Loading...
HomeMy WebLinkAboutSW3240603_Response To Comments_20241023 EAGLE ENGINEERING Creating Communities.Together. October 23, 2024 NCDEQ—STATE STORMWATER RE: Cottages at Wingate—Phase 2 Jurisdictional Project ID: SW3240603 We are in receipt of your 2'review comments for Cottages at Wingate, located in Wingate,NC. Please find responses to the requested information below. STATE STORMWATER DEPARTMENT Contact:Jacob Beeker 1) The electronic files associated with this project could not be found in the electronic repository. Please upload the files,as required by 15A NCAC 02H .1042(2).Electronic copies should be uploaded at the following location: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload. -* Electronic files have been uploaded to NC Stormwater—Supplemental Information Upload site. 2) 15A NCAC 02H.1040(1) and .1042(2)(b)(ii): The Application, O&M Agreement, and Deed Restrictions were signed by Chris Robusto; however, the provided documentation from the NC Secretary of State does not identify Mr. Robusto as a member or manager of this LLC. In the case of a limited liability corporation(LLC),the application must be signed by a manager or company official as defined in GS 57D. Please either: a) Provide official documentation showing that Mr. Robusto is a Member or Manager and authorized to sign for the LLC; or b) Have one of the identified members of the LLC sign the application documents; or c) The signature by other agents shall be accepted on the application only if accompanied by a letter of authorization signed by the appropriate authority. Provide a letter of authorization from one of the identified manager of this LLC authorizing Mr. Robusto to sign on their behalf. —> A"Written Consent to Action of the Manager of Dream Finders Homes LLC"has been compiled to authorize Jeff Ott as being authorized to sign on behalf of Dream Finders Homes LLC. Mr. Ott has been added to, and signed, all required forms. 3) Plans: 2x hard copies of revised plan sheets with the following corrections made, as required by 15A NCAC 02H .1042(2)(g) and Section VI, 8 of the Application: a) Please delineate the project area with bearings and distances on the main set of plans, as required by Section VI, 8i of the Application. The current area delineated appears to include Phase 1. —> Bearings and distances have been added to the Phase 1 boundary. Please see sheet C-2.0, the Overall Site Plan for further detail. 4) O&M Agreement: lx original, signed & notarized hard copy of the O&M Agreement Form, as required by 15A NCAC 02H .1042(2)(j)and Sections V&VI, 3 of the Application: a) If the signing official is changed,please submit a new O&M form with the new signature. —> The signing official has been changed to Jeff Ott, and he has re-signed the O&M form. EAGLE ENGINEERING,INC. 2013-A Van Buren Avenue Indian Trail,NC 28079 Ph 704 882 4222 www.eagleonline.net Cottages at Wingate—Phase 2 Page 2 Wingate,NC Jurisdictional Project ID: SW3240603 If you have any questions,please do not hesitate to contact our office. Sincerely, Eagle Engineering Inc. Michael Prophet Project Manager Civil Division EAGLE ENGINEERING,INC. 2013-A Van Buren Avenue Indian Trail,NC 28079 Ph 704 882 4222 www.eagleonline.net