Loading...
HomeMy WebLinkAboutNC0050342_Compliance Evaluation Inspection_20160224 PAT MCCRORY GovemorART M1 ft s;'• j,;a DONALD R. VAN DER VAT Secretory Water Resources ENVIRONMENTAL QUALITY S. JAY ZIMMERMAN February 24, 2016 Director City of Winston-Salem RECEIVED/NCDEA/DWR Attn: Ron Hargrove, Director Utilities P.O. Box 2511 DF R 2 9 1016 Winston-Salem, NC 27102-2511 Water Quality Subject: Compliance Evaluation Inspections Permitting Section Archie Elledge Wastewater Treatment Plant, NPDES Permit NC0037834; and Muddy Creek Wastewater Treatment Plant, NPDES Permit NCO050342 City of Winston-Salem Forsyth County Dear Mr. Hargrove: Ron Boone of the Winston-Salem Regional Office of the NC Division of Water Resources (DWR or the Division)conducted compliance evaluation inspections(CEI)of the Archie Elledge Wastewater Treatment Plant(NC0037834) and the Muddy Creek Wastewater Treatment Plant(NC0050342) on February 18, 2016. The assistance and cooperation of Jon Southern, Keith Jones, and Carol Bell, during these inspections, was greatly appreciated. Inspection checklists are attached for your records and inspection findings are summarized below. Archie Elledge Wastewater Treatment Plant, NPDES Permit NCO037834 General Information The WWTP is located at 2801 Griffith Road in Winston Salem, Forsyth County, NC. The permit ,authorizes the City to operate this 30 MGD WWTP, which consists of bar screens, grit basins, primary clarifiers, aeration basins, final clarifiers, sodium hypochlorite and bisulfite feed for disinfection and dechlorination, lime/magnesium hydroxide blend and caustic feed for alkalinity control, centrifuges with screw conveyors, sludge digestion, polymer and iron salt feed, odor control systems, a sludge drying facility, waste sludge lagoons and instrumented flow measurement. The permit authorizes the City to discharge treated effluent from the plant via outfall 001 into Salem Creek, this section of which is currently classified as Class C waters in the Yadkin Pee-Dee river basin. Site Review As was also the case during the previous inspection, Mr. Southern and his crew continue to do an outstanding job operating and maintaining the plant. Mr. Boone noted no issues or discrepancies. State of North Carolina I Environmental Quality I Water Resources 450 West Hanes Mill Road,Suite 300 1 Winston-Salem,North Carolina 27105 336 776 9800 �1 Documentation Review All documentation was reviewed. Mr. Southern and his staff, as well as Carol Bell and the laboratory staff, have done an excellent job of documenting the operation and maintenance of the plant and laboratory operations, as required by the permit; this includes operations/maintenance and operator visitation logs, discharge monitoring reports, laboratory and field laboratory records, chains of custody, etc. Muddy Creek Wastewater Treatment Plant, NPDES Permit NCO050342 General Information The WWTP is located at 4561 Cooper Road in Winston Salem, Forsyth County, NC. The permit authorizes the City to operate this 21 MGD WWTP, which consists of bar screens, grit chambers, primary clarification, three aeration basins with fine bubble diffusers, a hydrated lime silo, secondary clarification, chlorination,dechlorination,instrumented flow measurement, anaerobic sludge digesters, a gravity thickener, sludge storage-lagoons, a belt filter press, a carbon pellet odor scrubber, two emergency generators, an effluent/flood control pump station, and solids blending tanks. The permit authorizes the City to discharge treated effluent from this facility into the Yadkin River (outfall 001) or, under flood conditions, into Muddy Creek (outfall 002). Both receiving waters are currently classified as WS-IV (water supply) waters in the Yadkin Pee-Dee River Basin. Site Review As was the case during the previous inspection, Mr. Jones and his crew continue to do an outstanding job operating and maintaining the plant. Mr. Boone noted no problems,discrepancies, violations, etc., during the site review portion of the inspection. Documentation Review All documentation was reviewed. Mr. Jones and his staff, as well as Carol Bell and the laboratory staff, have done an excellent job of documenting the operation and maintenance of the plant and laboratory operations, as required by the permit; this includes operations/maintenance and operator visitation logs, discharge monitoring reports, laboratory and field laboratory records, chains of custody, etc. The Division greatly appreciates the City's efforts to effectively and efficiently operate and maintain the Elledge and Muddy Creek WWTPs. Mr. Southern and Mr. Jones, and their crews, as well as Carol Bell and the laboratory staff, have done an excellent job and should be commended for their efforts. If you have any questions regarding the inspection or this letter, or if we may be of any further assistance to you, please feel free to call Mr. Boone or me at(336)776-9800. Thank you for your attention to this matter. Sincerely, Sherri V. Knight, PE Regional Supervisor Water Quality Regional Operations Division of Water Resources Attachments: 1. BIMS Inspection Report, Archie Elledge NPDES Permit NC0037834 2. BIMS Inspection Report, Muddy Creek NPDES Permit NC0050342 CC: WSRO - SWP Central Files NPDES Unit City of'Wi'n`ston-Salem Attn: Jon Southern—ORC Archie Elledge WWTP 2801 Griffith Road Winston-Salem, NC 27103 City of Winston-Salem Attn: Keith Jones—ORC Muddy Creek WWTP 2801 Griffith Road Winston-Salem, NC 27103 United States Environmental Protection Agency Form Approved EPA Washington,D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A National Data System Coding(i.e,PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 15 I 3 I NC0037834 I11 121 16/02/18 117 18 L c j 19 L�j 201 21111111 1111111 11 11 1 11 1111 1 1 11111 1111111 11 1 1 166 Inspection Work Days Facility Self-Monitoring Evaluation Rating 131 QA -------------------Reserved--------- 67 70 71 L] 72 I N I 73 I74 75III Ll 80 Section B. Facility Data L_J t i i Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 12 OOPM 16/02/18 09/09/01 Archie Elledge WWTP 2801 Griffith Rd Exit Time/Date Permit Expiration Date Winston Salem NC 271036417 02 OOPM 16/02/18 14/06/30 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Jon Madison Southern/ORC/336-397-7600/ Name,Address of Responsible Official/Title/Phone and Fax Number Contacted James F Crump,2801 Griffith Rd Winston Salem NC 271036417H336-765-0165/ No Section C Areas Evaluated During Inspection(Check only those areas evaluated) Permit - Flow Measurement ® Operations&Maintenance ® Records/Reports Self-Monitoring Program ® Sludge Handling Disposal ® Facility Site Review ® Effluent/Receiving Waters Laboratory Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Names)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date Ron Boone WSRO WQ//336-776-9690/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3(Rev 9-94)Previous editions are obsolete Page# 1 NPDES yr/mo/day Inspection Type 1 31 NCO037834 I11 12 16/02/18 17 18 ICI Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) Please refer to the attached inspection summary letter. Page# 2 Permit: NCO037834 Owner-Facility: Archie Elledge WWrP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? ■ ❑ ❑ ❑ Does the facility analyze process control parameters, for ex MLSS, MCRT, Settleable ® ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment None Permit Yes No NA NE (If the present permit expires In 6 months or less) Has the permittee submitted anew ❑ ❑ ® ❑ application? Is the facility as described In the permit? ® ❑ ❑ ❑ #Are there any special conditions for the permit? ❑ ® ❑ ❑ Is access to the plant site restricted to the general public? ® ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? ® ❑ ❑ ❑ Comment. None Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ® ❑ ❑ ❑ Is all required Information readily available, complete and current? ® ❑ ❑ ❑ Are all records maintained for 3 years(lab reg required 5 years)? ® ❑ ❑ ❑ Are analytical results consistent with data reported on DM Rs? ® ❑ ❑ ❑ Is the chain-of-custody complete? ® ❑ ❑ ❑ Dates, times and location of sampling Name of Individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported CDCs Are DMRs complete do they Include all permit parameters? 0 ❑ ❑ ❑ Has the facility submitted Its annual compliance report to users and DWQ? M ❑ ❑ ❑ (If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator M ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? 0 ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? 0 ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? M ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? ® ❑ ❑ ❑ Page# 3 Permit: NC0037834 Owner-Facility: Archie Elledge VvWTP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Facility has copy of previous year's Annual Report on file for review? ® ❑ ❑ ❑ Comment: None Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ® ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? ® ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ ® ❑ Comment- None Flow Measurement- Effluent Yes No NA NE #Is flow meter used for reporting? ® ❑ ❑ ❑ Is flow meter calibrated annually? ® ❑ ❑ ❑ Is the flow meter operational? ® ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ® ❑ ❑ ❑ Comment. None Anaerobic Digester Yes No NA NE Type of operation. Floating cover Is the capacity adequate? ® ❑ ❑ ❑ #Is gas stored on site? ® ❑ ❑ ❑ Is the digester(s)free of tilting covers? ® ❑ ❑ ❑ Is the gas burner operational? ® ❑ ❑ ❑ Is the digester heated? ® ❑ ❑ ❑ Is the temperature maintained constantly? ® ❑ ❑ ❑ Is tankage available for properly waste sludge? S ❑ ❑ ❑ Comment: None Solids Handling Equipment Yes No NA NE Is the equipment operational? ■ ❑ ❑ ❑ Is the chemical feed equipment operational? ® ❑ ❑ ❑ Is storage adequate? ■ ❑ ❑ ❑ Is the site free of high level of solids In filtrate from filter presses or vacuum filters? N ❑ ❑ ❑ Is the site free of sludge buildup on belts and/or rollers of filter press? M ❑ ❑ ❑ Page# 4 Permit: NC0037834 Owner-Facility: Archie Elledge VVWT P Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Solids Handling Equipment Yes No NA NE Is the site free of excessive moisture In belt filter press sludge cake? ® ❑ ❑ ❑ The facility has an approved sludge management plan? ® ❑ ❑ ❑ Comment: None Chemical Feed Yes No NA NE Is containment adequate? ® ❑ ❑ ❑ Is storage adequate? ® ❑ ❑ ❑ Are backup pumps available? ® ❑ ❑ ❑ Is the site free of excessive leaking? ® ❑ ❑ ❑ Comment: None Bar Screens Yes No NA NE Type of bar screen a.Manual ❑ b Mechanical Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? ® ❑ ❑ ❑ Is disposal of screening in compliance? ® ❑ ❑ ❑ Is the unit In good condition? ® ❑ ❑ ❑ Comment: None Grit Removal Yes No NA NE Type of grit removal a Manual ❑ b.Mechanical Is the grit free of excessive organic matter? S ❑ ❑ ❑ Is the grit free of excessive odor? ® ❑ ❑ ❑ #Is disposal of grit In compliance? ® ❑ ❑ ❑ Comment: None Grease Removal Yes No NA NE #Is automatic grease removal present? E ❑ ❑ ❑ Is grease removal operating properly? N ❑ ❑ ❑ Page# 5 Permit: NC0037834 Owner-Facility: Archie Elledge WWTP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Grease Removal Yes No NA NE Comment: None Primary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? ® ❑ ❑ ❑ Is the site free of excessive buildup of solids In center well of circular clarifier? ® ❑ ❑ ❑ Are weirs level? ® ❑ ❑ ❑ Is the site free of weir blockage? ® ❑ ❑ ❑ Is the site free of evidence of short-circuiting? ® ❑ ❑ ❑ Is scum removal adequate? ® ❑ ❑ ❑ Is the site free of excessive floating sludge? ® ❑ ❑ ❑ Is the drive unit operational? ® ❑ ❑ ❑ Is the sludge blanket level acceptable? ® ❑ ❑ ❑ Is the sludge blanket level acceptable?(Approximately Y.of the sidewall depth) ® ❑ ❑ ❑ Comment: None Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? ® ❑ ❑ ❑ Is the site free of excessive buildup of solids In center well of circular clarifier? ® ❑ ❑ ❑ Are weirs level? ® ❑ ❑ ❑ Is the site free of weir blockage? ® ❑ ❑ ❑ Is the site free of evidence of short-circuiting? ® ❑ ❑ ❑ Is scum removal adequate? ® ❑ ❑ ❑ Is the site free of excessive floating sludge? ® ❑ ❑ ❑ Is the drive unit operational? ■ ❑ ❑ ❑ Is the return rate acceptable(low turbulence)? ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? ® ❑ ❑ ❑ Is the sludge blanket level acceptable?(Approximately'/<of the sldewall depth) ® ❑ ❑ ❑ Comment: None Aeration Basins Yes No NA NE Mode of operation Ext Air Type of aeration system Diffused Is the basin free of dead spots? ® ❑ ❑ ❑ Page# 6 Permit: NCO037834 Owner-Facility: Archie Elledge WVVTP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Aeration Basins Yes No NA NE Are surface aerators and mixers operational'? M ❑ ❑ ❑ Are the diffusers operational? ! ❑ ❑ ❑ Is the foam the proper color for the treatment process? M ❑ ❑ ❑ Does the foam cover less than 25%of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? 0 ❑ ❑ ❑ Is the DO level acceptable?(1 0 to 3 0 mg/1) ® ❑ ❑ ❑ Comment: None De-chlorination Yes No NA NE Type of system? Liquid Is the feed ratio proportional to chlorine amount(1 to 1)? ® ❑ ❑ ❑ Is storage appropriate for cylinders? ® ❑ ❑ ❑ #Is de-chlorination substance stored away from chlorine containers? ® ❑ ❑ ❑ Are the tablets the proper size and type'? ❑ ❑ ® ❑ Comment: None Are tablet de-chlorinators operational? ❑ ❑ ® ❑ Number of tubes in use? Comment: None Standby Power Yes No NA NE Is automatically activated standby power available? ® ❑ ❑ ❑ Is the generator tested by interrupting primary power source? ■ ❑ ❑ ❑ Is the generator tested under load? 0 ❑ ❑ ❑ Was generator tested&operational during the Inspection? ❑ M ❑ ❑ Do the generator(s) have adequate capacity to operate the entire wastewater site? ® ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up power? M ❑ ❑ ❑ Is the generator fuel level monitored? M ❑ ❑ ❑ Comment: None Pumps-RAS-WAS Yes No NA NE Are pumps in place? e ❑ ❑ ❑ Are pumps operational? ■ ❑ ❑ ❑ Are there adequate spare parts and supplies on site? ® ❑ ❑ ❑ Page# 7 Permit: NCO037834 Owner-Facility: Archie Elledge VW TP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Pumps-RAS-WAS Yes No NA NE Comment: None Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? ® ❑ ❑ ❑ Are all other parameters(excluding field parameters)performed by a certified lab? ■ ❑ ❑ ❑ #Is the facility using a contract lab? ® ❑ ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees ® ❑ ❑ ❑ Celsius)? Incubator(Fecal Coliform)set to 44 5 degrees Celsius+/-0 2 degrees? ■ ❑ ❑ ❑ Incubator(BOD)set to 20 0 degrees Celsius+/-1 0 degrees? ® ❑ ❑ ❑ Comment: None Disinfection-Liquid Yes No NA NE Is there adequate reserve supply of disinfectant? ® ❑ ❑ ❑ (Sodium Hypochlorite) Is pump feed system operational? ® ❑ ❑ ❑ Is bulk storage tank containment area adequate?(free of leaks/open drains) ® ❑ ❑ ❑ Is the level of chlorine residual acceptable? ® ❑ ❑ ❑ Is the contact chamber free of growth, or sludge buildup? ■ ❑ ❑ ❑ Is there chlorine residual prior to de-chlorination? ® ❑ ❑ ❑ Comment, None Influent Sampling Yes No NA NE #Is composite sampling flow proportional'? ® ❑ ❑ ❑ Is sample collected above side streams? 0 ❑ ❑ ❑ Is proper volume collected? ® ❑ ❑ ❑ Is the tubing clean? N ❑• ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees i ❑ ❑ ❑ Celsius)? Is sampling performed according to the permit? ® ❑ ❑ ❑ Comment. None Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? ® ❑ ❑ ❑ Page# 8 Permit: NCO037834 Owner-Facility: Archie Elledge WWTP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Effluent Sampling Yes No NA NE Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? ■ ❑ ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees 0 ❑ ❑ ❑ Celsius)? Is the facility sampling performed as required by the permit(frequency, sampling type M ❑ ❑ ❑ representative)? Comment: None Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit(frequency, sampling type, and ® ❑ ❑ ❑ sampling location)? Comment: None Page# 9 United States Environmental Protection Agency Form Approved EPA Washington,D C 20460 OMB No 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A.National Data System Coding(i.e.,PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 15 1 3 I NC0050342 I11 12 16/02/18 17 18 C 19 1G 201 I 21 -1 I I I 1 I I I I 11 I L I I I I I I I I I I I I I I I I I I I I I 11 I I l i _I_ 166 Inspection Work Days Facility Self-Monitoring Evaluation Rating 131 QA -----------------Reserved------------ 67 70 u 71 L] 72 I-1 I I I N ] 73 I I 174 75 I 1 180 Section B-Facility Data Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10 OOAM 16/02/18 09/09/01 Muddy Creek WWrP Exit Time/Date Permit Expiration Date 4561 Cooper Rd 12 OOPM 16/02/18 14!06/30 Winston Salem NC 27102 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Ozie Keith Jones/ORC/336-397-7679/ Name,Address of Responsible Official Title/Phone and Fax Number Contacted David K Saunders,PO Box 2511 Winston Salem NC No 271079998/Director/336-727-8418/ Section C Areas Evaluated During Inspection(Check only those areas evaluated) ® Permit ® Flow Measurement ® Operations&Maintenance ® Records/Reports Self-Monitoring Program E Sludge Handling Disposal ® Facility Site Review ® Effluent/Receiving Waters Laboratory Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date Ron Boone WSRO WQ!/336-776-9690/ 2/2 �6 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3(Rev 9-94)Previous editions are obsolete Page# 1 NPDES yr/mo/day Inspection Type 31 NCO050342 I� 12 16/02/18 17 18 ,1 Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) Please refer to the attached inspection'summary letter Page# 2 Permit: NCO050342 Owner-Facility: Muddy CreekWWTP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? ® ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable 0 ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: None Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Is the facility as described in the permit? ® ❑ ❑ ❑ #Are there any special conditions for the permit? ❑ ® ❑ ❑ Is access to the plant site restricted to the general public? ® ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: None Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years(lab. reg required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain-of-custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported CDCs Are DMRs complete. do they include all permit parameters? 0 ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? 0 ❑ ❑ ❑ (If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator 0 ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? 0 ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? 0 ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? 0 ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Page# 3 Permit: NC0050342 Owner-Facility: Muddy Creek VNNFP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Facility has copy of previous year's Annual Report on file for review? ■ ❑ ❑ ❑ Comment: None Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ® ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? ® ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ ■ ❑ Comment: None Flow Measurement- Effluent Yes No NA NE #Is flow meter used for reporting? ® ❑ ❑ ❑ Is flow meter calibrated annually? ® ❑ ❑ ❑ Is the flow meter operational? ■ ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter's ® ❑ ❑ ❑ Comment: None Anaerobic Digester Yes No NA NE Type of operation: Floating cover Is the capacity adequate?_ ® ❑ ❑ ❑ #Is gas stored on site? ® ❑ ❑ ❑ Is the digester(s)free of tilting covers? ® ❑ ❑ ❑ Is the gas burner operational? ® ❑ ❑ ❑ Is the digester heated? ® ❑ ❑ ❑ Is the temperature maintained constantly? ® ❑ ❑ ❑ Is tankage available for properly waste sludge? ® ❑ ❑ ❑ Comment None Pump Station - Effluent Yes No NA NE Is the pump wet well free of bypass Imes or structures? ® ❑ ❑ ❑ Are all pumps present? N ❑ ❑ ❑ Are all pumps operable? ■ ❑ ❑ ❑ Are float controls operable? N ❑ ❑ ❑ Is SCADA telemetry available and operational? ® ❑ ❑ ❑ Page# 4 Permit: NC0050342 Owner-Facility: Muddy Creek WWTP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Pump Station - Effluent Yes No NA NE Is audible and visual alarm available and operational? ® ❑ ❑ ❑ Comment None Bar Screens Yes No NA NE Type of bar screen a.Manual ❑ b Mechanical Are the bars adequately screening debris? ® ❑ ❑ ❑ Is the screen free of excessive debris? ® ❑ ❑ ❑ Is disposal of screening In compliance? ® ❑ ❑ ❑ Is the unit in good condition? ® ❑ ❑ ❑ Comment: None Grit Removal Yes No NA NE Type of grit removal a.Manual ❑ b.Mechanlcal Is the grit free of excessive organic matter? ® ❑ ❑ ❑ Is the grit free of excessive odor? ® ❑ ❑ ❑ #Is disposal of grit In compliance? ® ❑ ❑ ❑ Comment: None Grease Removal Yes No NA NE #Is automatic grease removal present? ■ ❑ ❑ ❑ Is grease removal operating properly? N ❑' ❑ ❑ Comment: None Primary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? ® ❑ ❑ ❑ Is the site free of excessive buildup of solids In center well of circular clarifier? ❑ ❑ 0 ❑ Are weirs level? ■ ❑ ❑ ❑ Is the site free of weir blockage? ■ ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Page# 5 Permit: NCO050342 Owner-Facility: Muddy Creek WVVFP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Primary Clarifier Yes No NA NE Is scum removal adequate? ® ❑ ❑ ❑ Is the site free of excessive floating sludge? ® ❑ ❑ ❑ Is the drive unit operational? ® ❑ ❑ ❑ Is the sludge blanket level acceptable? ❑ ❑ ❑ ❑ Is the sludge blanket level acceptable?(Approximately''/<of the sldewall depth) ® ❑ ❑ ❑ Comment: None Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? ® ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? ® ❑ ❑ ❑ Are weirs level? ® ❑ ❑ ❑ Is the site free of weir blockage? ® ❑ ❑ ❑ Is the site free of evidence of short-circuiting? ® ❑ ❑ ❑ Is scum removal adequate? ® ❑ ❑ ❑ Is the site free of excessive floating sludge? ® ❑ ❑ ❑ Is the drive unit operational? ® ❑ ❑ ❑ Is the return rate acceptable(low turbulence)? ® ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? ® ❑ ❑ ❑ Is the sludge blanket level-acceptable?(Approximately'/<of the sldewall depth) ® ❑ ❑ ❑ Comment: None Aeration Basins Yes No NA NE Mode of operation Ext Air Type of aeration system Diffused Is the basin free of dead spots? M ❑ ❑ ❑ Are surface aerators and mixers operational? E ❑ ❑ ❑ Are the diffusers operational? E ❑ ❑ ❑ Is the foam the proper color for the treatment process? N ❑ ❑ ❑ Does the foam cover less than 25%of the basin's surface? ® ❑ ❑ ❑ Is the DO level acceptable? ❑ ❑ ❑ Is the DO level acceptable?(1 0 to 3.0 mg/1) ❑ ❑ ❑ Comment: None Page# 6 Permit: NCO050342 Owner-Facility: Muddy Creek WWTP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation De-chlorination Yes No NA NE Type of system? Liquid Is the feed ratio proportional to chlorine amount(1 to 1)? ® ❑ ❑ ❑ Is storage appropriate for cylinders? ■ ❑ ❑ ❑ #Is de-chlorination substance stored away from chlorine containers? ® ❑ ❑ ❑ Are the tablets the proper size and type? ❑ ❑ ® ❑ Comment: None Are tablet de-chlorinators operational? ❑ ❑ ® ❑ Number of tubes in use? Comment: None Standby Power Yes No NA NE Is automatically activated standby power available? ® ❑ ❑ ❑ Is the generator tested by Interrupting primary power source? ® ❑ ❑ ❑ Is the generator tested under load? ® ❑ ❑ ❑ Was generator tested&operational during the inspection? ❑ ® ❑ ❑ Do the generator(s) have adequate capacity to operate the entire wastewater site? ® ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up power? ® ❑ ❑ ❑ Is the generator fuel level monitored? ® ❑ ❑ ❑ Comment- None Pumps-RAS-WAS Yes No NA NE Are pumps In place? ® ❑ ❑ ❑ Are pumps operational? ® ❑ ❑ ❑ Are there adequate spare parts and supplies on site? ® ❑ ❑ ❑ Comment: None Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? ■ ❑ ❑ ❑ Are all other parameters(excluding field parameters)performed by a certified lab? ■ ❑ ❑ ❑ #Is the facility using a contract lab? ■ ❑ ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees 'M ❑ ❑ ❑ Celsius)? Incubator(Fecal Coliform)set to 44.5 degrees Celsius+/-0 2 degrees? M ❑ ❑ ❑ Page# 7 Permit: NCO050342 Owner-Facility: Muddy CreekVWVTP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Laboratory Yes No NA NE Incubator(BOD)set to 20 0 degrees Celsius+/-1.0 degrees? ■ ❑ ❑ ❑ Comment- None Disinfection-Liquid Yes No NA NE Is there adequate reserve supply of disinfectant? ® ❑ ❑ ❑ (Sodium Hypochlorite) Is pump feed system operational? ® ❑ ❑ ❑ Is bulk storage tank containment area adequate?(free of leaks/open drains) ® ❑ ❑ ❑ Is the level of chlorine residual acceptable? ■ ❑ ❑ ❑ Is the contact chamber free of growth, or sludge buildup? ® ❑ ❑ ❑ Is there chlorine residual prior to de-chlorination? ® ❑ ❑ ❑ Comment: None Influent Sampling Yes No NA NE #Is composite sampling flow proportional? ® ❑ ❑ ❑ Is sample collected above side streams? ® ❑ ❑ ❑ Is proper volume collected? ■ ❑ ❑ ❑ Is the tubing clean? ® ❑ ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees ® ❑ ❑ ❑ Celsius)? Is sampling performed according to the permit? ® ❑ ❑ ❑ Comment: None Effluent Sampling Yes No NA NE Is composite sampling flow proportional? ® ❑ ❑ ❑ Is sample collected below all treatment units? ® ❑ ❑ ❑ Is proper volume collected? ® ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees ❑ ❑ ❑ Celsius)? Is the facility sampling performed as required by the permit(frequency, sampling type ® ❑ ❑ ❑ representative)? Comment: None Upstream/ Downstream Sampling Yes No NA NE Page# 8 Permit: NC0050342 Owner-Facility: Muddy Creek VNNTP Inspection Date: 02/18/2016 Inspection Type: Compliance Evaluation Upstream/Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit(frequency, sampling type, and ® ❑ ❑ ❑ sampling location)? Comment: None Page# 9