Loading...
HomeMy WebLinkAboutSW6241001_O&M Agreement/Plan_20241029 '��' ��." �'�'"',�3 ..,Na �° xKti.�i . .�'� �3f y , E . aEnt n ce; rP °e_ t Project Name: FTCC Regional Fire and Rescue Training Center Phase II Project Location: 775 Tom Starling Rd., Fayetteville, NC 28306 .=- .°. .h .._. ... . . .. s � `Co,�e'i•Page _- _ ' "��, . Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply&corresponding O&M sheets will be added automatically): Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 1 Location(s): Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filler Quantity: Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader- Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: 4 Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Fayetteville Technical Community College Title&Organization: Kevin Paul,VP of Facilities and Support Services Street address: 2201 Hull Rd City, state, zip: Fayetteville, NC 28303 Phone number(s): 910 678 8327 Email: p @faytechcc.edu Signature: Date: m/ asakt-1 I, ry1d,flcl(A. C\(es , a Notary Public for the State of S C. County of C.urwcie ioc' c\ , do hereby certify that � ���(� ate f( personally appeared before me this Lim day of a�u and acknowledge the due execution of the erations and Maintenance Agreement. Witness my hand and official seal, o.:cp. R. c ''% mission. O,p. ` NOTARY 010�co ��'Q GnP S.202� ,,' •;,,+,,�`Nf ...OWN Seal '",,,,,,,C„,,,,, My commission expires c-U'?t° �p aaa e STORM-El 7/11/2024 Version 1.5 O&M Agreement Page 1 of 1 r rrr. ` , Wet RoWW.Maiiitenance Re:g irieir"ient`s : -r Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish - the plants on the vegetated shelf. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet - pond. _ If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. At least once annually, a dam safety expert will inspect the embankment. Any problems that are - found will be repaired immediately. _ The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County), Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground pond erosive gullies have cover and water until it is established. Provide lime and a one- formed. time fertilizer application. The inlet pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site. applicable). The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design depth for sediment where it will not cause impacts to streams or the SCM. storage. The forebay Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. E' ( 5 i` [N.-fi� �.. K ^ �: r` ,t3.r -.Y°s Mi.:lH.bf iCtiv"?aSCwMnfr_�h_'Av- �SxCgrYf•••rYn:rvfu.fr.Sat *PF i r .. � �,'!'� � ,;:hkNefi tOlia llllaintenanace" Re(�taY■4i.,.��J�a■Q.■�l� sTWORITlVOI SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design sediment storage where it will not cause impacts to streams or the SCM. depth. The main treatment area Algal growth covers over Consult a professional to remove and control the algal growth. 50% of the area. Cattails, phragmites or other invasive plants cover Remove the plants by wiping them with pesticide (do not spray). 50% of the basin surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, disease, Plants are dead, diseased etc. Remedy the problem and replace plants. Provide a one- or dying. time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. The embankment A tree has started to grow Consult a dam safety specialist to remove the tree. on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clogging has occurred. Clean out the outlet device and dispose of any sediment in a gg g location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees. are growing on the mat. Floating wetland island (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state. missing. ., t > ;. '.0 'a* !' t:*4.:Ow see .fl*t it a?awC* kL^+n earth**:�.°nW'ft's trhaefl•}t y ,:. SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the wet pond are causing erosion Contact the local NCDEQ Regional Office. or sedimentation in the receiving water. UMW WI ` . . . ]Neboetentiori, ordpd.ggritSum.miity 7 ' . - . . s . . , r - 3, n Wet Pond Diagram WET POND ID FOREBAY MAIN POND East Permanent Pool El. 85.5 Permanent Pool El. 85.5 Temporary Pool El: 90 Temporary Pool El: 90 Pretreatment other Clean Out Depth: 6.5 Clean Out Depth: 6.5 than forebay? No Sediment Removal EI 79 Sediment Removal El 79 Has Veg. Filter? Yes Bottom Elevation: 79 Bottom Elevation: 79 ATTACH ADDITIONAL.SHEETS IF NECESSARY Tr_dafinent Swale£Mainte'ilia:401.tequi eti Brits , Important operation and maintenance procedures: _ The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. _ After the initial fertilization to establish the grass in the swale, fertilizer will not be applied to the treatment swale. The grassed swale will be inspected quarterly. Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, re-sod (or erosive gullies have plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application. Sediment covers the grass Remove sediment and dispose in an area that will not impact at the bottom of the swale. streams or SCMs. Re-sod if necessary. The entire length of the Vegetation is too short or Maintain grassed vegetation such that the swale or vegetated swale too long. area does not erode during the peak flow from the 10-year storm Determine the source of the problem: soils, hydrology, disease, Grass is dead, diseased or etc. Remedy the problem and replace plants. Provide a one- dying. time fertilizer application to establish the ground cover if necessary. Trees and/or other woody Remove the trees and woody vegetation from the treatment vegetation are present in swale, regrade the treatment swale if necessary and re- the treatment swale. establish grass as shown on the approved plans. Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device (if applicable) The outlet device is Repair or replace the outlet device. damaged Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the treatment swale are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water.