HomeMy WebLinkAbout20160173 Ver 1 _Paper Copy Received _20160223KE
KELLER ENVIRONMENTAL 2 0 1 60 1 7 6
ENVIRONMENTAL CONSULTANTS
To: Tasha Alexander
US Army Corps of Engineers
Raleigh Regulatory Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Re: Apex Summit Church
PCN Submittal
Apex; Wake County, North Carolina
Dear Tasha & DWR Staff:
February 22, 2016
NCDWR Staff
NC DWR, 401 & Buffer Permitting Unit
512 North Salisbury Street
Raleigh, NC 27604
_[20W[M0
FE3 2 3 2016
Thank you for assisting BC Construction Group, Burton Engineering Associates and Keller
Environmental (KE) with the jurisdictional permitting concerning the proposed church center. We are
pleased to submit the following project to you for US Army Corps of Engineers (COE) 404 approval
using Nationwide Permits (NWP) 18. We are requesting NWP 18 to impact 904 SF (0.02 Acres) of
wetland areas. We are also requesting North Carolina Division of Water Resources (DWR) approval
to impact 2,500 SF (0.06 Acres) of Neuse River Riparian Buffers.
Jurisdictional Wetland Impact- We are requesting permission to place approximately 15 cubic yards
into 904 -square feet of jurisdictional wetland areas. This permanent impact will allow for the retaining
wall to be placed contiguously down the western property line. The area will be utilized for parking
for the proposed church.
Riparian Buffers Impacts- We are requesting permission to impact 2,500 SF (0.06 Acres) of Neuse
River Riparian Buffers (NRB) in the southeastern section of the project area. The impacts include
1,500 and 1,000 SF of Zone 1 and 2, respectively. This will allow for the stormwater outlets CS -3
and CS -4 to discharge from the sand filters to the stream channel. The permanent impact to the
NRB's will be 25 -feet wide. It will allow for proper discharge attenuation and maintenance access
and easement areas. No impact (i.e., stream bank or channel armoring) to the stream is anticipated.
Existing Conditions- The existing commercial property is located at 3000 Lufkin Road in Apex, NC. It
is '/4 -mile southwest of the intersection of NC -1010 (Ten -Ten Road) and US -1. The property is
forested primarily with mixed pine/hardwood in the southern half and along the eastern property line.
There is an intermittent tributary to Middle Creek along the eastern property line that starts
approximately 1,400 linear feet north of the southeast property corner. There is a small headwater
wetland approximately 1,200 linear feet north of the southwest property corner. This linear wetland
flows southwest off property and drains into a perennial stream flowing from the western "Hertz
Equipment Rental" property culvert.
Apex Summit Church
PCN Submittal
February 22, 2016
Page 2 of 2
We have attached several items to the attached PCN to assist your review of the project. If you
should have questions or require additional clarification, please feel free to contact me at 749-8259 (cell)
or email: jay(a�kellerenvironmental.com.
Sincerely,
Keller Environmental, LLC
Jay Keller
Principal
Cc: Ben Whited; BC Construction Group
Luke Bugenske, PE; Burton Engineering
Attachments:
• February 22, 2016 PCN
• Agent Authorization
• USGS Topographic Survey
• Soil Survey Map
• Apex Summit Church 2013 TopoAerial
• January 28, 2016 DWR Stream Letter
• January 27, 2016 Wetland Data Forms (2)
• Jurisdictional Determination Form (7 pages)
• Summit Church Engineering Plans (4 sheets)