Loading...
HomeMy WebLinkAbout20120142 Ver 3_Notice of Deficiency_20160301Carpenter,Kristi From: Chapman, Amy Sent: Tuesday, March O1, 2016 8:12 AM To: Wanucha, Dave; Carpenter,Kristi Subject: FW: R-3421 ABC - Richmond County Attachments: Notice of Deficiency.pdf Follow Up Flag: Flag Status: From: Bowman, Misty W Follow up Completed Sent: Monday, February 29, 2016 1:59 PM To: Chapman, Amy <amy.chapman@ncdenr.gov> Cc: Harrington, Barry W<bwharrington@ncdot.gov>; King, Art C<acking@ncdot.gov>; Gantt, Matt <matt.gantt@ncdenr.gov>; Olinger, John R <jolinger@ncdot.gov> Subject: R-3421 ABC - Richmond County Good Afternoon, The attached letter is for your file. The original will be mailed in the morning. Thanks, �/''Ilet� NV. �owman Administrative Secretary II NCDOT - Division 8 910.944.2344 office 910.944.5623 fax mwbowman(c�ncdot.qov 902 North Sandhills Boulevard Aberdeen, NC 28327 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Transportation February 26, 2016 NCDENR, Division of Water Resources Attn: Amy Chapman 1617 MSC Raleigh, NC 27699-1617 Subject: Notice of Deficiency NC Department of Transportation NCDWR Project No. 20120142v3 TIP Number R-3421ABC, US-74 Bypass) in Richmond County Dear Ms. Chapman, PAT McCRORY Gavernar NICHOLAS J. TENNYSON Seaetary (Rockingham/Hamlet Bypass) to US-220 (Ellerbe I am responding to your Notice of Deficiency dated February 22, 2016 for the above referenced project. This came as a result of an inspection by Dave Wanucha on February 19, 2016 for sediment loss due to recent storms received on the project. During this inspection, the NPDES reports were reviewed and found not to be in compliance, specifically due to the lag time between discovery of a noted '`need of attentiod' and actually making Yhe needed repairs. Some items noted as urgent or routine were not completed within the allowed time frame. The Department is committed to staying in compliance with the 401 Water Quality Certifieation for this project. We have reviewed the project and the NPDES record keeping and taken the following aetions to keep this project in compliance: The Department has reviewed the proper NPDES reporting requirements with our Inspection staff along with the contractor's personnel. Some of the routine items that were not able to be completed within the 5 days due to contii�ued rains, conditions too wet to work, or lack of manpower were put on the following weeks report as urgeut. This resulted in the routine items being reported as urgent and not getting completed in the two days following. Moving forward, rouYine items will stay roufine. If for reasons beyond the contractors control these items are not completed within 5 days, they will be noted with supporting reasoning why they were not completed and added to Uie next report as routiue and compleYed within the next week. Urgent items will be addressed within the 2 day period if at all possible. If carryover items are not completed the next week or the contractar is unable to complete routine or urgent items within the required time limits due to lack of manpower or lack of urgency on their part, the Department will suspend all operaiions on the project except work necessary to complete these items. The contractor has also emphasized this to their employees. The contractor is mobilizing additional fine grading crews this month. These crews will be used to finish slopes for permanent vegetation. �"/'Nothing Compares�.._ SlafeofNotlhCemlina Depanmen[ofTrensponation � DivisionofHighweys 902 Norlh Sandhilit BoulevaM � Aberdeen, NC 28315 910-94S3144 Ms. Amy Chapman R-3421ABC, Richmond County Page 2 • In addition to the extra grading crews, the contractor is planning to section off the project and have each section's grade crew responsible for erosion control in each section along with independent erosion contro] to assist each area. • We have reemphasized checking the project toward the end oPeach day for proper erosion control measures and reviewing the forecast to prepare the project for rain events. • The conhaetor's superintendent along with the Departments lead inspector will review ihe projects independently of the NPDES reporting to ]ook for potential problem areas for erosion control. • The Division staff will monitor the contractor's progress on erosion control to ensurc lhese additional measures commitCed by the contractor are being performed and are effective. Again, the Depanment is commit[ed to ensuring that the contractor constructing this project operates within the confines o'f the NCDWR 401 permit. We will take necessary steps in the future if the contractor does not abide by the changes they have stated above. Please let us lrnow if there are questions concerning this matter. Sincerely, ,/ Brandon .Jones,P.E. Division Engineer ea Mr. Andy Williams, US Arniy Corps of Engineers Mr. Barry Harrington Mr. Art King Mr. Matt Gantt, NCDENR ConnecY Site