING MIXTURE (January 1 - March 31) Common Bermuda grass (unhulled) 20 lbs. /ac. (April 1 - July 31) Common Bermuda grass (hulled) 12 lbs. /ac. Hybrid Bermuda grass sprigs may be used. 3 NARRATIVE PROJECT DESCRIPTION The purpose of this project is to construct 32 lots on approximately 17.2 acres of land. Included in the project will be the construction of about 2100 feet of road. Approximately 5.9 acres will be graded or cleared (2100 long X 60 wide) plus about three (3) acre on high lots and along drainage ways. The total disturbed area will be less than six (6) acres. This site is located between Caroline Avenue and NCSR 1166 in Carteret County on NCSR 1166 (See vicinity map) . SITE DESCRIPTION The overall slope on this project is approximately 1%, although some parts are flat while other parts have a slope of 3%. There are drainage ditches along the western and northern edges of the property. There is no OFF-SITE drainage. The site is mostly open with pines vegetation on some lots and along the drainage areas. All trees will remain except those in drainage area, and the high spots on lots 20,21,22, 26 and 27 that interrupt drainage, and those small pines in the proposed road's Right-of-Way. At the present time there are existing ditches along the proposed road • bed, these ditches will be filled after roadbeds are brought to grade. This project is laid out trying to match existing road beds that have been previously graded. ADJACENT PROPERTY Areas to the North is undeveloped with small patches of open fields. The drainage area is intermittent and well stabilized with trees, grass, and shrubs. SOIL The soil in this project is mapped as Lynchburg soil. Lynchburg soils consists of poorly drained soils with erosion hazard being slight. The soil is fine sandy loam. All soil stripped from high lots will be placed on road beds except the topsoil which will be replaced on stripped lots and ditches. After road is completed this top soil will be spread along ditches and the edge of the Right-of-Ways to aid in establishing vegetation. Almost no water will be concentrated into any one spot, therefore no runoff problem is anticipated. PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES LAND GRADING The only grading that will have to be done is clearing small 4 growth in proposed Right-of-Way and cutting into the high lots. All drainage easements will also be cleared and regraded as needed. CONSTRUCTION ROAD STABILIZATION As soon as final grade is established at the entrance to the project on New Bern Street, the road will be cross sloped so as to drain in an East-West direction into the existing road side ditches. This will be accomplished by placing 6" of NC DOT standard size ABC stone. At the entrance on NCSR 1166 the process will be to intercept downhill drainage from the culvert that crosses the proposed road, Nellie Street, to NCSR 1166. This construction entrance will be cross drained into the existing ditches along NCSR 1166. SILT FENCE As soon as lots are cleared and before top soil is brought in the silt fence will be set in place. The projected area where all top soil and other fill material will be wrapped with silt fencing. DUST CONTROL No dust problems are expected due to the small amount of grading and the short period of time this area will be exposed to the elements. FABRIC DROP INLET PROTECTION Place fabric barrier around structures as soon as they are constructed. These will be located on Nellie Street at Station 2+30 over existing pipe. DRAINAGE CALCULATIONS The rational method will be used in all calculations determining runoff. The coefficient of runoff that will be used for developed property will be 0.40. The charts from which intensity is determined will be Greenville, NC. CALCULATIONS FOR EACH DRAINAGE AREA DRAINAGE AREA "A" AREA IN ACRES = 0.34 ACRES INTENSITY = 7. 0 INCHES PER HOUR Q FOR AREA = 0.95 CFS DRAINAGE AREA "B" AREA IN ACRES = 0.34 ACRES INTENSITY = 7.0 INCHES PER HOUR 5 Q FOR AREA = 0.95 CFS DRAINAGE AREA "C" AREA IN ACRES = 0.41 ACRES INTENSITY = 7.0 INCHES PER HOUR Q FOR AREA = 1. 14 CFS DRAINAGE AREA "D" AREA IN ACRES = 0.24 ACRES INTENSITY = 7.0 INCHES PER HOUR Q FOR AREA = 0.67 CFS DRAINAGE. AREA "E" AREA IN ACRES = 1.21 ACRES INTENSITY = 7 .0 INCHES PER HOUR Q FOR AREA = 3 .38 CFS DRAINAGE EA "F" AREA IN ACRES = 2.64 ACRES INTENSITY = 7.0 INCHES PER HOUR Q FOR AREA = 7. 39 CFS DRAINAGE AREA "G" AREA IN ACRES = 0.55 ACRES INTENSITY = 7.0 INCHES PER HOUR Q FOR AREA = 1.54 CFS DRAINAGE DITCHES AND CULVERT CALCULATIONS ALL DITCHES WILL BE CROSS SLOPED AT 3 : 1 (H:V) 6 Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: NORTHWOODS SUBDIVISI Comment: PIPE 1 RUNOFF FROM AREA "A" Solve For Actual Depth Given Input Data: Diameter 1.25 ft Slope 0.0050 ft/ft Manning's n 0.013 Discharge 0.95 cfs Computed Results: Depth 0.39 ft Velocity 2.94 fps Flow Area 0. 32 sf Critical Depth 0.38 ft Critical Slope 0.0052 ft/ft Percent Full 30.95 % Full Capacity 4.57 cfs QMAX @.94D. . . . . e 4.91 cfs Froude Number 0.98 (flow is Subcritical) Open Channel Flow Module, Version 3.12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: NORTHWOODS SUBDIVISI Comment: PIPE 2 RUNOFF FROM AREA "B" Solve For Actual Depth Given Input Data: Diameter 1.25 ft Slope 0.0050 ft/ft Manning's n 0.013 Discharge 0. 95 cfs Computed Results: Depth 0. 39 ft Velocity 2.94 fps Flow Area. . . 0. 32 sf Critical Depth 0.38 ft Critical Slope 0.0052 ft/ft Percent Full 30.95 % Full Capacity 4.57 cfs QMAX @. 94D. . . . . o 4.91 cfs Froude Number 0.98 (flow is Subcritical) Open Channel Flow Module, Version 3. 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: NORTHWOODS SUBDIVISI Comment: PIPE 3 RUNOFF FROM AREA "C" AND "E" Solve For Actual Depth Given Input Data: Diameter 1.50 ft Slope 0.0020 ft/ft Manning's n 0.013 Discharge 4 .53 cfs Computed Results: Depth 1. 18 ft Velocity 3 .03 fps Flow Area 1.50 sf Critical Depth 0.82 ft Critical Slope 0.0056 ft/ft Percent Full 78.93 % Full Capacity 4 .70 cfs QMAX @.94D 5. 05 cfs Froude Number 0.48 (flow is Subcritical) Open Channel Flow Module, Version 3 . 12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: NORTHWOODS SUBDIVISI Comment: PIPE 4 RUNOFF FROM AREA "F" AND "G" Solve For Actual Depth Given Input Data: Diameter 1.50 ft Slope 0.0075 ft/ft Manning's n 0.013 Discharge 9.61 cfs Computed Results: Depth 1.33 ft Velocity 5.82 fps Flow Area 1.65 sf Critical Depth 1.20 ft Critical Slope 0.0088 ft/ft Percent Full 88.33 % Full Capacity 9. 10 cfs QMAX @.94D 9.79 cfs Froude Number 0.78 (flow is Subcritical) Open Channel Flow Module, Version 3 .12 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 • TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT Sheet 1 of' 2 MIN, 50' L---- 4, •ti.A„ ,!f,..0 11t.4{. .111+ rlca=.'• MIN. 12' ir r.T y H 9d ,i J r .% PI 7 D ° 2-3"COARSE AGGREGATE MIN ,.3 TEM-PURARY GRAVEL CONSTRUCTION ENTRANCE/EXIT Sheet 2 of' 2 DEFINITION: A graveled area or pad located at points where vehicles enter and leave a construction sites. DESIGN CRITERIA: Aggregate Size-Use 2-3 inch washed stone. Dimensions of gravel pod- 't.•4` Thickness:6 inches minimum Vdth: 12 ft. minimum or full width at all points of the vehicular , entrance and exit area, whichever is greater Length 50 ft;minimum twor itgote sttitritel ffotroffitS Ore* 4.010 1001 tree IffeOliee site ant 00 Firi* isvpitinVill by off cunstkelieleffadee.Mid ifferfredis end.etr nc e s at cif pulAlg roots. . , . . tr cote* st Ili site ors-ad that lost of apj end sedintit ere not reragg Verities trearting'iner the gravel, the tires slanutd be washed Vesting shout!,be done on on ar en stabilized-014 crushed stone the *sins into a 4ectiment trap or other suitable (Argil area. A wait rack nay alsa. be used to make wag hare convenient and effective. • NAINTENAKE: Manton the grovel pad in a condition to prevent mud or sediment from leaving the coattruction site. This nay refire perioilc topdressing with 2-Inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. immediately remove all objectionable materials spilled, lashed, or tracked onto public roadways, • CONSTRUCTION SPECIFICATIONS: I. Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properlylitge•it ... 2,Place the gravel to the specific grade and dimensions shown on the plans, and smooth it, 3.Provide *linage to carry water to a sediment trap or other suitable outlet. 4.Use geotextile fabrics because they improve stability of the foundation in locafions subject to seepage or high water table. • / _1I I t ICI I 1 O (1) (1) 3 U1 I—I I v Ul t Q 1 '(p X r III Q J II I fU I 3 P - rU .1 11l n -5 -Ir111. � '.IIIII$ 3 11111S111� / s o I ,111/14 m �1*111*111.10 in-) o m -< 111/11/1 (+ 3 cn 5 (A) 10110•�`1001 ro (0ri 5 10.00.011 - (- °) 3 ro 'kemei* 1 I w --1z ri 1 i t' 0111k I 3> 11I/Is 1111• 3 E II -h O x o III ° IIIIIIII' S to � -h X I I—I I - <-�- o\ III!IINi3 : A A4 A 0 • 6 1 Q R a * n Q / pNK / 3 A 6 h"C h r0 U vl TEMPORARY SEDIMENT TRAP Sheet 2 of 3 Definition: A small, temporary ponding basin formed by an embankment or excavation to capture sediment, Design Criteria: Ensure drainage area For a sedimentation trap does not exceed 5 acres. Storage capacity- Keep the minimum volume of' the sediment trap at 1800 cubic ft/acre based on disturbed area draining into the basin. Measure volume below the crest elevation of the outlet. The volume of a natural sediment trap may be satisfactory approximated by the equation. volume(cubic ft) = 0,4 x surface area (square Ft) x maximum pool depth (f t) Trap clennout Remove sediment From the trap and restore the capacity to original trap dimensions when sediment has accumulated to one-half the design depth, Trap efficiency- Keep the surface area peek flow as large as possible. Research by Barfield and Clar (1985) indicates that use of the following equation will give trap efficiency of 75% for most Coastal Plain and Piedmont soils: surface area at design Flow (acres) (0.01) peak inflow rate (cfs) Embankment- Ensure that embankments for temporary sediment traps do not exceed 5 ft in height measured at the center line From the original ground surface to the top of' the embankment. Additional freeboard may be added to the embankment height to allow flow through a designated bypass location. Construct embankments with a minimum top width of 5 ft and side slopes of 2:1 or flatter. Machine compact embankments. Excavation- Where sediment pools are formed or enlarged by excavation, keep side slopes at 2:1 or flatter for safety. Outlet section- Construct the sediment trap outlet using a stone section of embankment located at the low point in the basin. The stone section serves two purposes: (1) the top section serves as a • nonerosive spillway outlet for flood Flows, and (2) the bottom section provides a means of dewatering the basin between runoff' events. Stone size- Construct the outlet using well-graded stones with a d50 size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of' 14 inches. Al-ft thick layer of 1/2-3/4 inch aggregate (N.C. DOT P57 washed stone is recommended) should be placed on the inside Face to reduce drainage flow rate. Side slopes- Keep the side slopes of the spillway section at 2:1 or flatter. To protect the embankment, keep the sides of the spillway at least 21 inches thick. Depth- Keep the crest of the spillway outlet a minimum of 1:5 Ft below the settled top of the embankment. Protection from piping- Place filter cloth on the Foundation below the riprap to prevent piping. An alternative would be to excavate a keyway trench across the riprap foundation and up the sides to the height of the dam. TEMPORARY SEDIMENT TRAP Sheet 3 of 3 Construction Specifications 1, Clear, grub, and strip the area under the embankment of all vegetation and root not. Remove all surface soil containing high amounts of' organic matter and stockpile or dispose of it properly Haul all objectionable material to the designated disposal area, 2: Ensure that F0l material For the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the Ill in lifts not to exceed 9 inches and machine compact it. Over Fill the embankment 6 inches to allow for settlement. 3: Construct the outlet section ill the embankment, Protect the connection between the riprap and the soil From piping by using filter fabric or a keyway cutoff trench between the riprap structure and the soil. Place the Filter Fabric between the riprap and soil, Extend the Fabric across the spillway Foundation and sides to the top of the dam; or excavate a keyway trench along the centerline of the spillway Foundation extending up the sides to the height of the dom. The trench should be at least 2 Ft deep and 2 ft wide with 1:1 side slopes. 4: Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleanout. 5: All cut and fill slopes should be 2:1 or flatter. 6: Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 ft and maximum side slopes of 1:1 that extend to the bottom of the spillway section. 7: Construct the minimum Finished stone spillway bottom width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment. Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. B:Material used in the stone section should be a well-graded mixture of stone with a d50 size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather-resistant. 9: Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground and shape the center to confine the outflow stream. 10: Direct emergency bypass to natural, stable areas. Locate bypass outlets so that Flow will not damage the embankment. II: Stabilize the embankment and all disturbed areas above the sediment pool and downstream From the trap immediately after construction. 12: Show the distance from the top of the spillway to the sediment cleanout level (one-half the design depth) on the plans and mark it h the field. Sheet 1 of 2 SEDIMENT FENCE (SILT FENCE) • Definition - Atemporary sediment barrier consisting of filter fabric buried at the .bottom,stretched,and supported by posts.. Design Criteria - Ensure that the drainage area is no greater than 1/4 acre per 100 ft of' fence.Make the fence stable for the 10 yr peal< storm runoff.Where all runoff is to be stored behind the fence, ensure that the maximum slope length behind a sediment fence does not exceed -the specifi- cations are shown on sheet 2 of 2. Construction Specifications - MATERIALS) 1. Use a synthetic filter fabric or a pervious sheet of polypropylene,nylon, polester,or polyethylene yarn,which is certified by the manufacturer. 2.Ensure that the posts for sediment fences are either 4-inch diameter pine,2-inch diameter oak,or 1.33 lb/linear ft steel with a minimumlength 3,For reinforcement of standard strength filter fabric,use wire fence with a minimum 14 gauge and a maximum mesh spacing of' 6 inches. Construction -1.Construct the sediment barrier of standard strength or extra strength synthetic fitter fabrics. 2.Enure that the height of the sediment fence does not ex- ceed 18 inches above the ground surface. 3.Construct the filter fabric from a continuous roll cut to length of' the barrier to avoid joints.When joints are necessary,securly fas- tenthe filter cloth only at a support post with overlap to the next post. 4.Support standard strength filter fabric by wire mesh fasten- ed securely to the upslope side of the posts using heavy duty wire staples at least 1 inch long,or tie wires.Extend the wire mesh support to the bottom of' the trench. 5.When a wire mesh support fence is used,space posts a maximum of 8 ft apart.Support posts should be driven securely into the ground -to a minimum of 18 inches. 6.Extra strength filter fabric with 6-ft post spacing does no-t require wire mesh support fence.Staple or wire the filter fabric directly to posts. 7.Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed ack fii the trench with ine of posts and upslope from the compacted soil or gravel pier. lacedover 8.Back the filter fabric. 9.Do not attach filter fabric to existing trees. Maintence- Inspect sediment fences at least once a week and after each rainf( Make any required repairs immediately.Should the fabric of a sediment fence collapse,tear,decompose or become ineffective,replace it promptly.Reptace burlap every 60 days.Remove sediment deposits as necessary to provide adequate stor volume for the next rain and reduce pressure on the fence.Remove all fencing materials and unstable sediment deposits and bring to grade and stabilize it af- the contributing drainage area has been properly stabilized. Sheet 2 of' 2 maximum slope length and slope for for sediment fence • SLOPE SLOPE LENGTH <2% 100 2 to 5% 75 5to10% 50 10 to 20% 25 )20% 15 Spesifications for sediment fence fabric Physical Property Requirements Filtering efficiency 85%-min tensile strength at standard strength 20% max elongation 301b/lin in extra strength 501b/lin in slurry flow rate 0.3 gal/sq Ft/min Installation detail of sediment Fence l• s-. compacted �OI�►4•4., +l4.'M' fill OOI`j00I3+40I`�0 lieu/%% ///%//1/i = : ►1At„6 11il �111=ll 11 -1 1, l ll. I 1 f I I I—I I 1171-V- -L I-I 11 III 1 -ll'I—II 1=j!`-III=1 ii—W---min=DU=W=m—m-1— 9 filter fabric Backfill min 8' thick layer of gravel 14' TNeinfilt eireva:r _ow* _ 1 I 111 AL-Latiip "00- —III—II I i_TI— —1H If—I Em V-trench Ijltll-lL...II Extension of fabric and wire into the trench filter fabric III IIIIII III . III I III fi! III III Ili III IIlIII III III III III III III III III III III III a- III III III III II III II - WIRE SHEET 1 OF 4 DESIGN FOR OUTLET STABILIZATION STRUCTURES DEFINITION A structure designed to control erosion at the ou tle t of a channel or conduit, PURPOSE' To prevent erosion at the outlet of a channel or conduit by reducing the velocity of flow and dissipating the energy. DESIGN CRITERIA' The criteria for design of riprap outlets are' Capacity--IO.year,peak runoff' or the design discharge of the wa ter conveyance structure, whichever is grea ter. To/Iwo ter depth--Determine the depth of tailwa ter immediately below the pipe outlet based on the design discharge plus other contributing Flows. IF the tailwa ter depth is less than half the diameter of the outlet pipe and the receiving stream is sufficiently wide to accept the divergence of Flow, It is classed as a minimum tailwa ter condition. If the tailwa ter depth is grea ter than half the pipe diameter, It is classed as a maximum tailwa ter condition. Pipes that outlet onto broad flat areas with no defined channel nay be assumed to have a minimum tailwa ter condition unless site condition Indicate otherwise, Apron size--The apron length and width can be determined according to the tailwa ter condition, If the water conveyance structure discharges directly Into a well-defined channel, extend the apron across the channel bottom and up the channel banks to an elevation of 0.5 Ft above • the maximum tailwa ter depth or to the top of the bank, whichever is less. Determine the maximum allowable velocity For the receiving stream, and design the riprap apron to to reduce Flow to this velocity before flow leaves the apron. Calculate the apron length required to meet stable conditions downstream, whichever /s greater, Grade--Ensure that the apron has zero grade. There should be no over fall at the end of the apron; that Is, the eleva tion of the top of the riprap at the downstream end should be the same as the elevation of' the bottom of the receiving channel or the adjacent ground if there Is no channel. Alignment--The apron should be straight throughout its entire length, but IF a curve is necessary to align the apron with the receiving stream, locate the curve in the upstream section of riprap. SHEET 2 OF 4 Ma terials--Ensure that riprap consists of a well graded mixture of stone. Larger stone should be predominate, with sufficient smaller sizes to fill the voids between the stones. The diameter of the largest stone size should be no grea ter than 1.5 times the a!50 size. Thickness--Make the minimum thickness of riprap 1.5 times the maximum stone diameter. Stone quality--Select stone for riprap from field stone or quarry stone, The stone should be hard, angular, and highly weather-resistant. The specific gravity of the Individual stones should be at least 25, Fil ter--Install a Filter to prevent soil movement through the openings in the riprap. The filter should consist of a graded gravel layer or a syn the tic filter cloth, Design filter blankets by the method described in Practice 6.15,Riprap. CONSTRUCTION SPECIFICATIONS! L Ensure that the subgrade For the fitter and riprap follows the required lines and grades shown /n the plan. Compact any Fill required in the subgrade to the density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soil may also be filled by increasing the riprap thickness. 2. The riprap and gravel Filter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected From punching or tearing during installation. Repair any damage by removing the riprap and placing another piece of filter cloth over the damaged area. All connecting joints should overlap a minimum of 1 ft. If the damage is extensive, replace the entire Filter cloth, 4. Riprap may be placed by equipment, but take care to avoid damaging the Filter. 5. The minimum thickness of the riprap should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone. It should be hard, angular, highly wea ther-resistant and well graded. 7, Construct the apron on zero grade with no overlall at the end. Make the top of the riprap at the downstream end level with the receiving area or slightly below it, SHEET 3 OF 4 8, Ensure Ma t the apron /s properly aligned with the receiving stream and preferably straight throughout its length, If a curve is needed to fit site conditions, place It in the upper section of the apron. 9. Inriedia tely after construction, stabilize all disturbed areas with vegetation, ilAINTENANCEI Inspect riprap outlet structures after heavy rains to see if any erosion around or below the riprap has taken place or /f stones have been dislodged Inriedia tely make all needed repairs to prevent Further darlage. SHEET 4 OF 4 L 4 ��•�••••••••••••• �—� � • • • • • • • • ��i••••••••••••••••••••••••• • • • • • • • • • • • • • • * • • • • • • • • • • • • • • • • • • • • • • • • • • • �i••••••••••••••• •••••••••• Do. ••••••••••••••••••••••• • • • l••••••••••••••••••••••••••• 11••••••••••••••••••••••••••• •i•••••• •••••••••••••••• •• • ••••••• • ••••••••••••••• • q 114144444.04 1 414 ••••••••••••••••••••• PLAN urn ••••••••••••••••••••:••••••—�i�ii a 11 II)\ ITI r Il II 0.4444444444444••�•�•� II — 11.�.11 II emoi SECTION FILTER FABRIC NOTES 1. L /s the length of the riprap 5. For riprap protection use class apron. A or class B erosion control 2 d=1.5 times the maximum stone stone. diameter but not less than 6. 6. Apron to be placed level with 3. In a well-defined channel extend the top surface of riprap at the apron up the channel banks same level as surrounding land to an elevation of 6' above the surface-- no overfall should maximum ta/lwa ter depth or to exist. the top of the bank, whichever is less. 4, A Filter blanket or filter fabric should be installed between the riprap and soil foundation. Excavated Drop Inlet DEFINITION- An excavated area in the approach to a drain drop inlet or curb inlet PURPOSE- To trap sediment at the approach to a storm drainage system. this practice allows use of permanent stormwater conveyance at an early stage in site development. DESIGN CRITERIA- Limit the drainage area to less than one acre. Keep the minimum depth at 1 ft and the maximum depth of two ft as measured from the crest of the inlet structure. Maintain side slopes around the excavation no steeper than 211. Keep the minimum volume of the excavated area around the drop inlet at approximately 35 cu.yds./acre disturbed Shape the basin to fit site conditions, with the longest dimensions oriented toward the longest inflow area to provide maximum trap efficiency. Install provisions for draining the temporary pool to improve trapping efficiency for small storms and to avoid problems from standing water after heavy rains. MAINTENANCE- Inspect, clean, and properly maintain the excavated after every storm until the contributing drainage area has been permanently stabilized. To provide satisfactory basin efficiency, remove sediment when the volume of the basin has been reduced by one-half. Spread all excavated material evenly over the surrounding land area or stockpile and stabilize it appropriately. CONSTRUCTION SPECIFICATIONS- 1. Clear the area of all debris that might hinder excavation and disposal of spoil. 2, Grade the approach to the inlet uniformly. 3. Protect weep holes by gravel. 4 When the contributing drainage area has been permanently stabilized,seal weep holes,fill the basin with stable soil to final grading elevation, compact it properly, and stabilize. 0 >, +' c 4 d U E v) +' N N L -S L E 75 eu Q O -6 j +' O U c O d D d E I E L Q1 +' U _I d m c U W 3 d U) Q > -05 C E Q L d 5 11I CedL0) 0 S 75 Ut I i=I 1 =III _ =I =I I = I III=1 1=I I h► ► I I� III I ► _ =III III= =III= 1=1I I 1=11 II W I =III= =III= '\ I-I I I I I-1 I _I-III . ' ,/ y 0 "04 1 1 1=1 1 1— III ce AI 111=1 I 1=111 •••••••••••••• , •�••�•• • •• ♦ • • a •• ¶ II In POI I -- ••� W a d III i•s ii• CY p� ••�__ _,•• �� 11- ••••�/1•••••••i ¢ 1a 3 a—I I . • •• ••••••i•••i• Li 1$"1'/ \ ,;.;.III=1 I I iffl [ I I II I IIljr_L 2 III1=-1 I1I II III= I /I—=1 W c,1 Ax ,- A d O W £ a _ H ► 0 16 1 � , _F, JIB X O W 2 -' W f a N FINANCIAL RESPONSIBILITY/OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT No person may initiate any land-disturbing activity on one or more contiguous acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section,N.C. Department of Environment,Health, and Natural Resources. (Please type or print and, if question is not applicable,place N/A in the blank.) Part A. 1. Project Name Northwoods 2. Location of land-disturbing activity: County Carteret ,City or Township Newport t , and Highway Street Deep Run Roacj (NCS 1166) 3. Approximate date land-disturbing activity will be commenced: August 1 1994 - 4..Purpose of development (residential,commercial, industrial,etc.) : R e i d e n s a,1. U i v i�, 5.Total acreage disturbed or uncovered{including oft-site botrost and waste !1 r 9 6.Amount of fee enclosed$7Q.4 0 STORMTER It 1, VGA � Y No X 7.H�fi an erosion and sedrmgntatron c�ntrolplan�gtt<tiled . �qs �--�*�UG 1 3 1493 F 8. Nilson to contact should sediment control issue,(We during Land-disturb$g activity, D E M piercer Building Co, '� # 930809 Nop"e ,,ary Mex cer Tet0phorig 91 9.Lqpdowner(s)of Record( Use blank page to Mt additional owners.): Nellie C. • Garner Nellie C. Garner Name (s) P. 0. Box 160 462 Howard Blvd . Current Mailing Address Current Street Address Newport, NC 2$570 Newport; NC 28570 City State Zip. City State Zip 10. Recorded in Deed Book No. 563 Page No. 442 . Part B. 1.Person(s)or firms(s)who are financially responsible for this land-disturbing activity(Use the blank page to list additional persons or firms): Mercer Building Co. Mercer Building Co . Gary A. Mercer Gary A. Mercer Name of Person (s)or Firm(s) 2501 Front Street 2501 Frnnt Street Mailing Address . Street Address Beaufort , NC 28516 . Beaufort , NC 28106 City . ,Stale Zip City State j . Zip • (919)728-6636 • Telephone (919)728-66z36 Telephone - , 2. (a) li the Financially Responsible Party is not a resident of North Carolina give name and street address of a North Carolina Agent. . Name Mailing Address Street Address ' City Slate Zip , City Slate Zip Telephone t Telephone (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the certificate of assumed name. If the Financially Responsible Party Is a Corporation give name and street address of the Registered Agent. .S . Gary A. Mercer Name of Registered Agent , 2501 Front Street 2501 Front Street , Mailing Address Street Address Beaufort, NC 28516 Beaufort, NC 28516 City Stale Zip City State Zip (919)728-6636 (919) 72R-66t6 Telephone Telephone . The above information is true and correct to the best of my knowledge and belief and was provided by me under oath. (This form must be signed by the financially responsible person if an individual or his attorney-in- fact or if not an individual by an officer, director, partner,or registered agent with authority to execute instru- ments for the finanacialiy responsible person). I agree to provide corrected Information should there be any change in the information provided herein. Gary A. Mercer Pc /44C'4- ' ''a'y Ca • Type or print name Title or Authority Sign ' Date July 9, 1993 I, Vicki B. P e n r y , a Notary Public of the County of C a r t e r e t State of North Carolina, hereby certify that Gary A. Mercer appeared personally before me this day and being duly sworn acknowledged that the above form was exe- cuted by him. r �\�4% 8. pea, my hand and notarial seal,this 9 t h day of July , 199 3 NOTARY Seal yr olary My.t� k 0fl r°s PUBLIC My commission expires •tir g ) • • ••\�• • —�l '1•�.• f \� 1— •I.__ ,\ /•II a 1f1f —�` ,. , X/7 8 l • • • \ e?k, /'' !6 .II l I 8 Y' 8 •_ dm b ol. Ifyr -i . ' —' J as a ,L5 _' -ate 9ry a' •`• `\ - a•• 'Ol ® I \1 4$ \I Is, - \ `` %C/B • )•/' ,:.•.,7./I*\l‘'../....z../• •;\:..N,V•.; ili,41,, lpit1 —.... „.,"i.:; I? k,-. .:i,..) ,7 \t b .' N 3852 ,1 rL�!t ,�y \\ t. • `�\ \ .:Yl 1 +%7-4-:, ..:.�, OJ i;,, ,,,,,,, ¢y N St \ Il - f. 8 - y - 1.J1:r,y, .-..,,<(..\.:•,\:/-I;/ ,.•,.•1÷,_ '..-._ .•\• _1 i l'_ lid 11 11 'ems .i'i4 451 ?.P arn .t-kr''..-,;.------ 46-\. : ro• M Cti) a ---. . , 1 II ooKout• \• 2- .Tower° ••rf I \, - s . c - n 1 u _` T \ L 51 1 j 1 IRO, b ` -�._i- \ _ b 11 I\ _ 9 si+P 11 r , r /6 ri g g ' ^iJ .:'NAt 41 1- '^ b /. _ \I b of 1 2k S ==T== _I \ i%' I !g Z ts L/ < II `t yam:f-t it 4. i 4113111.1f.-°••/"Igi 'I. III 4 II r :—ma's ;1• - _� \a\ I • • . /1\ f II `\\ \II T-, _ — Cs i _ \ E K I L•\ II � I S 38r��0'.. _ _ t� + � =.7,- \. `_ II M14� E x„ Ip t. III l i — /h.'''. �'gbgi II • ?�`� � rr o` Il I �b 1 7FEET/ --A04.1.) C -- ,; , . ,,,Cr Vitillif -''U _ / - II t ..:-p, ..... _ , I� u I/� _ _: � �• i_i_k\ i ~,, 1 )11'‘ • ' ... __ _ . . � � mac. ' 1• . - X/9 c,...:...\\__\ 3849---46 1 \\::7..11( \ . 7is' 1,47 itt\ 0 ,a4 $ . . . _ i: i _ „L., . N .12 . II p ,....i z„,...._>kir--------G A . .F1, p: ' ' • pp�� A- U "11 ' rt ti t Engineering and Land Surveying,P.A. 101 Manatee meet Cape Carteret Swansboro,NC 28584 (919)393-2129 FAX (919)393-3075 NOTICE Mr. Mercer has requested all permits and correspondence be sent to him % Prestige Engineering at above address . ‘`.�� CAR004,, , 4.• '°°° •!O SSIOA .°°°'.� r..a?,� �.••�0�� % ..Jos ph F. Dunnehoo , P.E. ° a 5E A1- 133.01 o :47 • ✓ems°'°FH01 N�-: w .•`' STORM AT ER Am 1 3 1993 'oT # 9 8oq Water - Sewer- Structural- Storm Water and Sedimentation.Erosion Control Planning-inspections Envkonmentat- SubdArblons - Wetlands - Monitoring Wells - Computer Drafting - Land Planning