Loading...
HomeMy WebLinkAboutHammock Watch HOA DCM 85-22Permit Class NEW Permit Number 85-22 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ertnt" t for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Hammocks Watch HOA, Inc., PO Box 12051, Wilmington, NC 28405 Authorizing development in Pender County at adj. to AIWW and 176 Hammocks Watch Way in Hampstead , as requested in the permittee's application dated 3/11/22 (MP- 1 & MP-4), including work plan drawings (3) Sheet I of 3 dated 2/10/22, and Sheets 2-3 of 3 dated 3/11/22. This permit, issued on August 15, 2022 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) This permit authorizes only the piers, docks, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 2) This permit authorizes 4 additional formalized boat slips for a maximum of 9 formalized boat slips at this docking facility. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on August 15, 2027 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. For Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Hammocks Watch HOA, Inc. ADDITIONAL CONDITIONS Permit No. 85-22 Page 2 of 3 3) All portions of the authorized structure shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's area of riparian access. 4) No portion of the authorized docking facility shall extend more than one quarter of the width of the water body. Measurements to determine width of the water body shall be made from the normal high-water line or the waterward edge of any coastal wetland vegetation which borders the water body, whichever is more restrictive. 5) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 7) The authorized structure and associated activity shall not cause an unacceptable interference with navigation and shall not exceed the dimensions shown on the attached permit drawings. Deed Restriction 8) 15A NCAC 07H .0208(b)(6)(D) of the Rules of the Coastal Resources Commission require that the combined area of all "T"s, finger piers, platforms, and decks not exceed a combined total area of eight square feet per linear foot of shoreline. In order to ensure consistency with this requirement, a deed restriction shall be placed on Lots 1-4 dedicating the entire shoreline of this lot to the proposed community access facility. The deed restriction shall further state that no T's, finger piers, platforms, or decks shall be allowed off of Lots 1-4 in the future as long as the permitted access facility is in place. This deed restriction shall be recorded with the Pender County Register of Deeds, and copies of the recorded deeds provided to the Division of Coastal Management, prior to the initiation of construction of the access facility. Sedimentation and Erosion Control 9) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 10) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. General 11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third parry without the written approval of the Division of Coastal Management. 12) All construction debris associated with the removal or construction of the permitted docking facilities shall be contained within the authorized project area and disposed of in an approved upland location. Hammocks Watch HOA, Inc. ADDITIONAL CONDITIONS Permit No. 85-22 Page 3 of 3 13) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. including but not limited to any authorizations required from the U.S. Army Corps of Engineers. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4501 and assigned the project DWR Project No. 20210434v2. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the mean high-water level. NOTE: An application processing fee of $250 was received by DCM for this project.