Loading...
HomeMy WebLinkAboutSW4240703_Design Calculations_20241031 Project Information Complete this sheet if required by your reviewing authority. Contact them for any questions. Grey boxes/text are optional. SNAPv4.2.0 LOCATION Project Name(optional): Cane Creek Phase 8 Parcel ID(optional): Submission Date(optional): 10/31/2024 date Nutrient Management Watershed: Jordan Lake menu Local Jurisdiction/Reviewing Agency: menu Subwatershed: Haw River menu Project Latitude Coordinates(optional): N Phosphorus Delivery Zone: Jordan-050050 menu Project Longitude Coordinates(optional): W Nitrogen Delivery Zone: Jordan-050050 menu PROJECT DETAILS Development Land Use Type: Single Family Residential menu Disturbed Area: 399,445 ft2 Part of Common Development Plan? yes y/n Project Activity: New Development menu Designated Downtown Area? yes yin Project Drains to SA Waters? no yin Public Linear Road/Sidewalk Project? no y/n Pre-Project Land Use: fallow/open menu Project Owner Type: (Private menu Project Description(optional): STORM WATER DETAILS (Falls ONLY)Onsite Reduction%Req. % Project Uses LID/Runoff Volume Match? no yin Existing BUA/Development Onsite? yes yin Local Gov't nutrient req's same as State? yes y/n Local Gov't cutoff date for Existing BUA: date Project Drains to Regional SCM? no yin Nitrogen Export Rate Target: 3.80 lb/ac/yr Total Nitrogen Offset Credits Needed: lb/yr Phosphorus Export Rate Target: 11.43 lb/ac/yr Total Phosphorus Offset Credits Needed: lb/yr SNAP v4.2.0 Project Area and Offsite Land Cover Characteristics Precipitation suer City Station: Copy r 'aste VALUES ONLY for Best Results Click here to scroll down to error messages on this sheet. I PROJECT AREA LAND COVERS TN EMC (mg/L) TP EMC (mg/L) Pre-Project Area (ft2) Post-Project Area (ft2) Change pre-to-post(ft2) Roof 1.18 0.11 116,331 116,331 Roadway 1.64 0.34 20,677 79,330 58,653 Parking/Driveway/Sidewalk 1.42 0.18 0 Protected Forest 0.97 0.03 588,274 487,400 -100,874 Managed Pervious/Landscaping 2.48 1.07 1,312,049 1,205,313 -106,736 Offsite or Existing Roof 1.18 0.11 0 Offsite or Existing Roadway 1.64 0.34 0 Offsite or Existing Parking/Driveway/Sidem 1.42 0.18 0 Offsite Protected Forest 0.97 0.03 0 Offsite Managed Pervious 2.48 1.07 0 CUSTOM LAND COVER 1 _ 0 CUSTOM LAND COVER 2 0 CUSTOM LAND COVER 3 0 LAND TAKEN UP BY SCM 1.18 0.11 32,626 32,626 Total (Regulated & UnReg)Area 1,921,000.00 1,921,000.00 Project (Regulated)Area 1,921,000.00 1,921,000.00 SCM Characteristics Stormwater Control Measure(SCM)Characteristics Click here to eo cc Click here to eo cc Click here to eo back to the Copy&Paste VALUES ONLY 5CM101's land Cover Data Click here to review Errors Summary Data SNAP v4.2.0 Nu Best Resolts \\ 11�� I Catchment SCM 101 I meu:to 10'2 /103 • 201 I DM' , 202 I Dr""' >203 301 � 302 303 401 4042 I Dr''t' > 403 501 � 502 k2 Type of SCM Dry pond Dry Pond Dry Pond r P Hydrologic sail group at SCM location B B B SCM Description la Design Storm Size(inches/24hrs) I. Percent of Full Size 100% 10D% 10D% ■ %Annual Effluent 80% 0% 0% 80% 0% 0% 80% 0% 0% 0% 0% 0% 0% 0% I. %Annual Overflow 16% 0% 0% 16% 0% 0% L 16% 0% 0% 0% 0% 0% 0% 0% ■ %Annual ET/Infiltrated 4% 0% 0% 4% 0% 0% 4% 0% 0% 0% 0% 0% 0% 0% I. Custom%Annual Effluent ■ Custom%Annual Overflow I.Custom%Annual ET/Infiltrated ■ SCM Effluent TP EMC(mg/L) 0 0.22 0.00 0.00 0.22 0.00 0.00 0.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I. SCM Effluent TN EMC(mg/L) 1.33 0.00 0.00 1.33 0.00 0.00 1.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ■ Custom Effluent TP EMC 1 F Custom Effluent TN EMC SCM Land Cover TP EMC(mg/L) 0.11 0.00 0.00 0.11 0.00 0.00 0.11 0.00 0.00 0.00 0.00 000 0.00 0.00 1 SCM Land Cover TN EMC(mg/L) 1.18 0.00 0.00 1.18 0.00 0.00 1.18 0.00 0.00 0.00 0.00 000 0.00 0.00 This SCM Drains to Numbered SCM 0 0 0 0 0 0 0 0 0 0 0 0 0 Catchment Routing Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to Catchments Draining to SCM 101 SCM 102 SCM 103 SCM 201 SCM 202 SCM 203 SCM 301 SCM 302 SCM 303 SCM 401 SCM 402 SCM 403 SCM 501 SCM 502 Catchment no no Catchment ` ilm = a Catchment no no _ Catchment no no no _ Catchment no no no Catchment no no no Error Check-Missing SCM' ■' Error Check-Min/Max Size: Error Check-Hydrology: Error Check-Missing SCM Info: Error Check-Drainage Data w/o SCM: Error Checks-SCM Type: um. lot 102 103 201 202 203 un 302 303 COI 402 403 Sm SCM Drainage Area Land Covers Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Directly to Area Draining Direc%to Area Draining Direct%to SCM 101(ft2) SCM 102(ft2) SCM 103(ft2) SCM 201(ft2) SCM 202(ft2) SCM 203(ft2) SCM 301(ft2) SCM 302(ft2) SCM 303(ft2) SCM 401(ft2) SCM 402(ft2) SCM 403(ft2) SCM 501(ft2) SCM 502(ft2) Roof 17,442 61,047 17,442 Roadway 17,100 25,697 30,078 Parking/Driveway/Sidewalk Protected Forest 8,455 10,792 20,890 Managed Pervious/Landscaping _ 154,873 515,209 160,231 Offsite or Existing Roof _ Offsite or Existing Roadway _ Offsite or Existing Parking/Driveway/Sidewalk Offsite Protected Forest _ Offsite Managed Pervious CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP By SCM 11,626 12,722 8,278 TOTAL AREA DRAINING TO SCM(ft): 209,496 0 0 625,467 0 0 236,919 0 0 0 0 0 0 0 CATCHMENT AREA(ft): 209,406 625,467 236,919 0 0 Nutrient Export Summary SNAP v4.2.0 Landcover Et SCM Data Review Errors/Advisories Errors/Advisories Avg Annual precip(in)= 46.62 SCM Area(ftZ)= 32,626 Total(Regulated+ Unregulated)Area(ftZ)= 1,921,000 SCM Treated Area(ft2)= 1,071,882 Project(Regulated) 1,921,000 Catchment Routing: No errors Area(le)= Net BUA(Project Area Treating Runoff from 174,984 Net BUA indicates new development or expansion. no BUA only ftZ)= Existing BUA or Offsite: Custom Landcovers are no Disturbed Area(ftZ)= 399,445 present: Total Nitrogen Export Target 167.ss Total Phosphorus Export Target 63.06 Scaled to Project Area(lb/yr): Scaled to Project Area(lb/yr): I Total Area Total Area Project Area Total Area Project Area Total Area Project Area Project Area Total Area Project Area (Onsite+ Post-Project Post-Project Post-Project Post-Project Post-Project Post-Project Nutrient Export Summary Offsite) (Onsite Only) before before Post-Project Post-Project SCM-Treated SCM-Treated Untreated Untreated Pre-Project Pre-Project Treatment Treatment after Treatment after Treatment Area Only Area Only Areas Areas Area(All Landcover Types)(acres) 44.1001 44.1001 44.1001 44.1001 44.1001 44.1001 24.6070 24.6070 19.4931 19.4931 Percent Built-Upon Area(BUA)(%) 1% 1% 10% 10% 10% I 10% 16% 16% 3% 3% Built-Upon Area(BUA)(sqft) 20,677 20,677 195,661 195,661 195,661 195,661 168,806 168,806 26,855 26,855 Annual Runoff Volume(fts/yr) 400,906 400,906 1,059,928 1,059,928 1,025,021 1,025,021 792,065 792,065 232,956 I 232,956 Annual Runoff%Change 164% 164% 156% 156% Total Runoff Change(cuft/yr) 659,021 659,021 624,115 MOM Total Nitrogen EMC(mg/L) 1.95 1.95 1.54 1.54 1.40 1.40 1.36 1.36 1.52 1.52 Total Nitrogen Load Leaving Site(lb/yr) 48.78 48.78 101.65 I 101.65 89.40 89.40 67.32 67.32 22.08 22.08 Total Nitrogen Loading Rate(1b/ac/yrJ_ 1.11 1.11 2.31 2.31 2.03 2.03 2.74 2.74 1.13 1.13 Total Nitrogen%Change Pm-to-Post 108% 108% 83% 83% Total Nitrogen Change(lb/yr)Pre-to-Post 52.87 52.87 40.61 40.61 Total Phosphorus EMC(mg/L) 0.68 0.68 0.35 0.35 0.27 0.27 0.24 0.24 0.37 0.37 Total Phosphorus Load Leaving Site(lb/yr) 16.98 16.98 23.27 23.27 17.31 17.31 11.86 11.86 5.45 5.45 Total Phosphorus Loading Rate(Ib/ac/yr) 0.38 0.38 0.53 0.53 0.39 0.39 0.48 0.48 0.28 0.28 Total Phosphorus%Change Pre-to-Post 37% 37% 2% 2%Total Phosphorus Change(Ib/yr)Pre-to-Post 6.29 6.29 0.33 0.33 SCM/CLatchment Summary SCM ID and Type volume TN Reduction TP Reduction TN Out Reduction(%) (%) (%) Out (Ibs/ac/yr) (Ibs Out/ o TP Falls Lake ONLY:Onsite Reduction Compliance Check Catchment 1 4.22% 14.06% 29.74% 3.10 0.54 II Nitrogen II Phosphorus 101:Dry Pond 4.22% 14.06% 29.74% 3.10 0.54 Onsite%Reduction Requirement 102:NA 0.00% 0.00% 0.00% _ 0.00 0.00 Export Target Scaled to Area(lb/yr) 167.58 63.06 103:NA _ 0.00% 0.00% 0.00% 0.00 0.00 Export Load Post-Project Before Treatment _101.65 23.27 Catchment 2 4.22% 15.68% 35.50% 2.41 0.43 Total Reduction Need(lb/yr) 201:Dry Pond 4.22% 15.68% 35.50% 2.41 0.43 Onsite Reduction Need(lb/yr) 202:NA _ 0.00% 0.00% _ 0.00% 0.00 _ 0.00 Onsite Export Target(Ib/yr) 203:NA 0.00% 0.00% 0.00% 0.00 0.00 Project Area Post-Project After Treatment 89.40 17.31 Catchment 3 4.22% 15.96% _ 32.22% 3.27 _ 0.57 301:Dry Pond 4.22% 15.96% _ 32.22% 3.27 _ 0.57 302:NA 0.00% 0.00% 0.00% 0.00 _ 0.00 303:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 0.00% 0.00% 0.00% 0.00 0.00 401:NA 0.00% 0.00% 0.00% 0.00 0.00 402:NA 0.00% 0.00% 0.00% 0.00 0.00 403:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 5 0.00% 0.00% 0.00% 0.00 0.00 501:NA 0.00% 0.00% 0.00% 0.00 0.00 502:NA 0.00% 0.00% 0.00% 0.00 0.00 503:NA 0.00% 0.00% 0.00% 0.00 0.00 Catchment 6 0.00% 0.00% 0.00% 0.00 0.00 601:NA 0.00% 0.00% 0.00% 0.00 0.00 602:NA 0.00% 0.00% 0.00% 0.00 0.00 603:NA 0.00% 0.00% 0.00% 0.00 0.00 1 Nutrient Management Strategy Watershed - Nutrient Offset Credit Reporting Form SNAP v4.2.0 Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offset credits. Contact and rule implementation information can be found online at: http://deq.nc.gov/about/divisions/water-resources/planning/nonpoint-source-management/nutrient-offset-information PROJECT INFORMATION Applicant Name: Project Name: Cane Creek Phase 8 Project Address: Date: (mm/dd/yyyy) Development Land Use Type: Single Family Residential County: Project Activity Type: New Development Project Area (sqft): 1,921,000 Project Latitude: 0.000000 Post-Project Built-Upon Area%: 10.19% I Project Longitude: 0.000000 WATERSHED INFORMATION Nutrient Management Watershed: Jordan Lake N Target Export Rate(Ib/ac/yr): 3.80 Subwatershed: Haw_River P Target Export Rate(Ib/ac/yr): 1.43 Nitrogen Delivery Zone: Jordan-050050 Nitrogen Delivery Factor: 71% Phosphorus Delivery Zone: Jordan-050050 Phosphorus Delivery Factor: 67% PERMANENT NUTRIENT OFFSET REQUEST Post-Project Nitrogen Calculations-Projects with No Offsite or Built-Upon Area (Where (A) (B) I (C) (D) (F) (G) Applicable) TN Permanent Total TN TN Untreated TN Export TN Treated TN Remaining Additional TN Delivery Offsets Permanent Load(Ib/yr) Target Load Load(Ib/yr) Reduction Local Gov't Factor(c/o) Required Offsets to (Ib/yr) Need(Ib/yr) (Ib/yr) Offsets(Ib/yr) Buy(Ib/yr) 101.7 167.6 89.4 0.0 ' 71.0% 0.0 0.0 1 Post-Project Phosphorus Calculations-Projects with No Offsite or Built-Upon Area (A) (B) (C) (D) (F) (G) (Where Applicable) TP Permanent Total TP TP Untreated TP Export TP Treated TP Remaining TP Delivery Offsets Additional I Permanent Load(Ib/yr) Target Load Load(lb/yr) Reduction Local Gov't Factor(%) Required Offsets to (Ib/yr) Need(Ib/yr) (Ib/yr) Offsets(Ib/yr) Buy(Ib/yr) 23.3 63.1 17.3 0.0 I I 67.0% 0.0 0.0 I LOCAL GOVERNMENT AUTHORIZATION Local Government Name:I Staff Name: Phone: Staff Email: Date: Local Government Authorizing Signature: