Loading...
HomeMy WebLinkAbout20160202 Ver 1_Cover letter Attachment L Bridge 271_20160301Carpenter,Kristi From: Sent: To: Cc: Subject: Attachments: Thomson, Nicole J Tuesday, March O1, 2016 3:28 PM David.E.Bailey2@usace.army.mil; Wanucha, Dave Carpenter,Kristi; Parker, Jerry A; Powers, Tim RE: Bridge No. 271 over North Prong Stinking Quarter Creek on SR 3343 (Coble Church Rd), Guilford Co.; WBS No. 17BP.7.R.86 Cover letter Attachment L Bridge 271.pdf GAH! I goofed. In the original email, I sent you the wrong Cover letter/attachment L. Please find the CORRECT one attached for this project. Sorry!!! Nikki From: Thomson, Nicole J Sent: Tuesday, March 01, 2016 3:06 PM To: David.E.Bailey2@usace.army.mil; Wanucha, Dave Cc: Carpenter,Kristi; Parker, Jerry A; Powers, Tim Subject: Bridge No. 271 over North Prong Stinking Quarter Creek on SR 3343 (Coble Church Rd), Guilford Co.; WBS No. 17BP.7.R.86 Please see the attached Low Impact Design Bridge Replacement project and supplemental information. Due to file size, I may have to split this up into multiple emails. I apologize in advance. Please feel free to contact me with any questions or concerns. Thank you! Nikki Nicole J. Thomson Division Environmental Supervisor Assistant Division Environmental Office 919-754-7806 Mobile Nithomson2(a�ncdot.qov PO Box 14996 Greensboro, NC 27415-4996 �;�� �,, � � 11 +� � � i Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Transportation March 1, 2016 US Army Coips of Engineers Raleigh Regulato�y Field Office Attn: Mr. David Bailey 3331 Heritage Trade Dr., Ste. 105 Wake Forest, NC 27587 Attention: Mr. Dave Bailey and Mr. Dave Wanucha PAT McCRORY Governor N]CHOLAS J. TENNYSON Secretary NC Division of Water Resources Winston-Salem Regional Office Attn: Mr. Dave Wanucha 450 W. Hanes Mill Rd., Ste. 103 Winston-Salem, NC 27105 Subject: Notification for the replacement of Bridge #271 over North Prong Stinldng Quarter Creelz on SR 3343 (Coble Chw•ch Road) in Guilford Couvty. WBS # 17BP.7.R.86 Dear IvL. Bailey and Mr. Wanucha, The North Carolina Department of Trausportation is scl�eduled to replace Bridge #271 with a new bridge at the same location. I have included the Attachments G& L with a project description and a set of the project plans. A starmwater management plan is also attached. Please review U�is project for compliance by your Division. We plan to begin construction as soon as possible. If further infonnation is required, please contact Jeiry Parker at (336) 256-2063. Your early review and consideration will be appreciated. Sincerely, �"�-��«� M. Mills, P.E. Division Engineer, Division 7 Enclosures cc: Tim Powers, NCDOT Barry Harrington, Roadside Emironmental Field Operations Engineer, NCDOT Jeremy Warren, NCDOT Bobby Norris, District 2 Engineer, NCDOT File Copy �Nothing Compares'�.�_. StateoFNorthCarolina � Departmen�o(Transpotla�ion � DivisionofHighways,Division70ffice 1584 Y�meyville Sheet, Greensboro, NC 27405� P. O. Box 74996, Geensboro, NC 27415-4996 336�487-0000 ,'� Transportation PAT McCRORY Covernor NICHOLASJ.TENNYSON Secretory Attachment L: Low Impact Bridge Replacement Process Low Impact Bridge Project No.: B-N/A County Guilford Bridge No.271 over North Pronq Stinkinq Quarter Creek WBS Element Number 17BP.7.R.86 This project is subject to the Low Impact Bridge Process as agreed to on October 6, 2009. This project meets the documentation requirements and approval procedures under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project meets the standards of NCDOT's Minimum Criteria Rules. Date: March 1. 2016 ApplicantName: NCDOT Applicant Address: 1584 Yancewille Street Greensboro, NC 27415 Primary Contact for Project: Jerry A. Parker Phone No.: 336-256-2063 Is this an after-the-fact application: Yes X No River Basin: Cape Fear/Jordan Lake Watershed Stream Classification: WS-V; NSW; 16-19-8-1: 03-06-03 Regulatory Authorization Options for this Activity Federal: USACE Nationwide General Permit 3— Maintenance State: General Water Quality Certification #3687 and/or Buffer Authorization Local: None Project Description — The project consists of replacing Bridge #271 over Notth Prong Stinking Quarter Creek on SR 3343 (Coble Church Road) and improving roadway approaches. The existing 53' L X 26` triple span, timber deck on timber joists with timber caps and piles at end and interior bents, timber bulkhead bridge is structurally deficient and will be replaced with a new 70' L X 30' W, single span, cored slab bridge at the same location. An off-site detour will be utilized during construction. There are two small wetlands located witl�in the project area (WA and W; there is a minor amount of excavation (to remove the existing abutmenUinterior bent) �Nothing Compares��_ StateofNorthCarolina � DepanmentofTranspotlation � DivisionofHighways,Division70ltice 1584 Yenceyville Street, Geensbaro, NC 27405� P. O. Hox 14996, Greensbora, NC 27415-4996 336-487-0000 Transportation PAT McCRORY Governor NICHOLAS J. TENNYSON Secretary proposed to the linear wetland located closest to the bridge and a minor amount of wetland fill (for the roadway fill associated with the bridge approaches) proposed to the wetland to the east of the bridge. This project proposes only 13 linear feet of permanent stream impacts for streambank stabilization (i.e. rip rap will not be within the thalweg of the channel). There are no deck drains proposed on this bridge. The project drainage system consists of two drop inlets at the east approaches and one drop inlet at the west approach. Discharges from these pipe outlets will be attenuated on riprap pads located outside the riparian buffer v�eas and will flow away from the buffer due to existing topography. There are no utility relocations proposed with this bridge replacement. Proposed Riparian Buffer impacts include 2,467 square feet in Zone 1 and 986 square feet in Zone 2 to accommodate the bridge. Please note that there is also 14 square feet of weUand accounted for within the Zone 1 riparian buffer total (<0.01 acres). There is no habitat for, nor recorded species of, the Small Whorled Pogonia within tl�e project boundaries. The Bald Eagle is protected in every counTy in North Carolina under the Bald and Gold Eagle Protection Act; however, no suitable feeding/water source is located within one mile of the project study area to support Bald Eagle habitat. Also, Mr. Gary Jordan (USFWS) recenUy released the Programmatic Conference Opinion (PCO) for the recently listed Nortl�ern Long Eared Bat (NLEB). This opinion, sYates in part, that "... it rs the Service's conference opinion that NCDOT activities in easterrr North Carolina (Divisions 1-8), as proposed, are not Zikely to jeopardize the continued existence of the NLEB. " � �- � � �� L��� Signature: Print Name: Ci • r\` �� �\ S Tit1e: �� V' i S i p(n �i �'1 G i Yl �P.V�' �Nothing Compares��. StateofNorthCarolina � DepartmenrofTransponation � DivisionofHighways,Division70�ce 1584 Ysnceyvi(le Streey Greensboro, NC 27405� P. O. IIox 14996, Greensborq NC 27415-4996 336-487-0000