Loading...
HomeMy WebLinkAboutNCC243229_(ARPA) DWI Letter of Intent to Fund_20241107 :_`i,:STATE',;'" ��pp-� I74 1 J 1 fpa,?'\ ROY COOPER Governor ELIZABETH S.BISER .` '4AGti2V� =` Secretary „. a +`^D`-_=" SHADI ESKAF NORTH CAROLINA Director Environmental Quality February 10, 2022 Dane Rideout, Town Manager Town of Elizabethtown 805 W. Broad Street Elizabethtown NC 29337 Subject: Letter of Intent to Fund Wastewater Treatment Plant Expansion American Rescue Plan-Earmark Project No.: SRP-W-ARP-0008 Dear Mr. Rideout: The Division of Water Infrastructure has reviewed your Request for Funding, and determined your project is eligible to receive American Rescue Plan(ARP) funding from the State Fiscal Recovery Fund established in S.L. 2021-180. Projects funded from the State Fiscal Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP Project Grant will be one hundred percent of eligible project costs up to a maximum of $13,600,000. The first milestone is the submittal of a Bid and Design Package by August 1, 2022. Please note that this intent to fund is contingent on meeting all of the following milestones: Milestone Date Apply for all Necessary Permits* ASAP Bid and Design Package Submittal (obtain all permits) August 1, 2022 Bid and Design Package Approval December 1, 2022 Advertise Project, Receive Bids, Submit Bid Information, April 3, 2023 and Receive Authority To Award Execute Construction Contract(s) May 1, 2023 Receive last reimbursement- Statutory December 31, 2026 *An engineering alternatives analysis (EAA) may be required on certain projects. See: https://deq.nc.gov/about/divisions/water-resources/water-quality-permitting/npdes- wastewater/permitting-process Failure to meet any milestone may result in the forfeiture of funding for the proposed project. Noemt f nm Quality I Diviruct ure 512 N.rth SalisburyCarolina Ds treetpart 1 1633eno Mail ServiceEnviroental Centerua I Raleigh,Northsionof CarolinaWaterInfrast 27699-1633 NORTH CAROLINA Department of Environmental oval; 919.707.9160 Dane Rideout, Town Manager February 10, 2022 Page 2 of 2 Note that the Division will make no reimbursements of ARP funds after December 31, 2026 The State Environmental Policy Act exempts projects funded by the State Reserve (such as this project) from state-mandated environmental review. Federal requirements may still apply. [NCGS 113A-12(2)h.] Upon detailed review of the project during the funding process, it may be determined that portions of your project are not eligible for funding. US Treasury Requirements Projects with an expected total cost of ten million dollars or more must meet US Treasury requirements for prevailing wage rates, project labor agreements, and related requirements. Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF Compliance and Reporting Guidance Update 2.1 final (treasury.gov) specifies. If you have any questions,please contact Trupti Desai, PE, by phone at(919) 707-9166 or by email at trupti.desai@ncdenr.gov. Sincerely, ?t.- Airez.2.6ei Jon Risgaard, Chief State Revolving Fund Section CC: David K. Brandes, EL Robinsons Engineering, Columbia, SC Ken Pohlig, PE (DWI, via email) Trupti Desai, PE (DWI, via email) Mark Hubbard, PE (DWI, via email) ARP Project File (COM_LOIF)