HomeMy WebLinkAboutNCC203571_NOT Signed Certification_20241031 NCGO1 Notice of Termination (NOT) Certification Form
Directions:
Print this form,complete,scan and upload to the electronic NOT(Rescission)form.
Then,mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral& Land Resources Stormwater Program
512 N.Salisbury Street,6th Floor
1612 Mail Service Center
= Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL)[40 CFR 122.221
General Permit Certificate of Coverage (COC) No.: IVw 2.0 3c7/
S,/vet lief / ct Tt'"
Name of Project: C — ��''��� �i/� ���G �� � e;''I
Per NC General Statute 143-215.6E(i),any person who knowingly makes any false statement,representation,or
certification in any application,record,report,plan,or other document filed or required to be maintained under this
Article or a rule implementing this Article...shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars($10,000).
Under penalty of law,I certify that:
I,as an authorized representative,hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge
and belief,such information is true,complete,and accurate. ' / /
Legally Responsible Organizational Entity(must match eNOT): C4..0 4 �f L, z/�
*Legally Responsible Person(must match eNOT): Ad."
*Title 4.-
*Title of Legally Responsible Person: AL'A ver l SSn i�
Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person:
*Signature: Date: /2/.3,/20.2,V
*IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity,such as a president,secretary, treasurer,or vice president,or a manager that is authorized in
accordance with Part IV,Section B,Item(6)of the NCG010000 permit.
For more information on signatory requirements,see Part IV,Section B,Item(6)of the NCG010000 permit.