Loading...
HomeMy WebLinkAbout20160182 Ver 1_401 Application_20160225NC DWR, 401 8 Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 19 February 2016 Dear Sir/ Madam 20160182 Please accept our application for a culvert extension on our property at 2 Perdue Place, Asheville NC 28806. The reason for the extension is to improve the area where the current under road culvert currently discharges the stream bordering the lower end of our property and at the same time make possible the construction of a accessory structure that is otherwise impossible because of a 20'-0" sewer easement cutting through our property in addition to the recently implemented 30'-0" stream buffer to perennial streams -see attached Site Plan explaining graphically the existing site conditions Currently the culvert terminates several feet above stream bed. Without proper protection of the banks of the stream splashing water is causing erosion around the outlet We are proposing to add a concrete connector and culvert extension pipe at a lower elevation — see the attachedS2 Section The area of extension would be covered with soil and replanted with native vegetation The proposed length of the culvert extension is 30'-0". If you have any questions or concerns or if you need additional drawings of clarifications please contact me, Jakub Markulis at 828 231 8338 My email isiakubm Drusafova-markulis com Thank you for your assistance. �FG� iVEO Sincer y, S Fen 25 x,018 JO arkulis r.%WK.4AN0 QUALITY ST101kMWATER PERMITTING CULVERT EXTENSION �-ZAO VICINITY MAP @ 2 PERDUE PLACE ASHEVILLE, NC 28806 Description: The purpose of this project is to modify an outlet of an existing culvert under adjacent road to simultaneously improve the area drainage and erosion issues while regaining a small portion of buildable space on the lot that has been lost to sewer easement and recently implemented stream buffer. Currently the culvert terminates several feet above stream bed. Without proper protection of the banks of the stream splashing water is causing erosion around the outlet. The proposed plan is to add a concrete connector and culvert extension pipe at a lower elevation. The area of extension would be covered with soil and replanted with native vegetation. The proposed length of the extension is 30'. V ouwvneM4 14TS Covew PCIJ R�A'tah'oti CtZU edtbvt S — St t,e"m De k vwt'rle,-t Z-sfdeal �nw15 OD i 1 0S? Cb _. tli ICOVERED` DECZS _� GRAVEL PAD 61-01, ITREE Lp / N 38° 2 SETBACK LINE 00 MAIN HOUSE siy•: o �O STREAM BUFFER - STREAM PROPOSED CULVERT EXTENSION \, 0 "E , 4 PROPERTY LINE 0 33'-4" o 7 7� FUTURE —r t'+ - ACCESSORY STRUCT. / (-600SF FOOTPRINT) i 7 cOZ a TREE •L ego `1(110 69°2 C. J Lot. ,«oz ` z 0.28 acres,�� I' -- OLD PROPERTY LINE / I ! C� SITE PLAN 1 " = 20'-0" O�O� W A r f;,, O Nii� Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: Q Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes Q No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: 2 Perdue PI Accessory Structure 2b. County: Buncombe 2c. Nearest municipality / town: Asheville 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no. 3. Owner Information 3a. Name(s) on Recorded Deed: Jakub Markulis, Maria Rusafova 3b. Deed Book and Page No. 2878 0472 3c. Responsible Party (for LLC if applicable): 3d. Street address: 2 Perdue PI 3e. City, state, zip: Asheville, NC, 28806 3f. Telephone no.: (828) 231-8338 3g. Fax no. 3h. Email address: kuba.markulis@gmail.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent Q Other, specify. Owner 4b. Name: Jakub Markulis 4c. Business name (if applicable): 4d. Street address: 2 Perdue PI 4e. City, state, zip: Asheville, NC 28806 4f. Telephone no.: (828) 231-8338 4g. Fax no. 4h. Email address: kuba.markulis@gmail.com 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e Telephone no.: 5f. Fax no. - 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1 a Property identification no. (tax PIN or parcel ID): 963801516700000 1b. Site coordinates (in decimal degrees): ILatitude:- Longitude: 1 c. Property size: 0.28 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Hominy Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: French Broad 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Wooded triangle -shaped corner lot w/ approximate 40% average slope w/ some dead trees removed. Stream at SM edge of the property w/ 601f of the stream on the property Existing main house - 1,660sf. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 60 3d. Explain the purpose of the proposed project. Modification and extension of an existing culvert to accommodate construction of a new 800sf accessory structure. 3e. Describe the overall project in detail, including the type of equipment to be used: Extend existing culvert passing under street and onto the property by approximately 30' while lowering the mouth of the pipe. Fill in an eroded portion c 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / roject includin all rior hases in the ast? ❑X Yes ❑ No ❑ Unknown Comments: State completed stream determination on 01/08/16 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: State 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands Q Streams — tributaries Q Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland Impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W11 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT to Hominy Creek PER Corps 4 30 S2 - Choose one - S3 - Choose one - - S4 - Choose one S5 - Choose one - S6 - Choose one - - []E3=0 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. We plan to reduce the amount of existing erosion currently taking place around the mouth of the existing culvert which is currently several feet up and dumping water from a height by lowering it to the creek level. We believe that the proposed modification not only will not adversely impact but will improve the current situation. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. We plan to install a connection box at the end of existing culvert and install a section of new pipe at the bottom of the new box. The area over the extension will be filled with rock, gravel and cover it with top sod and new planting to promote good drainage, stabilize the area and eliminate future erosion 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ❑ No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? oda 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? 3b. Which of the following locally -implemented stormwater management programs apply (check all that apply): ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state -implemented stormwater management programs apply (check all that apply): ❑Coastal counties ❑HQW ❑ORW []Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes Q No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, El Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? El Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in F1 Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Culvert alteration - N/A Future accessory structure - tie to existing sewer line Page 9 of 10 PCN Form — Version 1.4 January 2009 Fish and Wildlife Services ave been contacted and are eviewing the case 5. Endangered Species and Desi ated Critical Habitat (Corps Requirement) 14 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑X Yes ❑ No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes Q No 8b. If yes, explain how project meets FEMA requirements: 8c What source(s) did you use to make the floodplain determination? JKUr, Applicant/Agent's Printed Name Applicant/ g nt's Signature ( ent's signature valid only if an authorization letter from the applicant isprovided.) Date Page 10 of 10 z W Z U III- <W mo _ U Zow — � III- O cOn- 0 0 d U m 0a a. w z m L) Fn M �-0 -j w Of U X j W w W QJw� - - 0 U Z Z O 0 X X w w = JJ r - Wwzz C'" - I I I- Z _O co Z W00 O co X N U wwW J 1 > W Q WW U 0- W D D Ua.W N F— C) W U) N U) Z O W Z aw Ory F- O 2 W U F- Z ww wof 2 F w 2U O -O NwF- Q J N Qa W QS a'W J- 0V), E Q� P()- 0 F-(YLd Of 0V) -J -i ~�OZmQQ H Y V)z0C) 2� wQ QOM 0C) 0� D OQm a� -Q Jaz EQL, EQF- :2J Q woza(ALw� - JZ W of0 z ��U'0 dF-- O U W w W z m W W z � W H- m W O Q Z�m2�mQQ �wm Wm m8U Ow JF -Q J JU Q N J D J n- J OUJw m x J H m -iZ U W J z U C7Q�w LLJ T- �Q wQ Oz?V)0 aQ0 JQQ_w Z�cn3wcn wcncn U)V)aV) w C7 r N rl) Q Q Q Q wz wz Q a �o �LLJ JUV) JUV) tQF Yo- - <F- yo- - UmJ OmJ EQL, EQF- mUOc� mo ves J J Q Q Ld Ldz LL)z Q Q �o o !••�NN•N••uN• ••N•N••uu••• JU(n _j -j EQL, EQF- Yn-- Yd- U2J UPJ Q O: <02 mU[O mUM z O 1— Q Q U X Ld Q z Q �N J J Of F- 2 Ln o� zQ :Dw as W U o- w 0Q� 02 W U F- Z W w w 2 N Z U w Z a 0� Q 2 W O F- Z W w W � 2 � J Q w �o F J U V) E Q U m J <0- m C) U) 0:mUUD J Q w a -Z �o F- J O N �Q� UPJ Q0: 0]U co ►.M O �'ii7•Lii::::::i� ••�NUNNN•N• ••.•NNN•u•N• • �- •Y•NNNNN•V NINN•••N•NU •'•uN•u•u•N� �•��:•SSiiS•i:•�:i it •:'iiiiiiS•iiiii �:ii•�iii•SSii! !••�NN•N••uN• ••N•N••uu••• �•!'iiiiiS•iiiiiiiS! �••M••MNNM••. . .................. :I,.n•..5�iiii uo ••N••4 N ••N• �•NN Lu • �•S!�•ii•Siiiiiii•! 4.SS••S' �•; iiliai�i•�•i•�ilii� � :N N•• - u • :............. • - LLJ ,► • •::V.S.�. it •5........ . :I,.n•..5�iiii uo ••N••4 N ••N• �•NN Lu • 4.SS••S' :N N•• ii �iiiii•SiiS• iii:•i:•iiiiS•iS•i :............. • LLJ •1 Of LLJ• )F .- ' LLJ •• U) z 0 North Carolina Department of Environmental Quality Pat McCrory Governor January 8, 2016 Subject: Stream Identification Request To Whom It May Concern: Donald R. van der Vaart Secretary This letter provides the findings of a site visit to Buncombe County Parcel Identification Number 963801516700000 at 2 Perdue Place in Asheville NC conducted on January 8, 2016 to provide a stream determination. The stream feature is shown as a blue line along the northwestern property boundary on the Buncombe County GIS website. The results were as follows: Features Score Comments Geomorphology 14.5 Stream analyzed starting at culvert outfall Hydrology 12.5 Biology 7 Total 34 Determination: Perennial Stream Determination Please contact me if I can be of any further assistance: 828-296-4662 or zan.price@ncderlr.gov . Sincerely, Zan Price, PE Assistant Regional Supervisor Water Quality Regional Operation Section GAWR\WQ\Buncombe\Stream Calls\2 Perdue Place\StreamDetermination_2 Perdue Place.docx Water Quality Regional Operations Section 2090 U.S- Highway 70. Swannanca N C 28778 Phone (828) 296-4500 FAX (828) 299-7043 Internet h2o.enr state nc us An Equal OpporlunitylAffirmative Action Employer 0