November 5, 2024
Jason S. Johnson
1135 Robeson Street
Fayetteville, NC 28305
Subject: Compliance Evaluation Inspection-Non-Compliance Status
State Stormwater Management Permit SW6120504
Valley End
High Density Subdivision Wet Detention Basin Project
Cumberland County
Dear Mr. Johnson:
On October 11, 2024, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy,
Mineral and Land Resources (DEMLR), conducted a Compliance Evaluation Inspection at the Valley End
facility, located at Mission Hill Road, in Hope Mills, in Cumberland County, North Carolina. The purpose of
the inspection was to ensure compliance with State Stormwater Management Permit SW6120504 that
was issued on July 3, 2012. A copy of the Compliance inspection Report is enclosed for your review. As a
result of the inspection and subsequent file review, it has been determined that the facility is Not
Compliant with the conditions of the subject permit and approved plans.
The required actions that are necessary to bring this site into compliance are noted under the Inspection
Summary and Comments sections of the report. If you have any questions or this office can be of any
assistance, please contact me at (910) 433-3384 or by e-mail at melissa.joyner@deq.nc.gov
Sincerely,
Melissa Joyner
Environmental Senior Specialist
Enclosure: Non-Compliant Compliance Evaluation Inspection Report
ec: Jeff Nobles, P.E. — Larry King &Associates, R.L.S., P.A.
Benjamin Stout, Managing Member—Stout Land Development Co., LLC
cc: FRO— DEMLR, State Stormwater Files, SW6120504
D E Q North Carolina pepartment of Environmental Qual€ty 1 Division of Energy,Mineral and Land Resources
Fayetteville Regional Off ice 1 225 Green Street,Suite 7141 Fayetteville,North Carolina 28301
W9n+cfaxna
+dW� /� 910.433.3300
Compliance Inspection Report
Permit: SW6120504 Effective: 07/03/12 Expiration: 07/02/20
Project: Valley End
Owner: St James Square Inc
County: Cumberland Adress: Mission Hill Rd
Region: Fayetteville
City/State/Zip: Hope Mills NC 28348
Contact Person:Jason S Johnson Title: Phone:910-438-0796
Directions to Project:
Type of Project: State Stormwater-HD - Detention Pond
Drain Areas: 001 -(Rockfish Creek[(Upchurches Pond, Old Brower Mill Pond (Number Two L
002 -(Rockfish Creek [(Upchurches Pond, Old Brower Mill Pond (Number Two L
003-(Rockfish Creek [(Upchurches Pond, Old Brower Mill Pond (Number Two L
On-Site Representative(s):
Related Permits:
Inspection Date: 10/11/2024 ,Entry Time 12:05PM Exit Time: 12:35PM
Primary Inspector: Melissa A Joyner �h[ a' 'Ja� Prone:
Secondary Inspector(s):
Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant 0 Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
page 1
Permit: SW6120504 Owner-Project: St James Square Inc
Inspection bate: 10/11/2024 inspection Type Compliance Evaluation Reason for Visit: Fallow-up
Inspection Summary.
Ponds A, B and C were reinspected. Pond A: Corrective actions have occurred since the previous inspection in
regards to repair of erosion on the forebay berm, the removal of a sediment plume in the permanent pond and
the repair of the skimmer. Additional permanent groundcover was also observed. There were bare slopes noted
adjacent to the northern outfall. There were also bare slopes with gully eroson adjacent to and uphill of the
eastern outfall. The aforementioned bare slopes will need to be regraded/stabilized with permanent
groundcover. The forebay berm had bare slopes which needed to be stabilized with groundcover. Riprap had
been dislodged with the liner exposed. The riprap will need replacement.;Pond B: The vegetation on the lower
slopes appeared dead and will need overseeding. Baffles and a skimmer should be installed because houses
are being developed upslope of this Pond; Pond C: There were still cattails growing in the pond and vegetation
was still growing in the riser. It is recommended to remove the silt fence which is around the drop inlet near this
Pond.
Appropriate maintenance must be conducted on all components of the permitted stormwater control measures
per the conditions of the permit and/or Stormwater Design Manual to ensure proper operation and to meet
approved design criteria. This includes proper vegetation management, and repair and stabilization of any
eroded areas. The permit was issued on July 3, 2012 and expired on July 2, 2020. A permit renewal application
has not been submitted at least 180 days prior to this expiration date. This needs to occur as soon as possible.
A completed Designer's Certification must be submitted for the file. There is now a new owner of this permit and
the permit will need to be transferred to the new owner after the compliance issues are addressed. Please go to
the following link to initiate this process.
https://www.deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater-program/pos
t-construction-program/permit-transfers-renewals
The facility is not in compliance with the conditions of the subject permit, SW6120504, and the approved plans
due to the aforementioned issues.
page 2
Permit: SW6120504 Owner-Project: St James Square Inc
Inspection Date: 10/11/2024 Inspection Type Compliance Evaluation Reason for Visit: Follow-up
File Review Yes No NA NE
Is the permit active? ■ ❑ ❑ ❑
Signed copy of the Engineer's certification is in the fife? ❑ M ❑ ❑
Signed copy of the Operation & Maintenance Agreement is in the file? 0 ❑ ❑ ❑
Copy of the recorded deed restrictions is in the file? 0 ❑ ❑ ❑
Comment: There is no signed copy of the Engineer's certification on file.
_Built Upon Area Yes No NA NE
Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑
Is the drainage area as per the permit and approved plans? M ❑ ❑ ❑
Is the BUA(as permitted)graded such that the runoff drains to the system? M ❑ ❑ ❑
Comment:
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? ■ ❑ ❑ ❑
Are the inlets located per the approved plans? M ❑ ❑ ❑
Are the outlet structures located per the approved plans? ■ ❑ ❑ ❑
Comment:
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ❑ M ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or ❑ ❑ ❑ ■
provided to DWQ upon request?
Comment: There are maintenance issues associated with Ponds A B and C which need to be addressed.
Please refer to the inspection Summary for additional details.
Other Permit Conditions Yes No NA NE
Is the site compliant with other conditions of the permit? ❑ M ❑ ❑
Comment: A permit renewal application has not been submitted at least 180 days prior to the expiration
date of the permit which expired on July 2, 2020. There is a new owner of this permit and the
permit needs to be transferred to the new owner.
Other WQ Issues Yes No NA NE
Is the site compliant with other water quality issues as noted during the inspection? M ❑ ❑ ❑
Comment: