Loading...
HomeMy WebLinkAboutNCC243466_Site Plan or Location Map_20241107 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) `Y W_, FOR • TOOLEY HARBOR VERTICAL CONSTRUCTION 1713 RIVER ROAD o _, CITY OF ELIZABETH CITY, COUNTY OF PASQUOTANK, STATE OF NORTH CAROLINA ce W E LATITUDE: 36.278300° N, LONGITUDE: -76.198700° W SWPPP ACTIVE SITE MAP BMP SYMBOLS LIMITS OF DISTURBANCE/ r--, DUMPSTER • FILLED GREEN CIRCLE ,pal yv Intracoastal LL Poin NOTE:SCALES SHOWN W o M --J DASHED BLUE LINE °Hal WaterwayARE FOR 11"X17" PERMITTED AREA . -.r�R�y� \ SHEETS,ADJUST FR ACCORDINGLY FOR o PORTABLE TOILET • FILLED RED CIRCLE ,��i°F \ Z ACTIVE AREA YELLOW FILLED IN AREA 4,FJ 'i; OTHER SIZES. FUEL STORAGE Fs BLACK SQUARE WITH"FS" av J Cottage Point 0 2,0001 4,000 0 DISTURBED AREA YELLOW HATCH \ 0 M SWPPP&SIGN LOCATION swPP BLACK SQUARE WITH"SWPPP" pew-, �' . �� Z STABILIZED AREA GREEN FILLED IN AREA ' 1 4 �, ,` \`f 1 INCH = 2,000 FEET o o<m ``_ h �. UN0ro /4� FLOW DIRECTION BLACK ARROW PARK �� 'd� W .,,- TEMPORARILY STABILIZED AREA ! GREEN HATCH NI � ��diA =N sr aDISCHARGE LOCATION TOr �Ppa6 aEROSION CONTROL BLANKET CROSS RED HATCH ® BLACK CIRCLE WITH"X" y>� a_ ZZ SURFACE WATER OR MS4 <, /�� Forbes R/� Cobb Point CLOSED LOT X BLACK"X" SOIL ROUGHENING 1 BLACK MOUNDS WITH m, .l 4P �A� THORFR° LINE THROUGH CENTER I r o ` SILT FENCE SOLID RED LINE _4 [ P TEMPORARY SEDIMENT TRAP BLACK SQUARE WITH "�► PARHVfEW DR o / : ,w BLACK RECTANGLE � cv° , •II REINFORCED SILT FENCE/ `� u- x x x RED LINE WITH RED X'S BLACK OVAL WITH INNER a� t TEMPORARY SEDIMENT BASIN SB Co0 UfDOUBLE ROW SILT FENCE OVAL WITH"TSB" ° �"` , u I ! V _ '9'O� ° PROJECT AREA €2 FLOATING TURBIDITY CURTAIN SOLID PURPLE LINE TREE PROTECTION - — — — - DASHED GREEN LINE a� r w i O 1 9'rB INLET PROTECTION(GENERAL) 0 FILLED BLUE CIRCLE TEMPORARY DIVERSION DITCH .�4• BLUE LINE WITH ARROWS o o, �• n © Elizabeth 1 M BLACK SOLID PARALLEL LINES u 0 ' I N TEMPORARY DIVERSION BERM — — — City States a STABILIZED CONSTRUCTION BLACK BOX WITH WITH HATCH LINE BETWEEN ( m Q h City State' �[EU ENTRANCE CROSS BLACK HATCH 1Mar ry DEWATERING WELL POINT r o ! ' BLACK BOX WITH •--�--�� BLUE LINE WITH DOTS 1 Q EVT MAT ® STRAIGHT LINES LOCATION �� a p t I I- CONCRETE WASHOUT AREA • BLACK CIRCLE WITH"CWO" DEWATERING OUTFACE Dw Q 0 ® LOCATION ® BLUE CIRCLE WITH"X"&"DW" < p OUTPAK ❑O BLUE SQUARE WITH"O" - - - 110 344 a 1= - �,� DEWATERING PUMP ❑P BLUE SQUARE WITH"P" PLEAsaxrR ;i ^pR ' Ct O uJ Z c8a STOCKPILE SP BROWN PERIMETER WITH"SP" it. e ` �E \ m DEWATERING HOSE/ „sh�.I ' Qo�� Q Z I- STAGING AREA f�� RED HATCH DIRECTION OF FLOW } PINK LINE WITH ARROWS !�F Q K-�-� ,PO GRAND VIEW DR ;� = 0_Q� } w U)NOTE:WHEN A BMP HAS BEEN REMOVED OR IS NO LONGER IN USE,THE SYMBOL WILL BE CROSSED OUT WITH AN'X'AND DATED AS REMOVED. ° U yICKDR�; o� O OO ^ iis,- O0a I°NOTES: yin`' �` ~ LLISHEET INDEX rf— - 1. ALL AREAS WITHIN LIMITS OF CONSTRUCTION WILL BE DISTURBED UNLESS �� 1 1P4pC-1 COVER PAGE OTHERWISE NOTED. s LN �1► p 2. ACTIVE SITE MAP WILL BE UPDATED TO SHOW ALL'IN-PLACE'CONTROLS ANDEC-1 PLANNED BMP MAP-VERTICAL CONSTRUCTION NORTHWEST CURRENT ACTIVITY. REFER TO BELOW ACTIVE MAP SYMBOL LEGEND.THE ACTIVE O Hollows LL. MAP SYMBOLS ARE DESIGNED FOR FIELD USE AND FREQUENT MAP UPDATES.AN X q , Family P WEC-2 PLANNED BMP MAP-VERTICAL CONSTRUCTION SOUTHEAST THROUGH A SYMBOL INDICATES A CONTROL MEASURE THAT HAS BEEN REMOVED. I- - 3. THE GRADING AND DRAINAGE PLAN WAS USED AS THE BASE MAP WHICH SHOWS Z: mo~ LC-1 LOT CONTROL PLAN DETAILS DRAINAGE PATTERNS AND APPROXIMATE SLOPES AND ELEVATIONS ANTICIPATED 5 © r LL, AFTER MAJOR GRADING ACTIVITIES. Q w H o LD-1 TYPICAL LANDSCAPING PLAN 4. REFERENCE THE SITE INSPECTION REPORTS FOR EXACT MAINTENANCE,REPAIR,AND - ° w co ASM ACTIVE SITE MAPS REPLACEMENT DATES. -Y.- ; ��LO Q. OM' a I a N QF, PROJ#: 08-2024 _ `aP DATE: 09/30/2024 SOURCE:DRAINAGE AS-BUILT PLANS DESIGNED BY HYMAN ROBEY,DATED 08/11/2008. -,,, .,- ,� - . , S' ,- n- 1 • DESIGN ENG: KV CHECKED BY: LO PROJECT AREA TO UNDERGO DISTURBANCE ACTIVITIES: -5.4 ACRES C-1 GENERAL EROSION&SEDIMENT CONTROL NOTES: at y9v.g p 3rN v0£Z6a r �i � s d♦- n• , / �j.. / , �"' ISs'"1 2_, a0£'Od f 530.9 f £O-,,t �N \ 81. .i �/ /. 3 1. REFER TO CONSTRUCTION PLANS FOR FULL \ grlrrl0o o'S 93 py \ nN\ „ a� •=•• • �� r� ggs�t=A�N\\ Le VMS l V o CONSTRUCTION DETAILS INCLUDING BENCHMARK. a sNz�o£zge ¢5 y_ 1, I.L. •NI L£'9 qst La3nN\3 W 2. SEQUENCING OF THE PROJECT WILL BE DETERMINED OUTFALL 1: STORM SYSTEM TO t9o9 " • ' =1 N1'nM " 113,Oa ga3^`a ,,j o *,; i �i ' */.I •6'� 69 @n.`-G al dW'9t Og'4s ro g, 1 i 6' 9a1a DURING CONSTRUCTION AND UPDATES CAN BE OBTAINED W°9t -. .,,N1�- / gz01i aroa a3n1' fi tZy5t FROM THE CONSTRUCTION MANAGER. ROADSIDE DITCH TO \ �� oe'S' of gt 3. BMP'S SHOWN ARE PLANNED OR TYPICAL ONLY, PASQUOTANK RIVER \ � �- /—= - S� -"� avo a3n�1>' ca1,vtsN`15� is to INSPECTOR WILL BE REQUIRED TO UPDATE ACTIVE MAPS 150:, -� / tt�ylvo'_"- �,rftoFOR ACTUAL CONDITIONS.REFER TO LC-1 AND LC-2 FOR , / (s4 t)°i '1•NYAN 'CAT: 36.279419° N ��r _-- mow_ 1 (L4 l)Og(l£l)ya 41tINDIVIDUAL LOT CONTROL DETAILS.TYPE'A'LOTS SHOWN ��'� '' � 9£31WITH BACK OF LOT CONTROLS MARK THE PROJECT LONG: 76.198117 W q.Nln ( °gpz69t y.trvp'N Z J• p9' ON) Oti dd Oa 1 nN QBOUNDARY. / / 1v15N11 Ot,�1��1 ,::a •S.n3'13 Cgia, Ogq.N'L o z.........\ 4. UPLAND WETLAND BUFFERS WILL BE IDENTIFIED AND / ``((\ �.., d tN0 (0 (0) _ N (7'-t'� ` 1 a0N0 91PROTECTED TO PREVENT ENCROACHMENT DURING SITE / / �� ,� es., na1las"1 y0µ)1 ` ``�1 ® 1 itgnµ1 ` °Ce` woCLEARING.ALL UPLAND BUFFERS ARE TO REMAIN NATURAL /� . ' Op.9' "1 San 1g dW \�1i�1/ (aS'y}°S 9'"\�"` at Iq`HAND UNDISTURBED. / i • S9'9.3„M 3*LOVOa 63N .04 .'IgVG ,001Mt�_ \/' \ (ZLy 5t Bt :; 15. CONSTRUCTION AND DISTURBANCE OF THE GROUND WILL �� r ` "` 9a o��no ►(':'.+' 1 0 / +azBE CONFINED TO THE LIMITS OF CONSTRUCTION AND THE 0 anion 00' 7 ,` '�/ / .n313 C6 3 q'S)09q g..' •• �LOTS WITHIN THE PERMITTED AREA.ANY UNEXPECTED • q69'gd 9 O £ s)gC / r, . •,. \ DISTURBANCE OUTSIDE THE PERMITTED AREA WILL / // 1a3n O 9t \ ►= +LL N., . ` d9a 1 ` n" g6. / 1 REQUIRE STABILIZATION EFFORTS AND POSSIBLE llq to y)ot►` y /. y' nN NN` (ZL' •n313 OL N MODIFICATION TO THE PERMIT. 1£'y)°ya9'y °C" y)p£'y'lµrnN pq't` N1 9a' 9 w 69'y) (OL (9t OCy' i` (ta Zi +t"�l gq 9)OL g. n31110M r a 6. ADDITIONAL BMPS MAY BE REQUIRED PER THE DETAILS OR �� I (! 1 » St 31 / (S9'y) (St) P 1 9t'9gs y •nN111, l oL' ISO .yy5 o M NARRATIVE.ADDITIONAL BMP INSTALLATION AND Z1 I P O I" (y 061.pa',ill t +5z)y£5 a3%�NN1ds o dYp• r 9'V) 3 LZ MAINTENANCE SPECIFICATION SHEETS ARE ATTACHED TO �P '�A Ltt 1, f�..•10\' ?� (se 0gLy.31 NN\ds _ p a ` \ THE CBMPP NARRATIVE. ' IV j5• 0 co y)Ol! 13 Ol N Ls '� o O 7. SILT FENCE IS DEPICTED IN THE PLANNED BMP SHEETS \ `� A'•(� t3t3 no t + •N tl g9 L N\gat0 (£t9)tta, ,3p-' z FOR PERIMETER CONTROLS,LOT CONTROLS,AND .6, a) -2 L�Vs SG,IL y a gqy)�y�13 a> Z'}8Z9 Sao 1�`' 90 g 5 a3a"µ1 app St FROM SENSITIVE PROTECTI N OLOCATIONS. EIN REINFORCED OR AREAS ADJACENT TO AND GRADIENT a Q Dfa 64'a"`3,vMs t0'9y •N30 `y0 1 il SgNZ 0tl1 �vM ' o r p p0 yt © ce DOUBLE-ROW SILT FENCE,FILTRATION BARRIER FENCE OR Bp z3oav a3n to 1a0 voN TJ y. n rn 1 ; ' �' 0 (otr5)o£s�at op,- OTHER COMPARABLE BMPS ARE ACCEPTABLE AND WILL BE 7 w o REFLECTED ON THE ACTIVE SITE MAP. "1 Nla �' ' W. �Y d at�' �/ CL ^J N 8. TURBIDITY BARRIERS ARE RECOMMENDED AT STORM g9 i "�— ' 1 K gt6'gt © •.�,1 1'I z o DRAIN END SECTIONS ONCE STORMWATER MANAGEMENT pi R (y9•y) z= ^ FACILITY IS IN PLACE AND OPERATIONAL AND WILL BE ' �„5t (oL'9)p9 a � HO," �� y6 " j''• �► ('j0a)r1. 'qv.�£NNI� - J -o� REFLECTED ON THE ACTIVE SITE MAP •� 09' tM • is .\ n 3 •9..n33 c - - a 9. CONCRETE WASHOUT AREA WILL BE DETERMINED IN THE ' '� +tp 9t' gto voN3o , o9's�H oi�nW H I o O FIELD.THE CONCRETE WASHOUT NEEDS TO BE INSTALLED ' IC' N1•- nT13 PRIOR TO PLACING ANY CONCRETE ON THE SITE. •n31' - 61 3nN`Ho110 [ tt - ADEQUATE SIGNAGE SHALL BE PLACED ON SITE TO i,—, 0c9)(1 gN01H 9a* 6 ® „ 3 IDENTIFY THE LOCATION OF THE CONCRETE WASHOUT. 10. ONCE CURB&GUTTER AND ROADS HAVE BEEN INSTALLED, 3 9yg5t 11 +Z<<t I £6 �' 6Co'gl • TERIM STABILIZATION EFFORTS WILL BE TAKEN. a3^N 3w - O ' �£ �. !s® y.•np1 , SEED/MULCH,VEGETATED BUFFER STRIPS OR OTHER .t n3�3 a1 (oty)Lts n313�� COMPARABLE STABILIZATION EFFORT WILL BE ' WWI mamaw y 5 . f .-.�°' - , oeea �H gano 11 .oa)°Zt Lrttyevt 9 oc ` _ ' V / IMPLEMENTED ON DEVELOPED LOTS UNTIL VERTICAL £C�10 H' £a' td tN N 5i qd \" / g ' c 9L ro t9'v t z N "J Q CONSTRUCTION BEGINS. ' — . ' 6£ 1r+6'as ' 11. ONCE DRAINAGE EASEMENTS ARE STABILIZE/LANDSCAPED, ,' , gt — V OR IF THEY HAD BEEN DURING LAND DEVELOPMENT, " , RECOMMEND INSTALLING SILT FENCE ALONG SWALE LINE t p00gt till �3 of OF REAR DRAINING LOTS.REFER TO ACTIVE SITE MAP FOR 5/ 4:1) . •Lr0 �N\ I P •n s 4)oa'a'HO+H gano � � � : �•0+z do s Yz£° °°+\ H ch CURRENT SITE CONDITIONS 13 0°° , y)99 N1 ' g)y1'9.9+9 ,0 y6 60d0 N n3 'OC !S 9l S' BZ 90' IC9 12. LAND DEVELOPMENT BMPS WILL REMAIN IN PLACE UNTIL \ 99'9 5 µ\g3 is ga 1 82 ( (tg'y)Zw0•yt 31 ( ,vM y15p„„„...401,_....,,, -.—.—.—.—mwm.. w dM • d nN1 LZ28+VON' f`A--ir 00.0\AREAS MEET STABILIZATION REQUIREMENTS OR UNTIL NM • i y)zo'S` of 3Na0 gLw M TN\ yEy•,M nN1 oS'9 M gtic10 j VERTICAL CONSTRUCTION ON LOTS BEGINS. C��g.'/ getY3 0 stir.y)L9'y 9t y+ N\ Zt�,y)q�y 91 d�ttt 1NOd 110 i 13. VEHICLE TRACKING DURING HOME CONSTRUCTION MAY (609)0 q•+yoN J ��' ' "- , ,3• y0 I „i C°L dtq�.yl eLgn3 3n°? (g dWo Q LIMIT AS FCONSIST OF AN ACCESS POINT EW ACCESS POINTS SITH STREET POSSIBLE PAVED PING. 11 ` I P tL••.'• q. ' t .013 vl - 8 (q0g)p6 14 N1N3Ziv Oz H ROADWAY PARKING IS RECOMMENDED.MEASURES WILL BE nN1 9a9:qy+S n\vs o �vM Z O MAINTAINED AND MONITORED REGULARLY FOR ` / pO+L I P t)9a".n513 of ,vM1 -.133 o a sl !s pp05 _O EFFECTIVENESS. `�c�� �__ �k °t N LAN\1321 Li.VM"3211W II v !S°C°St !$CD g6 14. ADDITIONAL GOOD HOUSEKEEPING PRACTICES(PORTABLE t£ q£'9sa ypN3° P ' !s taz ® TOILETS,DUMPSTERS)WILL BE IMPLEMENTED ` r<kvo 041► y'" nw $ 9a' N1 ill i, L(b M (B 0' U THROUGHOUT CONSTRUCTION AND WILL BE REFLECTED fir. , CzLy),y)g6'y't Al aG 9ty)pass.N\'ngt nNl O ~ Z N ON THE ACTIVE SITE MAP. 3o,�n0 >5 q (9L 00 Si „to (6£'S) 0 09•01 6 .0-0 °�s, vn (n — ovs- ;3a\p Ol ii O9'9' OL d 1 $ yl 6' ano 53j t m W 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SWEEPING of°�Wpad t ® g•'n3 galq (es'S) n313 I P yno �" o\H g \ i 0 Z a2\W mad a00 g'9) µ01H ££. p1 131 1 9 tqy)q9y V'"1 nNt m 4t.6 n3�� g 1N1pd H ' W� y �,i Q O Z AND CLEAN UP OF ALL PAVED AREAS SURROUNDING THE o35pd° 03gr 1 (£ d al N s PROJECT AS NEEDED WHEN SEDIMENT AND OTHER tvw`*n vot R£01 ) I a£ 06'' voN30 ((ZLy) 91 31 gy NOd \ 9an A p 0 CCH MATERIALS ARE TRACKED OR DISCHARGED ONTO THEM. "s 1 _— o j,;j ao v)00'9` �" W Q 18. STABILIZATION PRACTICES ARE EXPECTED TO OCCUR AT ' n�3 6+'9_ Hnl ( Op9` n3� J 0 0 W ALL DISTURBED AREAS WITHIN THE LIMITS OF _ r• �,yn�n la Nroa L N�lo1, 4<< N�3g Ia�N\ l£Zs}of }et y 0 ~ I > g9 µl Hal\° �3 CONSTRUCTION AND WILL BE REFLECTED ON THE ACTIVE �Ogt I (tyy) 3 1�Hy9M Ho11° ' hats "" O p SITE MAP.WHERE APPLICABLE,A VEGETATIVE COVER WITH I e)qa9 M 9an I ' pp0�t W p A DENSITY OF AT LEAST 85%SHALL BE ESTABLISHED. s ZgySt 7 I P (6V 131+t ry1 > W ,nN, I t3n9\°.VON _S m nN\ f'p[05t 00 Y REFER TO LD-1 FOR THE GENERAL LANDSCAPE PLAN. [z ' 78 E S}b>'Sn313 os '4IA' H1W' t a ' of Q 2C! is zE0 S' 3t+isavie >y o tip:,°t 8 Z®t t 31 11 ° 4C 1b 00 -41.5 1111 PLANNED BMP LEGEND © \ap �'/ '�I P61S)°Eos�"j9`Z �� � � 3� ' ' [ ' (g£S T. yt 09� nd rqM ' n m O PERMITTED AREA/ 3 / oo.y= nN1 1s'9£+6 nvs ' �� // y)6s'►`3 of £ ino nN ng13 0 LU r nNt I 0s) 1N10 4LS G t, LIMITS OF DISTURBANCE 4'N1 11° 1 ' ,r'` sad\apz 9£'y �\ nN\• • G ova Sa0•yls • �N of n31 £)Ly N\ e' w NOTE:SCALES SHOWN j '/ dWo ct 31 ' (q(,3-,. _t qyt n' 6 o�v5ivis OP" t�cG�tp�S9'' 61.)qb " ay�(6�0y V)aw;at 31 9tZ N S9 1H .• z Q SILT FENCE OR COMPARABLE ARE FOR 11'X17" 15 tl °g dw 89�yn313tita \`P"„3.Nrod µ 16 oy v' ►� Z w • IP INLET PROTECTION SHEETS,ADJUST ✓ _ ao't n a Iw 131N+t tl1s I IP J� W ¢ ~ N ACCORDINGLY FOR 3 + �.q. n m 6g91roSAVl 1,0 .\ o ® PROJECT OUTFALL OTHER SIZES. ty7i 6. n31.vL 8I(6s'a) d NOM 9a it 3na0 g)os'a" 9an0n� iy t "^?r- °°*L w N z1.g)0 o.yy+5 1NW �(Z9 10d µ°M 3-' „+8 ..- a rn a SURFACE FLOW DIRECTION Q �QQ 200 3n�ao+op'vls / I ° tN _ L IP PROJ#: 08-2024 Op°� v- 1 1£'I ,o ty. ^\� ,n3�3 DATE: 09/30/2024 S...,' STREET SWEEPING T. i 3 `r a, �. -- 3� i ,' ,7 0/ ..r,', •'"'r afi 9g9 iH gana DESIGN ENG: KV _ .1.n ir y "TS Y+90 - y 89y .M nN Ic4,t y '(y d 1 CHECKED BY: LO (b°' 8£y9•y•"1 Bli - - � k 10y aL'i g1 9Z 0. v- N10 1 INCH = 100 FEET 0,- x as�1 , ,___3eois Y,e° : t . y)am- d - EC-1 o GENERAL EROSION&SEDIMENT CONTROL NOTES: a dv,�� Mp �,° n °D'y e'dL' 6 cai a �' ^axti?�ti� £o s •♦yx6.��.as �a 1. REFER TO CONSTRUCTION PLANS FOR FULL I ti*d' 69 ° °y°` `a' ` \ \ ARE SCALES SHOWN Z J `,N 06`\+k so"�'' j5 0 ♦r'4* �� "+l� °•b°�,•1d j5 4t \ ARE FOR 11 JUST C9 O CONSTRUCTION DETAILS INCLUDING BENCHMARK. p 5� t -- c' p SHEETS,ADJUST w +u • t 5�'� 5t ,�' `� ACCORDINGLY FOR 2. SEQUENCING OF THE PROJECT WILL BE DETERMINED 0405 �6 av`° �a` r� \ \ OTHER SIZES. DURING CONSTRUCTION AND UPDATES CAN BE OBTAINED \ m " 0 \ °m-A- �P . ` `� FROM THE CONSTRUCTION MANAGER. $ 8 i, vac♦P'°y t m�O�4� �'rpN� 1 00 200 3. BMP'S SHOWN ARE PLANNED OR TYPICAL ONLY, o -- 5°�,y�xb� L-�-)1'�'• t m s�4,, �\ _ INSPECTOR WILL BE REQUIRED TO UPDATE ACTIVE MAPS 1.1 , ti°l o`'�°�' k , ,°"t,S,a, a� p09'6 14°.1d°v• FOR ACTUAL CONDITIONS.REFER TO LC-1 AND LC-2 FOR g4q ¢ ' • n3>` ,1,-- qt .'pay \ \ M INDIVIDUAL LOT CONTROL DETAILS.TYPE'A'LOTS SHOWN ♦�'�° ^ ® i' !/ Sr°`i�\ �Z • vyt•,gyp°•.s ® 1 INCH = 100 FEET WITH BACK OF LOT CONTROLS MARK THE PROJECT °°�'61*° vti,v" b♦ 'y �� 3" °ate,�N`��**' \ \ Z J BOUNDARY. L*d r 9' / ' °l°rrp°s o z_ 4. UPLAND WETLAND BUFFERS WILL BE IDENTIFIED AND 1> '4t �C° 4,,,,:, \ o PROTECTED TO PREVENT ENCROACHMENT DURING SITE �. i5 ^ t t y� n \ \ p CLEARING.ALL UPLAND BUFFERS ARE TO REMAIN NATURAL / '3 ` t y bt yc�,•� AND UNDISTURBED. qt n\°S° ` S3 1 tl� °® ♦� 0 5. CONSTRUCTION N AND DISTURBANCE CE OF THE UCT ON AND WILL AZD ryb,� 1,�y\°' oe °°°��c yi;t,t, tgl 'cP° `� \ OUTFACE 2: DETENTION POND TO BE 6� '6 ♦ ♦ °� ���°� °�� \ UNNAMED TRIBUTARY OF LOTS WITHIN THE PERMITTED AREA.ANY UNEXPECTED ty° ✓ O �p��a1 °� " / S. .1•�yt 1 '� a,.DISTURBANCE OUTSIDE THE PERMITTED AREA WILL yl ` ♦i`p °� / °tit•tl °'1'" .. \ PASQUOTANK RIVER REQUIRE STABILIZATION EFFORTS AND POSSIBLE t y\o.nj^,' Z j •�� t�y�b .°* ��o• \ \ \ oMODIFICATION TO THE PERMIT. q♦vv'? ♦ ,,' G ) ♦ oy e. ° a CAT' 36.277783 N w o6. ADDITIONAL BMPS MAY BE REQUIRED PER THE DETAILS OR 9ST�"ate\P :l )1 �k/ ' vl°rr' °a�ys `°r �, 6t bp°�y`'�*� \ LONG: 76.191581 W aNARRATIVE.ADDITIONAL BMP INSTALLATION AND a��/ �� �o"°�� y.5r�, d , w ® r \\ rnMAINTENANCE SPECIFICATION SHEETS ARE ATTACHED TO *. ' / 6�l °dpr� ° ,' ,�gypatri o KO THECBMPPNARRATIVE. � °♦`"V'S`' 'SG ' ♦'40 \ �Q Y� ♦.t°ex\, ,40 S $ tl\4t,# z7. SILT FENCE IS DEPICTED IN THE PLANNED BMP SHEETS 3`' f0 49, Q` c% '' \ ' - �P ,.e'C,.�yS � ps� yid y s ` \ ` \ \ o PROTECTION FOR TER FOR AREAS ADJACENTLS,LOT ONTROLS,AND TO AND UPGRADIENT °♦ e d8+`' C 9°°y �' � ` �' t" dy yt `11°� t ��v °'` CI y x s pr i °r \ FROM SENSITIVE LOCATIONS.REINFORCED OR �� w q°l�' �0 sx�C'dd '� `�� 5' �,• t`� 1' 5,Z� �'��1 \ 9tP a o DOUBLE-ROW SILT FENCE,FILTRATION BARRIER FENCE OR • r�a1 1 SS���" �I♦ yc* ',a ® lea °m e��° bt l�G\ J 00 OTHER COMPARABLE BMPS ARE ACCEPTABLE AND WILL BE ���° t r0•4•6 $ r,♦�� ♦ °' °°o°° °� \ ' �-' D C o REFLECTED ON THE ACTIVE SITE MAP. % °r ,�� ;p rl•r� r °� ♦ �� dy l6��t 1\ q y m,_w N 8. TURBIDITY BARRIERS ARE RECOMMENDED AT STORM r p ♦ oy ♦•t.n0 154 °rl°+r m ,t \\ t lit t• Y�x°`'�a`� ll M\ 2 a w N °�,, .` r ,gyp t\p 4 4 ° <°o\ q05 l°e! jO�d o F\ Z r o-- DRAIN END SECTIONS ONCE STORMWATER MANAGEMENT y�r�rl'+ ��°,' s�dyss cA!,�✓' r1 6 rti° 0 yam' m.� •. \ \ W=Z a_ L,0.3 a .° •x\ dy,, °l `°l °y is O l \ FACILITY IS IN PLACE AND OPERATIONAL AND WILL BE • i 9 �'yI REFLECTED ON THE ACTIVE SITE MAP l6t'Ll %PAN �ti9 i l °#.>° ° a yt \� d \�9 � \ \ \ o a 9. CONCRETE WASHOUT AREA WILL BE DETERMINED IN THE t °� > 5� y�' bt y�\ o FIELD.THE CONCRETE WASHOUT NEEDS TO BE INSTALLED s` 35 Q �� , \ a PRIOR TO PLACING ANY CONCRETE ON THE SITE. / ` :004.10,0 •A. (4p t` ` \cP \ ADEQUATE SIGNAGE SHALL BE PLACED ON SITE TO ® ♦y P` 0- IDENTIFY THE LOCATION OF THE CONCRETE WASHOUT. L nd\ v. ��rob}t�r \ . 10. ONCE CURB&GUTTER AND ROADS HAVE BEEN INSTALLED, owl --') .10,..\P r gip. �♦.(�joy , a �a\ so. It l°ot,COtl • • \\ \ a INLET PROTECTIONS WILL NEED TO BE INSTALLED AND m'�\°:d1 S 00° ' °!Al' • �5 5 5 \ (--- 1,,, INTERIM STABILIZATION EFFORTS WILL BE TAKEN. o°op0�v�°x`ytd pea, ' ♦ Y' 4,y°,•t`'�•dLs 0 \ \- SEED/MULCH,VEGETATED BUFFER STRIPS OR OTHER °p°�St o1,^� `rv�pt t1\'cP%y `'`W s\�, r \ *' et \ E C o COMPARABLE STABILIZATION EFFORT WILL BE �� ',T co' e o°.• 1`'dtt•S ,��r� „ .0..1..��,�. fir,�© '‘`.'N. \ \ [ ' E IMPLEMENTED ON DEVELOPED LOTS UNTIL VERTICAL �m ♦�;\°1 P 69 p�� > 1l N` d Z ♦D \ V / 2 CONSTRUCTION BEGINS. 6°aPr '� tag �.ty�y'P�tc ♦ °°' `0°y°tv�'r��aP�= ti5e \ \11. ONCE DRAINAGE EASEMENTS ARE STABILIZE/LANDSCAPED, �``41at:°0°°t��° ti °e Vos � yqt °)sa°,A`� \\..°� Syro��'` •r?�� \ wOR IF THEY HAD BEEN DURING LAND DEVELOPMENT, 4a" I All 01erl,� p' tt tt sa yd`°a y ,y�°�t\'go` \ RECOMMEND INSTALLING SILT FENCE ALONG SWALE LINE ¶ gel tt` ' •, . 11s a 66 ` 35 ® °° 4•tiv S `?°-`i • \ OF REAR DRAINING LOTS.REFER TO ACTIVE SITE MAP FOR 61 .: 11 .. o fi O • t4i),51 °'fl•' '8. \ \ I- m CURRENT SITE CONDITIONS .61. l 9t ".�^''�. ," �a�• r cN 12. LAND DEVELOPMENT BMPS WILL REMAIN IN PLACE UNTIL .0. I I j5 6 `sga�°♦y x�� +� , ,ytO�a��1r W Q AREAS MEET STABILIZATION REQUIREMENTS OR UNTIL t'''t\'�°' °�(,� °•°°s 1 , l q�, 4 ,ym oil _ VERTICAL CONSTRUCTION ON LOTS BEGINS. a�IN tto }+� N 9 , /j t •t(. �41 Si I ° Z 13. VEHICLE TRACKING DURING HOME CONSTRUCTION MAY o , ��\`Let. • \ \ O Q CONSIST OF AN ACCESS POINT WITH STREET SWEEPING. 0 6t \ LIMIT AS FEW ACCESS POINTS AS POSSIBLE.PAVED r�\ �t PP yt` N j5 V� \ °o�p�� H ROADWAY PARKING IS RECOMMENDED.MEASURES WILL BE a0y° t•5t a� tt• S ® ♦'boy 1•o��5°� \\ Z O MAINTAINED AND MONITORED REGULARLY FOR '� �a a`�) 1 rC, �W es:. r 1 O J �\ d r�\• qt yc�� L NA 4'•#$0- ys 0' .s� p EFFECTIVENESS. tkc,` . o°•\a° 850 r y,°�•,• y gc'1e♦y^•.6 "4 - at` m,3• \\ 0 14. ADDITIONAL GOOD HOUSEKEEPING PRACTICES(PORTABLE \. m •a �I 3' ©tool°0 e� ` a°�Syv 1�ap�J• ✓ ���r•N�°� s \ TOILETS,DUMPSTERS)WILL BE IMPLEMENTED l�'�°er a+'' 1 ,," c�° ° yS`x�` S • \ \ U THROUGHOUT CONSTRUCTION AND WILL BE REFLECTED • 9'et o°a w```� �S 's \ c ON THE ACTIVE SITE MAP. ♦'°,'' is 59 •c,,1' O Qt /Z l°,:0 • \ \ 0 (q Z cV 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SWEEPING 'n.�` \ ,•��y U' l po'°Zp\� 09 ;5�pt s�` �.°' 1 Z AND CLEAN UP OF ALL PAVED AREAS SURROUNDING THE ,.\-, t t a:4.1% ys` o Lee°x' 0.0t r i0 6 a��' \ , 1 = U 0 PROJECT AS NEEDED WHEN SEDIMENT AND OTHER C�^ �•09 l�-5) y��`^�S .. �5 b a\� p 1 J H (n MATERIALS ARE TRACKED OR DISCHARGED ONTO THEM. y bty5t fi a► 0°l�°q 44° i�s`t° n,3 C� yaoa °\ �� --�.. v�cP®N°+fsy P „ \ \ W U O_ W 16. STABILIZATION PRACTICES ARE EXPECTED TO OCCUR AT o ' t ALL DISTURBED AREAS WITHIN THE LIMITS OF ll `'°yam v��``oa ��°oe°t 6x�� \t .ne` N N \ O I- CONSTRUCTION AND WILL BE REFLECTED ON THE ACTIVE a ♦ y\o • �„ �- � •pS o �\�°� 1°`'v f Oaf .`'% - '. \ 0 Q Q' SITE MAP.WHERE APPLICABLE,A VEGETATIVE COVER WITH N. t-1,�p\\ �� titi°e`�°y ,. ogv'°A. ♦'S° $ AI +' \\\ ~ >Da 0 A DENSITY OF AT LEAST 85%SHALL BE ESTABLISHED. yeti y� e0.1 s'40 g AAA \ Y REFER TO LD-1 FOR THE GENERAL LANDSCAPE PLAN. Itl\ .' tS° a // \ Q Q PLANNED BMP LEGEND 4 - �t �� +s°� �,''� y�'�°9ti °�� � �t °° vs�-. °' '��� DETENTION \ , etr i5 qb ♦y°` r°1 r♦♦a ,5t t9 �� .° , dy % oe .' O #' q4 l°Lp"v1° el_pl0°,rp OC " 9 t-'�.�(a ., °gv..A.A AS e°1 CO i s. / l�45;), POND 0 W PERMITTED AREA/ �c'l�tl tilt'° L °O y.04`.#.,•y17: ,1•°m'sla.,,6��as ly p\l�e LIMITS OF DISTURBANCE ' y. �xj, a cP r d ,C • �\ tL � SILT FENCE OR COMPARABLE •%a' ��0,* °yt.50.30 yl�i[��a\°')d - ♦' ^• �x�� yA� h°�°O ,, , oc, Z wL m .� . a)•pe ®�`°�'-ay. 1p°0t' • vx°` ^;"'•g 'A,'P•d �9 v• \'' F IP INLET PROTECTION tet• . 6�v0 ' ° �` se °y s s�/ev g'y s° l� �e" °C� ♦ �N c�, ♦ a°y °l`� °` .a` °°es2�' �ep�l °,1�M�y°l t td��ti� ♦ycA0 r�� a , w® a ° ,,,Adp �50�` 1t4. a,„ ,„,`p° rp*d1DA, ° y ` 1 ♦°S\ �/ PROJECT OUTFACE d�1le vM° yt y,�3 ° c i �� a n a 9r gt► 01 4y. .�� g Y9£'0 .�; til A SURFACE FLOW DIRECTION 0/2024 .1,‘ ex o� e °♦y ix �y t'y°°`'��t �� ‘Wil -�_�� +- - �►�'�e'a (x0is* :\ PROD#: 008-2024 ass; STREET SWEEPING yt�� c�) .1..a 1 1 t o 1 7 _+-�- ' 1+ , �a��\� DATE s/3KV �iS'4 r ° ! ` °Oy ^ 1�- 00 _ a • ,� DESIGN D BY LO O :�r t 1 • 1 •1 \ ° ♦ .°• ♦ fin` a (664 CHECKED BY: LO,Cl_ 1-' p°cll1ar� .g 1111111, � -.. � �,� +s ��.i.E9_�-�� _ °6'. " :fib ' i //_/L''"�.1✓iill EC-2 O > U O O. . W J (I) _1 Z < O Z 0 "C" „D E„ F„ „G H • o 119 > .•. c w 0 0 M > > < < % , , �[ J� 0 0 n HOUSE ^ HOUSE > HOUSE HOUSE < HOUSE \� �/ HOUSE HOUSE HOUSE v N/ �/ co N W •• - 1_, OZ T O 1 •• ••1 •/1 • ' NE LU .�/ /• j • •••. j 1:::„:„:. w W(j a7R/W I . L rrr . 1a1 < 1 I . .I 1 ' LI , . OO QOd M. a z C&G r ElmIEI ElatI dmIEI IE1=1EI Im1=I timIEI --- ElmiEl .- ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY $ EDGE OF CURB Notes: o 011 CURB INLET 1 . If needed, Tree Protection fencing should be installed along the buffer zone, wetland boundary and/or around V '1 -2� protected trees, providing a radius of at least 1 .25 feet for each inch of trunk diameter. -�Q LEGEND 2. Install Silt Fence on the low elevation sides of each lot. Install Silt Fence outlets shown on schematic/diagram and N field adjusted, if necessary, for placement at low points. If lots are contiguous and have different land owners or N FLOW DIRECTION < builders, each lot should have individual Silt Fences. 3. Install required Silt Fence within 10 feet of property line to ensure there is no conflict with septic system. It is the Q SILT FENCE responsibility of the builder to ensure the installation of sediment control measures does not impact the septic o SILT FENCE OUTLET system and repair area(s). 0 CONSTRUCTION ENTRANCE •;•;• ;•;•;• 4. At least one Construction Entrance/Exit is to be installed per lot. w CURB INLET 5. Waste bins and other areas dedicated for managing building material waste shall be at least 50 feet away from Q Z LU storm drain inlets or drainage ditches unless it can be shown that no other alternative exists. If this separation = eL ° co >- _1CY cannot be achieved, these areas must be contained behind Silt Fence. w ° ° 6. Inlets downstream of disturbances should be protected; streets should be swept when sediment from the ° o o w construction activity is present. < o 7. Details for Silt Fence, Silt Fence Outlets, Construction Entrances and other measures are provided on additional J a sheets. Erosion and sediment control details are not drawn to scale. w H- w w SOURCE:NORTH CAROLINA DEPARTMENT ~ ~ w F - O OF ENVIRONMENTAL QUALITY TYPICAL INDIVIDUAL LOT LAYOUT WITH CURB AND GUTTER cC = w N a cn a EFFECTIVE DATE:11/12/2020 PROJ#: 08-2024 DATE: 09/30/2024 DESIGN ENG: KV CHECKED BY: LO LC-1 c U Y U O W J TYPICAL LANDSCAPING PLAN - FULL LOT LANDSCAPING (SINGLE-FAMILY RESIDENTIAL LOT) (O J Z Q O Z }rrLF O - PATIO - • M 0 Zo -�- '4' U re N W O(7 O cv W Lo U 7 HOUSE W I- �cnoo _moo- U U a wa w o a • in • ••v • X =8 . . 0.......'1::.:: .;:.):', ': '' ,r N ..:?.:::'ic;Y:f;; '`:z:;.;WALK j CURB&GUTTER Z STREET 0 Z J Q 0 o z Z N m < Z I- Q Q O D Ce PRIVACY FENCE . LANDSCAPING i FLOW DIRECTION 0 TREE//BUSHES ETC. _1 < I O p ~ U w Y >- J I— 0 CMS ENVIRONMENTAL SOLUTIONS,LLC O 5051 PEACHTREE CORNERS CIRCLELL SUITE 200 C M Environmental Solutions w NORCROSS,GA 30092 ENVIRONMENTAL COMPLIANCE MADE SIMPLE ~ P:(407)488 7913 WWW.CMSENVIRO.COM L o w w N w cc co ° = w N a_ w a PROJ#: 08-2024 DATE: 09/30/2024 DESIGN ENG: KV CHECKED BY: LO LD-1 U ..4 a N F�' 9 4,, 410 d. I ' OUTFALL 1: STORM`4SYSTEM TO 4 , \ \ R=� �� �� ROADSIDE DITCH TO 4© 4, _ ' \. vv 4'a�` ,,'���%34,. PASQUOTANK RIVER ,,t„; v. A v vv 44sv k� �a,� . . LAT: 36.279419 N \ \. . A�,. `k a6', `�� LONG: 76.198117 W ti�q. A � \ l'uc o 4 ' ,f • N,,,,'-'4' le" ,/p. .,,, * liiiioot „+ N. c /,' .., ,,,,,• -• t, * .' , „.! ' \•*,•-'' '' .4 a��a° sue $:1 ,.' -'-' -8. 4S© p F£9 \a/ \ \ N"' , I �C S \ // c/k B �Y \ .pfi \ y �j_ p \ \ Q O 4 49a� r /4'� / '��� 4diti \�� Ni, ~� ��� 40.® �\ \� Ark �{Je." \ \ rn ,. if°4°,„/ • ''','''..4' /4.:4/ i ',,,. 4 • :.- ,. 4,," . ' t 0 • \ . ' 40; ....: '' \14''f 41-:: ' // /� &4 04 •• :,'",...,',„x.‘,...,./.. / f,,,:,,,,,. 8`ti �� \\\\ OUTFACE 2: DETENTION POND TO W o 46 `�'� ;®e `: e r A�o��y \S . \\ \ UNNAMED TRIBUTARY OF Z $q�4 /// // / ��m+s% 4 ® ` 4�® P*A,'. ,:F e' • \� \9s\ PASQUOTANK RIVER oaq o co / / s y y 4 ® \ \ \ wwcna / 40 4d31 .f. \, \ \ \ LAT: 36.277783° N rem o Y ��� '" 4 O F ' s4� \ \G\ LONG: 76.191581 WOw Q Wa q , .N, e / •� , derby 430 °"a :��'a: �` �' \ v '�.� d"e d;°i ...� .,�'A.,''- / '- ...0• --Is__ °b i / o'.ih; 0 e =4 A ` , 4ieN -,,. / . 4'4 . ti mod, . tere r',',,v,,,0 , / ,% \ ,,..,,, s , , ,49,,.i, 900 \ \\ �,f,i '\ \k, ' 110.( „a V og ` ti \ / �/ W oy�; 0y�4ar�b°` �.vA s b; � s `�y� (7::::41:14,111:+0'4'0'' 4� 4 e �s �� 751114 • \ \\\\ WCgdV: •/, / �\ ` .P;`�e;.i' ` 4°' `• \.., . ,r:,.,:: \ \ \ Nh� �82 Fps �• \ / 4 ® M '`, ,ram ,•i4�0�s \ y �4:-f,_ .,': s4 �� ,d " \ \ \ > ',t ,e,v`' 0`#,0 \ \ - \ 1,1:14,1),-; aJ� , q86°" '°top, ��� , `olr , \ • C *ii () ~ ;::::;:'',"..'"-/ °):\ 8;. �r �'�c \ ��F 8da� 8"s.88�� 4ff DETENTI N \ \, s"4�'q Cj oc\i A --' 0 0 itk /11 �'� ��• �/ z. POND ♦ 1 Qz0 9 4`�,, �¢as s� 4 ©yam® /i ��' Wa • W O W 4 ® ti° klee .. 4�� 1F .'\ dd„¢gF �e' y, `'�� ,, �„ / ,da , O Q-' i. kA , 40.0 Q`� / I— Q p ea' 4 0 A..�c e'� ); ''• AAA l"sA�A a""ae / .= \\\\ /> / y`�� • •° ` s�. 4 O r s°: � lq a s J • * w ,�,� ,. ;bbp ..� 4 © dA�, Ilk 11\8: 'q��0't'`b� ~e� 4 �s� ,fin . / /• O •8•7 W 4``4`y°y0s/ \\ 5 •i \ 44'4Le 5�4. �y� © 7�..:' NOTE:SCALES SHOWN NOTES: a`0 \� e 4 �q a� 8, .�.a%),Ar.---- `�4�' • 4® / —� r "'� t w ARE FOR 11"X17" 49V. 1. REFER TO C-1 FOR ACTIVE SITE MAP NOTES AND LEGEND. 4 ., S • '4 e, y'�o y(� i-ir:- 6' �g • �� W W N SHEETS,ADJUST 2. IT IS THE PERMITTEE S RESPONSIBILITY TO ADJUST OR •�,A ''...S.,, ., ' \ &°` �� / 4 ® es9 = w N A ACCORDINGLY FOR REMOVE INLET PROTECTIONS AS NECESSARY PRIOR TO 4,�� '` '�' ` '�° . / • a CO a A. OTHER SIZES. LARGE RAIN EVENTS THAT MAY EXCEED THE NORMAL a y ?y d e¢ 4°0 '� }�' PROJ#: 08-2024 0 150 300 CAPACITY OF THE INLET PROTECTION TO PREVENT ,B,`q `c" y S°` t l�� ,r i 4 ® 4. ' DATE: 09/30/2024 FLOODING AND POTENTIAL PROPERTY DAMAGE. J \ r. /` 0 0 'v.R0 DESIGN ENG: KV 3. REFERENCE THE SITE INSPECTION REPORTS FOR EXACT 4'¢Q '.�y.8d H� 8 y CHECKED BY: LO MAINTENANCE,REPAIR,AND REPLACEMENT DATES. „rs„ b< 1.. k� \ 4sy,,,, y` 1 INCH = 150 FEET 4. REFERENCE NOI MAP FOR LOT TAKEDOWN INFORMATION. .- Ai) '00,4q� 5 ka� �.3e•, 44t4,43 4 el \ ASM-1