HomeMy WebLinkAboutSW4240901_O&M Agreement/Plan_20241106 Operation & Maintenance Agreement
Project Name: Beau's View - Mitchell's Gorge
Project Location: Roaring Gap - Old Beau; Mitchell's Gorge off Turnberry Dr.
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s)on this project include (check all that apply&corresponding O&M sheets will be added automatically):
Infiltration Basin Quantity: 0 Location(s):
Infiltration Trench Quantity: 0 Location(s):
Bioretention Cell Quantity: 0 Location(s):
Wet Pond Quantity: 0 Location(s):
Stormwater Wetland Quantity: 0 Location(s):
Permeable Pavement Quantity: 0 Location(s):
Sand Filter Quantity: 0 Location(s):
Rainwater Harvesting Quantity: 0 Location(s):
Green Roof Quantity: 0 Location(s):
Level Spreader- Filter Strip Quantity: 0 Location(s):
Proprietary System Quantity: 0 Location(s):
Treatment Swale Quantity: 0 Location(s):
Dry Pond Quantity: 0 Location(s):
Disconnected Impervious Surface Present: No Location(s):
User Defined SCM Present: No Location(s):
Low Density Present: Yes Type: Dispersed flow only
I acknowledge and agree by my signature below that i am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the
system or responsible party.
Responsible Party:
Title&Organization:
Street address:
City, state, zip:
Phone number(s):
Email
Signature: Date: - ..
I, 3 a Notary Public for the State of
County of , do hereby certify that i�(LMA DEL
personally appeared before me t is day of P u ni u- — and
acknowledge the due execution of the Pperations and Maintenance Agree ent.
Witness my hand and official seal, E41 21 QAS,(
46: pTAR
N .m
GNA NYua k�
�j7"M-EZ My commission expires 8/19/2024
Version 1.5 O&M Agi eel I lei it Page 1 of 1
Low Density Maintenance Requirements
Important maintenance procedures:
The drainage area to the vegetated conveyance or vegetated receiving area will be carefully
managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area.
After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated
receiving area, fertilizer will not be applied to the vegetated receiving areas.
The vegetated conveyance or vegetated receiving area will be inspected quarterly . Records of operation and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element: Potential problem: How to remediate the problem:
Vegetation is too short or Maintain grassed vegetation such that the swale or vegetated
Vegetation too long. area does not erode during the peak flow from the 10-year
storm
Trash/debris is present. Remove the trash/debris.
Vegetated receiving Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re-
areas erosive gullies have sod (or plant with other appropriate species) and water until
formed. established. Provide lime and a one-time fertilizer application.
Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site.
The outlet device (if
applicable)
The outlet device is
Repair or replace the outlet device.
damaged
Erosion or other signs of
damage have occurred at Repair the damage and improve the flow dissipation structure.
the outlet.
The receiving water Discharges from the site
are causing erosion or
sedimentation in the Contact the local NCDEQ Regional Office.
receiving water.