HomeMy WebLinkAboutMusselshell As Built Report Approval
Hartshorn, Blake
From:Hartshorn, Blake
Sent:Tuesday, November 5, 2024 4:10 PM
To:Harrell, Matthew
Subject:Musselshell As Built Report Approval
Attachments:Musselshell Construction Bond.pdf
Good Afternoon Matthew,
In accordance with the signed mitigation banking instrument and corresponding approved Bank Parcel
Development Plan, Restoration Systems submitted an As-Built Report on June 17th, 2024 with a revision date of
th
September 25and October 31st to the Division of Water Resources (DWR) for the Musselshell bank parcel (DWR
ID#: 20210020v6) for review and approval. By copy of this correspondence, this As-Built Report has been reviewed
and is approved. Once DWR receives a monitoring bond per the requirements of the mitigation banking
instrument, then DWR can proceed with the issuance of a credit release for Task 3. The performance bond that
DWR currently has on file is attached to this email and is no longer required.
Thank you,
Blake Hartshorn (he/him)
Mitigation Specialist, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (919) 707-3684
Cell: (919) 817-0360
blake.hartshorn@deq.nc.gov
1