Please accept our application for a culvert extension on our property at 2 Perdue Place, Asheville NC
28806.
The reason for the extension is to improve the area where the current under road culvert currently
discharges the stream bordering the lower end of our property and at the same time make possible
the construction of a accessory structure that is otherwise impossible because of
a 20'-0" sewer easement cutting through our property in addition to the recently implemented 30'-0"
stream buffer to perennial streams -see attached Site Plan explaining graphically the existing site
conditions
Currently the culvert terminates several feet above stream bed. Without proper protection
of the banks of the stream splashing water is causing erosion around the outlet We are proposing
to add a concrete connector and culvert extension pipe at a lower elevation — see the attachedS2
Section The area of extension would be covered with soil and replanted with native
vegetation The proposed length of the culvert extension is 30'-0".
If you have any questions or concerns or if you need additional drawings of clarifications please
contact me, Jakub Markulis at 828 231 8338 My email isiakubm Drusafova-markulis com
Thank you for your assistance.
�FG� iVEO
Sincer y,
S
Fen 25 x,018
JO
arkulis r.%WK.4AN0 QUALITY
ST101kMWATER PERMITTING
CULVERT EXTENSION
�-ZAO
VICINITY MAP
@ 2 PERDUE PLACE
ASHEVILLE, NC 28806
Description:
The purpose of this project is to modify an outlet of an existing culvert under adjacent
road to simultaneously improve the area drainage and erosion issues while regaining a
small portion of buildable space on the lot that has been lost to sewer easement and
recently implemented stream buffer.
Currently the culvert terminates several feet above stream bed. Without proper protection
of the banks of the stream splashing water is causing erosion around the outlet.
The proposed plan is to add a concrete connector and culvert extension pipe at a lower
elevation. The area of extension would be covered with soil and replanted with native
vegetation. The proposed length of the extension is 30'.
V ouwvneM4 14TS
Covew
PCIJ R�A'tah'oti
CtZU edtbvt
S
— St t,e"m De k vwt'rle,-t
Z-sfdeal �nw15
OD
i 1
0S?
Cb _.
tli
ICOVERED`
DECZS
_�
GRAVEL
PAD
61-01,
ITREE
Lp /
N 38° 2
SETBACK LINE
00
MAIN
HOUSE
siy•:
o
�O
STREAM BUFFER
- STREAM
PROPOSED CULVERT EXTENSION
\,
0 "E , 4 PROPERTY LINE
0
33'-4" o
7
7� FUTURE —r t'+ -
ACCESSORY STRUCT. /
(-600SF FOOTPRINT)
i
7
cOZ
a TREE
•L ego
`1(110 69°2 C.
J
Lot. ,«oz
` z
0.28 acres,��
I' -- OLD PROPERTY LINE
/
I ! C�
SITE PLAN
1 " = 20'-0"
O�O� W A r f;,,
O Nii� Y
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre -Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the Corps:
Q Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps?
❑ Yes Q No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑X No
For the record only for Corps Permit:
❑ Yes ❑X No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes ❑X No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes ❑X No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2. Project Information
2a. Name of project:
2 Perdue PI Accessory Structure
2b. County:
Buncombe
2c. Nearest municipality / town:
Asheville
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state project no.
3. Owner Information
3a. Name(s) on Recorded Deed:
Jakub Markulis, Maria Rusafova
3b. Deed Book and Page No.
2878 0472
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
2 Perdue PI
3e. City, state, zip:
Asheville, NC, 28806
3f. Telephone no.:
(828) 231-8338
3g. Fax no.
3h. Email address:
kuba.markulis@gmail.com
Page 1 of 10
PCN Form — Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent Q Other, specify. Owner
4b. Name:
Jakub Markulis
4c. Business name
(if applicable):
4d. Street address:
2 Perdue PI
4e. City, state, zip:
Asheville, NC 28806
4f. Telephone no.:
(828) 231-8338
4g. Fax no.
4h. Email address:
kuba.markulis@gmail.com
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e Telephone no.:
5f. Fax no. -
5g. Email address:
Page 2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1 a
Property identification no. (tax PIN or parcel ID):
963801516700000
1b.
Site coordinates (in decimal degrees):
ILatitude:- Longitude:
1 c.
Property size:
0.28 acres
2.
Surface Waters
2a.
Name of nearest body of water to proposed project:
UT to Hominy Creek
2b. Water Quality Classification of nearest receiving water:
C
2c.
River basin:
French Broad
3.
Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Wooded triangle -shaped corner lot w/ approximate 40% average slope w/ some dead trees removed. Stream at SM edge of the property w/ 601f of the
stream on the property Existing main house - 1,660sf.
3b.
List the total estimated acreage of all existing wetlands on the property: 0
3c.
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 60
3d. Explain the purpose of the proposed project.
Modification and extension of an existing culvert to accommodate construction of a new 800sf accessory structure.
3e. Describe the overall project in detail, including the type of equipment to be used:
Extend existing culvert passing under street and onto the property by approximately 30' while lowering the mouth of the pipe. Fill in an eroded portion c
4.
Jurisdictional Determinations
4a.
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
roject includin all rior hases in the ast?
❑X Yes ❑ No ❑ Unknown
Comments: State completed stream determination on 01/08/16
4b.
If the Corps made the jurisdictional determination, what type
of determination was made?
❑ Preliminary ❑ Final
4c.
If yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other: State
4d.
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5.
Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes ❑X No ❑ Unknown
5b.
If yes, explain in detail according to "help file" instructions.
6.
Future Project Plans
6a.
Is this a phased project?
❑ Yes ❑X No
6b.
If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands Q Streams — tributaries Q Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland Impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W11 -
Choose one
Choose one
Yes/No
-
W2 -
Choose one
Choose one
Yes/No
-
W3 -
Choose one
Choose one
Yes/No
-
W4 -
Choose one
Choose one
Yes/No
-
W5 -
Choose one
Choose one
Yes/No
-
W6 -
Choose one
Choose one
Yes/No
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 P
Culvert
UT to Hominy Creek
PER
Corps
4
30
S2 -
Choose one
-
S3 -
Choose one
-
-
S4 -
Choose one
S5 -
Choose one
-
S6 -
Choose one
-
-
[]E3=0
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S then indivi ually list all open water impacts below.
4a.
Open water
impact number
Permanent (P) or
Temporary T
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b
Buffer Impact
number —
Permanent (P) or
Temporary T
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet)
6g.
Zone 2
impact
(square
feet
B1 -
Yes/No
B2 -
Yes/No
B3 -
Yes/No
B4 -
Yes/No
B5 -
Yes/No
B6 -
Yes/No
6h. Total Buffer Impacts:
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
We plan to reduce the amount of existing erosion currently taking place around the mouth of the existing culvert which is currently several feet up and
dumping water from a height by lowering it to the creek level. We believe that the proposed modification not only will not adversely impact but will
improve the current situation.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
We plan to install a connection box at the end of existing culvert and install a section of new pipe at the bottom of the new box. The area over the
extension will be filled with rock, gravel and cover it with top sod and new planting to promote good drainage, stabilize the area and eliminate future
erosion
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ❑ No
2b. If yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quantity:
Quantity:
Quantity:
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non -riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
❑ Yes ❑ No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c.
6d.
6e.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
❑ Yes ❑ No
1 b.
If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
2.
Stormwater Management Plan
2a.
What is the overall percent imperviousness of this project?
oda
2b.
Does this project require a Stormwater Management Plan?
❑ Yes ❑ No
2c.
If this project DOES NOT require a Stormwater Management Plan, explain why:
2d.
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e.
Who will be responsible for the review of the Stormwater Management Plan?
3.
Certified Local Government Stormwater Review
3a.
In which localgovernment's jurisdiction is thisproject?
3b.
Which of the following locally -implemented stormwater management programs
apply (check all that apply):
❑ Phase II
❑ NSW
❑ USMP
❑ Water Supply Watershed
❑ Other:
3c.
Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
4.
DWQ Stormwater Program Review
4a.
Which of the following state -implemented stormwater management programs apply
(check all that apply):
❑Coastal counties
❑HQW
❑ORW
[]Session Law 2006-246
❑ Other:
4b.
Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
5.
DWQ 401 Unit Stormwater Review
5a.
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b.
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1 a.
Does the project involve an expenditure of public (federal/state/local) funds or the
❑ Yes Q No
use of public (federal/state) land?
1 b.
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
El Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c.
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter.)
Comments:
2.
Violations (DWQ Requirement)
2a.
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
El Yes ❑ No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b.
Is this an after -the -fact permit application?
El Yes Q No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3.
Cumulative Impacts (DWQ Requirement)
3a.
Will this project (based on past and reasonably anticipated future impacts) result in
F1 Yes ❑X No
additional development, which could impact nearby downstream water quality?
3b.
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4.
Sewage Disposal (DWQ Requirement)
4a.
Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Culvert alteration - N/A
Future accessory structure - tie to existing sewer line
Page 9 of 10
PCN Form — Version 1.4 January 2009
Fish and Wildlife Services
ave been contacted and are
eviewing the case
5. Endangered Species and Desi ated Critical Habitat (Corps Requirement)
14
5a. Will this project occur in or near an area with federally protected species or
habitat?
❑ Yes ❑ No
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts?
❑X Yes ❑ No
5c. If yes, indicate the USFWS Field Office you have contacted.
Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑ No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
❑ Yes ❑ No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain?
❑ Yes Q No
8b. If yes, explain how project meets FEMA requirements:
8c What source(s) did you use to make the floodplain determination?
JKUr,
Applicant/Agent's Printed Name
Applicant/ g nt's Signature
( ent's signature valid only if an authorization
letter from the applicant isprovided.)
Date
Page 10 of 10
z
W
Z U
III-
<W
mo _
U Zow —
�
III-
O
cOn-
0 0
d U m
0a
a.
w
z
m
L)
Fn M
�-0 -j w
Of U X j
W w W
QJw� - -
0 U
Z Z O 0
X X w w = JJ r -
Wwzz C'"
-
I I I-
Z
_O
co
Z
W00
O
co
X N
U
wwW
J
1 >
W
Q
WW
U
0-
W
D D
Ua.W
N
F—
C)
W
U)
N
U)
Z O
W Z
aw
Ory
F-
O 2
W U
F- Z
ww
wof
2 F
w
2U O -O
NwF-
Q
J N
Qa
W QS a'W J-
0V), E
Q�
P()- 0
F-(YLd
Of 0V) -J -i
~�OZmQQ
H Y
V)z0C)
2�
wQ
QOM
0C) 0� D
OQm
a�
-Q
Jaz
EQL,
EQF-
:2J
Q
woza(ALw�
- JZ W
of0
z
��U'0
dF--
O U W w W z m
W
W z
� W
H-
m W O Q
Z�m2�mQQ
�wm
Wm
m8U
Ow
JF -Q J JU
Q N J D J n- J
OUJw
m x J H
m
-iZ
U
W J z U
C7Q�w
LLJ T- �Q
wQ
Oz?V)0
aQ0
JQQ_w
Z�cn3wcn
wcncn
U)V)aV)
w
C7 r
N
rl)
Q
Q
Q
Q
wz
wz
Q
a
�o
�LLJ
JUV)
JUV)
tQF
Yo- -
<F-
yo- -
UmJ
OmJ
EQL,
EQF-
mUOc�
mo
ves
J
J
Q
Q
Ld
Ldz
LL)z
Q
Q
�o
o
!••�NN•N••uN•
••N•N••uu•••
JU(n
_j -j
EQL,
EQF-
Yn--
Yd-
U2J
UPJ
Q O:
<02
mU[O
mUM
z
O
1—
Q
Q
U
X
Ld
Q
z
Q
�N
J
J
Of
F- 2
Ln
o�
zQ
:Dw
as
W U
o- w
0Q�
02
W U
F- Z
W w
w
2
N
Z U
w
Z
a
0�
Q 2
W O
F- Z
W w
W �
2 �
J
Q
w
�o
F
J U V)
E Q
U m J
<0-
m C) U)
0:mUUD
J
Q
w
a -Z
�o
F-
J O N
�Q�
UPJ
Q0:
0]U co
►.M
O
�'ii7•Lii::::::i�
••�NUNNN•N•
••.•NNN•u•N•
•
�- •Y•NNNNN•V
NINN•••N•NU
•'•uN•u•u•N�
�•��:•SSiiS•i:•�:i
it
•:'iiiiiiS•iiiii
�:ii•�iii•SSii!
!••�NN•N••uN•
••N•N••uu•••
�•!'iiiiiS•iiiiiiiS!
�••M••MNNM••.
.
..................
:I,.n•..5�iiii
uo
••N••4
N ••N•
�•NN
Lu •
�•S!�•ii•Siiiiiii•!
4.SS••S'
�•; iiliai�i•�•i•�ilii� �
:N N••
-
u
•
:.............
•
-
LLJ
,►
•
•::V.S.�.
it
•5........
.
:I,.n•..5�iiii
uo
••N••4
N ••N•
�•NN
Lu •
4.SS••S'
:N N••
ii �iiiii•SiiS•
iii:•i:•iiiiS•iS•i
:.............
•
LLJ
•1
Of
LLJ•
)F
.-
'
LLJ
••
U)
z
0
North Carolina Department of Environmental Quality
Pat McCrory
Governor
January 8, 2016
Subject: Stream Identification Request
To Whom It May Concern:
Donald R. van der Vaart
Secretary
This letter provides the findings of a site visit to Buncombe County Parcel Identification Number
963801516700000 at 2 Perdue Place in Asheville NC conducted on January 8, 2016 to provide a stream
determination. The stream feature is shown as a blue line along the northwestern property boundary on
the Buncombe County GIS website. The results were as follows:
Features
Score
Comments
Geomorphology
14.5
Stream analyzed starting at culvert outfall
Hydrology
12.5
Biology
7
Total
34
Determination:
Perennial
Stream
Determination
Please contact me if I can be of any further assistance: 828-296-4662 or zan.price@ncderlr.gov .
Sincerely,
Zan Price, PE
Assistant Regional Supervisor
Water Quality Regional Operation Section
GAWR\WQ\Buncombe\Stream Calls\2 Perdue Place\StreamDetermination_2 Perdue Place.docx
Water Quality Regional Operations Section
2090 U.S- Highway 70. Swannanca N C 28778
Phone (828) 296-4500
FAX (828) 299-7043
Internet h2o.enr state nc us
An Equal OpporlunitylAffirmative Action Employer
0