UNIONCOUNTY
s,cr+rIWAT�P-'Q/DWR
Transmittal �z
WQ.P,OS
To: NC Department of Environmental Quality MOORESViLLE REGIONAL OFFICE
Division of Water Resources- Mooresville Regional Office
610 East Center Avenue
Mooresville, N.C. 28115
-21
Attention: Date: October)9,,2024
Regarding: Sanitary Sewer to serve LUNA ESTATES SUBDIVISION
We are sending you: ❑ Copy of letter ❑ Prints ® Other
❑ Plans ❑ Shop Drawings
Copies Date No. Description
1 08/21/24 Cover Letter
1 10/21/24 Fast Track Application(FTA 10-23)
1 10/21/24 Copy of Fast Track Application
1 ea USGS Topo Map& Street Level Map
1 09/16/24 Flow Tracking Form(FTSE 10-23)-UCW
1 09/16/24 UC Letter of Acceptance of for Non-Discharge Application
1 10/08/24 Flow Tracking Form(FTSE 10-23)—Charlotte Water
1 10/09/24 CW Water&Sewer Flow Acceptance Letter
1 08/06/24 562199 $600.00 Check(Application Fee)
These are transmitted and checked below:
For approval ❑ For your ❑ As requested ® For review and comment
use
Remarks:
Signed: Bill Recher
Received by: Date:
Union County Water
500 N. Main Street
Monroe, NC 28112
T 704.296.4210
unioncountync.gov/water
v MCKIM&CREED ENGINEERS
v
S U R V E Y O R S
PLANNERS
RECEIVED,NC.EQ/DWR
FTA Narrative 0 C T � ;921
August 21, 2024
WG.P,C)S
Luna Estates Subdivision MOORES`viLLE REGIONAL OFFICE
Town of Weddington
Toll Southeast LP Company, Inc. is proposing to construct an 18 lot single family
residential community located off of Weddington Matthews Road at the
intersection with Cox Road,Town of Weddington,Union County,NC. The nature
of this FTA submittal is to permit a public system consisting of gravity sewer to
service the proposed subdivision.
Toll Southeast LP Company,Inc.will install and Union County Public Works will
maintain the gravity sewer within the community. The system will go to the
McAlpine Creek Wastewater Treatment Plant owned by the City of Charlotte.
They will accept the sewer flow (3,420 GPD, 18 lots at 190 GPD) from the
subdivision. The project will convey gravity sewer flows to an existing manhole
located within the Delaney Drive right of way.
The proposed 8" PVC / 8" DIP gravity sewer will be installed throughout the
proposed development, which will provide public sewer access to the 18
residential units. The new gravity system is designed in accordance with NCDEQ
minimum design criteria. Appropriate horizontal and vertical clearances will be
provided when proximal to the proposed storm drainage system and the proposed
water system. The gravity sewer will be certified in accordance with the state
regulations and the permit conditions.
8020 Tower Point Drive
Charlotte, NC 28227
704.841 .2588
Fax 704.841 .2567
www.mckimcreed.com
State of North Carolina
Department of Environmental Quality
DWR Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23&SUPPORTING DOCUMENTATION
Application Number: "�� 3 (to be completed by DwR) RECEIVED,NCf)EQ/DWR
All items must be completed or the application will be returned
1. APPLICANT INFORMATION: U+QP,OS
MOORESVILLE REGIONAL(37ICE
1. Applicant's name: Union County Public Works(company,municipality, HOA,utility,etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately-Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑ Other
3. Signature authority's name: Crystal O. Panico. PE per 15A NCAC 02T.0106(b)
Title:New Development Project Manager-Union County Public Works
4. Applicant's mailing address: 500 N. Main Street: Suite 47
City: Monroe State:NC Zip:28112-
5. Applicant's contact information:
Phone number:(104)283-3816 Email Address: crystal.panicol�d,)unioncoun, nc.gov
11. PROJECT INFORMATION:
I. Project name: Luna Estates Subdivision
2. Application/Project status: ® Proposed(New Permit) ❑ Existing Permit/Project ❑ ARPA funded
If a modification,provide the existing permit number: WQ00 and issued date:
For modifications,also attach a detailed narrative description as described in Item G of the checklist.
If new construction,but part of a master plan,provide the existing permit number: WQ00
3. County where project is located: Union County
4. Approximate Coordinates(Decimal Degrees): Latitude: 35.0311' Longitude:-80.7455'
5. Parcel ID(if applicable): 06123012&0612301 C(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer:Tracey M. McCormick License Number:041683
Firm: McKim&Creed
Mailing address: 8020 Tower Point Drive
City:Charlotte State:NC Zip:28227-
Phone number:(704)841-2588 Email Address:tmccormick@mckimcreed.com
IV. WASTEWATER TREATMENT FACILITY(WWTF) INFORMATION:
1. Facility Name: McAlpine Creek Permit Number:NCO024970
Owner Name: Charlotte Mecklenburg Utility Department
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s): WQ0031776
2. Downstream(Receiving)Sewer Information: 16 inch Z Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s)(if applicable): WQCS0024183
Owner Name(s): Union County Public Works
FORM: FTA 10-23 Page I of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
❑ Yes [:]No ®N/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM: DEV)been attached?
[—] Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement(FORM: HOA)and
supplementary documentation as required by 15A NCAC 02T.0I 15(c)been attached?
[:] Yes ❑No ®N/A
4. Origin of wastewater:(check all that apply):
®Residential(Individually Owned) ❑ Retail(stores,centers,malls) ❑Car Wash
❑Residential(Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑School/preschool/day care ❑ Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse
❑Food and drink facilities ❑Church ❑ Swimming Pool/Filter Backwash
❑ Businesses/offices/factories ❑Nursing Home ❑Other(Explain in Attachment)
5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial, is there a Pretreatment Program in effect?❑ Yes❑No
6. Hasa flow reduction been approved under 15A NCAC 02T.0114(f)? [] Yes ®No
➢ If yes,provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0114(f)) Daily Design Flow a,n No.of Units Flow
Single Family Residential 190 gal/day 18 3,1420 GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
Total 3,420 GPD
a See 15A NCAC 02T.0114(b), (d), (e)(1)and (e)(2)for caveats to wastewater design flow rates(i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4).
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.0114] shall be
determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data.
8. Wastewater generated by project: 3,420 GPD(per 15A NCAC 02T.0114 and G.S. 143-215.1)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero,please indicate why:
❑Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑Other(Explain):
FORM: FTA 10-23 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305& MDC(Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size(inches) Length (feet) Material
8 508 SDR-35
8 80 DIP
8 1,353 SDR-25
➢ Section II& III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable)—02T.0305& MDC(Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates(Decimal Degrees): Latitude: 0 Longitude:- °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length(feet) Material
If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per
MDCPSFM Section 2.01 C.Lb. ❑Grinder Pump ❑ Mechanical Bar Screen ❑ Other(please specify)
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
❑ Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 3 of 5
IX. SETBACKS&SEPARATIONS—(02B.0200& 15A NCAC 02T.0305(f)):
I. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(f)&(g)? ® Yes ❑No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
'Water mains(vertical-water over sewer preferred, including in benched trenches) 18 inches
'Water mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
**Waters classified WS(except WS-I or WS-V), B, SA,ORW, HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
**Any other stream, lake, impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(f)or(g),see Section X.1 of this application
*15A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(fl cannot be achieved. Please check"yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpaee
2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑No ❑N/A
➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ® Yes ❑No ❑N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ®Yes Basin name:Catawba ❑No
If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02B.0200? ® Yes ❑No
➢ This includes Trout Buffered Streams per 15A NCAC 213.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ®No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ® Yes ❑No
Per 15A NCAC 02T.0 I 05(c)(6),directly related environmental permits or certification applications must be being prepared,
have been applied for,or have been obtained. Issuance of this permit is contingent on issuance of dependent permits(erosion
and sedimentation control plans,stormwater management plans,etc.).
7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑ Yes ®No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes, include an attachment with details for each line, including type(aerial line,size,material,and location).
High priority lines shall be inspected by the permittee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection perm it.
FORM: FTA 10-23 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T,the Minimum Design Criteria for the Permitting_of Pump Stations
and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria(latest version)as applicable?
® Yes ❑No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit and projects requiring a variance approval may be subject to longer
review times For projects requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the project,the full technical review is required.
2. Profession I Engineer's Certification:
n�^ C' .S
I, �l.C/ attest that this application for
(Profess onal Engineer' name from Application Item 111.1.) (Project Name from Application Item Il.1)
has been reviewe by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers(latest version),and the Minimum Design Criteria for the Fast-Track Permitting
of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation.Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board.(21 NCAC 56.0701)
.........................`z.t..i.z.i.zz... ..t.......................:........
North Carolina Professional Engineer's seal,signature,and date:
`•��N CARO
?� •FEssi°;11. ti9
- SE
0 1' 3 -
McGO
3. Applicant's Certification per 15A NCAC 02T.0106(b):
1, �/ R.{ �C/ �ltiLl�la ,attest that this application for F5�
(Signatur Authority ame from Application Item 1.3.) (Project Name from Application Item Il.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation.
Signature: Date: ! ��
FORM: FTA 10-23 Page 5 of 5
CYOP State of North Carolina
Department of Environmental Quality
DWRDivision of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources INSTRUCTIONS FOR FORM: FTA 10-23&SUPPORTING DOCUMENTATION
This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been
certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's
Minimum Design Criteria(Gravity Sewer& Pump Stations/Force Mains)and that plans,specifications and supporting documents
have been prepared in accordance with 15A NCAC 02T,15A NCAC 02T.0300.Division policies,and good engineering practices.
While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design
documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design
calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These
documents shall be immediately available upon request by the Division.
Projects that are deemed permitted(do not require a permit from the Division)are explained in 15A NCAC 02T.0303.
Projects not eligible for review via the fast track process(must be submitted for full technical review):
➢ Projects that do not meet any part of the minimum design criteria(MDC)documents;
➢ Projects that involve more than one variance from the requirements of 15A NCAC 02T;
➢ Pressure sewer systems utilizing simplex septic tank-effluent pumps(STEPs)or simplex grinder pumps;
➢ Simplex STEP or simplex grinder pumps connecting to pressurized systems(e.g. force mains);
➢ Vacuum sewer systems.
General—When submitting an application,please use the following instructions as a checklist in order to ensure all required items are
submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the
amount of requested additional information. Failure to submit all required items will necessitate additional processing and review
time,and may result in return of the application. Unless otherwise noted,the Applicant shall submit one original and one copy of
the application and supporting documentation.
A. One Original and One Copy(second copy may be digital)of Application and Supporting Documents
® Required unless otherwise noted. Signatures on original must be"wet ink"or secure digital signatures.
Please do not submit engineering design plans with the application unless specifically requested.
B. Cover Letter/Narrative Description(Required for All Application Packages):
® List all items included in the application package,as well as a brief description of the requested permitting action.
➢ Be specific as to the system type,number of homes served,flow allocation required,etc.
➢ Include the permit number/status of any other required sewer permits(downstream/upstream)
➢ If necessary for clarity, include attachments to the application form.
➢ If the project is funded by American Rescue Plan Act(ARPA) funds, please include the ARPA project number in the cover
letter and in parentheses under Project Name(Section II.1. of the application).
C. Application Fee(All New and Modification Application Packages):
® Submit a check or money order in the amount of$600.00,dated no more than 90 days prior to application submittal.
➢ Payable to North Carolina Department of Environmental Quality(NCDEQ)
D. Fast Track Application(Required for All Application Packages,Form FTA 10-23):
® Submit the completed and appropriately executed application.
➢ If necessary for clarity or due to space restrictions,attachments to the application may be made.
❑ If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the
North Carolina Secretary of State.
❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in
the county of business.
® The Project Name in Item [L I shall be consistent with the project name on the flow acceptance letters,agreements,etc.
® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina
licensed Professional Engineer.
INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 1 of 3
® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T.0106(b). Per
15A NCAC 02T.0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from
a person who meets the criteria in 15A NCAC 02T.0106(b).
E. Flow Tracking/Acceptance Form (Form: FTSE 10-23)(If Applicable):
® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility.
➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different.
➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year
prior to the application date.
➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a).
➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project-specific FTSE.
F. Site Maps(All Application Packages):
® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area,
including the closest surface waters.
➢ General location of the project components(gravity sewer,pump stations,&force main)
➢ Downstream connection points and permit number(if known)for the receiving sewer
® Include an aerial location map showing general project area(such as street names or latitude/longitude)so that Division staff
can easily locate it in the field.
G. Existing Permit(Application Packages for Modifications to an Existing Permit):
❑ Submit a copy of the most recently issued existing permit.
❑ Include a descriptive and clear narrative identifying the previously permitted items to remain in the permit,items to be
added,and/or items to be modified(the application form itself should include only include items to be added/modified).The
narrative should also include whether any previously permitted items have been certified.
❑ The narrative should clearly identify the requested permitting action and accurately describe the sewers to be listed in
the final permit.
H. Power Reliability Plan(Required if portable reliability option utilized for Pump Station):
❑ Per 15A NCAC 02T.0305(h)(1), submit documentation of power reliability for pumping stations.
➢ This alternative is only available for average daily flows less than 15,000 gallons per day
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with
the station. The Division will accept a letter signed by the applicant(see 15A NCAC 02T .0106(b))or proposed contractor,
stating that"the portable power generation unit or portable, independently-powered pumping units, associated appurtenances
and personnel are available for distribution and operation of this pump station."
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'
storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall
be provided in the case of a multiple station power outage.(Required at time of certification)
I. Certificate of Public Convenience and Necessity(All Application Packages for Privately-Owned Public Utilities):
❑ Per 15A NCAC 02T.01 15(a)(1)provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities
Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer
extension, or
❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application
for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval
is expected.
J. Operational Agreements(Applications from HOA/POA and Developers for lots to be sold):
❑ Home/Property Owners' Associations
❑ Per 15A NCAC 02T.01 15(c),submit the properly executed Operational Agreement(FORM: HOA).
❑ Per 15A NCAC 02T.0115(c),submit a copy of the Articles of Incorporation,Declarations and By-laws.
❑ Developers of lots to be sold
❑ Per 15A NCAC 02T.01 15(b),submit the properly executed Operational Agreement(FORM: DEV).
For more information, visit the Division's collection systems website
INSTRUCTIONS FOR FORM: FTA 10-23 &SUPPORTING DOCUMENTATION Page 2 of 3
THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND
MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE:
REGIONAL OFFICE ADDRESS COUNTIES SERVED
Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee,
Water Quality Section Swannanoa, North Carolina 28778-8211 Clay, Graham, Haywood, Henderson, Jackson,
(828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk,
(828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey
Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke,
Water Quality Section Fayetteville, North Carolina 28301-5095 Montgomery, Moore, Robeson, Richmond,
(910)433-3300 Sampson, Scotland
(910)486-0707 Fax
Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland,
Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan,
(704)663-1699 Stanly, Union
(704)663-6040 Fax
Raleigh Regional Office 3800 Barrett Drive Chatham, Durham, Edgecombe, Franklin,
Water Quality Section Raleigh, North Carolina 27609 Granville, Halifax,Johnston, Lee, Nash,
(919) 791-4200 Northampton, Orange, Person, Vance, Wake,
(919) 571-4718 Fax Warren, Wilson
Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven,
Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde,
(252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank,
(252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne
Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New
Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender
(910) 796-7215
(910) 350-2004 Fax
Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance,Alleghany, Ashe, Caswell, Davidson,
Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph,
Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes,Yadkin
(336) 776-9800
(336) 776-9797 Fax
INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 3 of 3
State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23&SUPPORTING DOCUMENTATION
Application Number: (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Union County Public Works(company,municipality, HOA,utility,etc.)
2. Applicant type: ❑ Individual ❑Corporation ❑General Partnership ❑ Privately-Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑Other
3. Signature authority's name:Crystal O. Panico,PE per 15A NCAC 02T.0106(b)
Title: New Development Project Manager-Union County Public Works
4. Applicant's mailing address: 500 N. Main Street: Suite 47
City: Monroe State:NC Zip:28112-
5. Applicant's contact information:
Phone number: 704)283-3816 Email Address: crystal.panico@unioncountync.gov
II. PROJECT INFORMATION:
1. Project name: Luna Estates Subdivision
2. Application/Project status: ® Proposed(New Permit) ❑ Existing Permit/Project ❑ARPA funded
If a modification,provide the existing permit number: WQ00 and issued date:
For modifications,also attach a detailed narrative description as described in Item G of the checklist.
If new construction,but part of a master plan,provide the existing permit number: WQ00
3. County where project is located: Union County
4. Approximate Coordinates(Decimal Degrees): Latitude: 35.0311' Longitude: -80.7455'
5. Parcel ID(if applicable): 06123012&0612301C(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer:Tracey M. McCormick License Number: 041683
Firm: McKim&Creed
Mailing address: 8020 Tower Point Drive
City:Charlotte State:NC Zip: 28227-
Phone number: 704)841-2588 Email Address:tmccormick@mckimcreed.com
IV. WASTEWATER TREATMENT FACILITY(WWTF) INFORMATION:
1. Facility Name:McAlpine Creek Permit Number:NCO024970
Owner Name: Charlotte Mecklenburg Utility Department
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s): WQQ031776
2. Downstream(Receiving)Sewer Information: 16 inch ® Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s)(if applicable): WQCS0024183
Owner Name(s): Union County Public Works
FORM: FTA 10-23 Page i of 5
Vl. GENERAL REQUIREMENTS
1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ® N/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM: DEV)been attached?
❑ Yes [—]No ® N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement(FORM: HOA)and
supplementary documentation as required by 15A NCAC 02T.0115(c)been attached?
❑ Yes ❑No ® N/A
4. Origin of wastewater: (check all that apply):
®Residential(Individually Owned) ❑ Retail(stores,centers,malls) ❑Car Wash
❑Residential(Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑School/preschool/day care ❑ Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse
❑Food and drink facilities ❑Church ❑ Swimming Pool/Filter Backwash
❑ Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment)
5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial, is there a Pretreatment Program in effect?❑ Yes❑No
6. Hasa flow reduction been approved under 15A NCAC 02T.01 14(f)? ❑Yes ®No
➢ If yes,provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0114(f)) Daily Design Flow a,b No.of Units Flow
Single Family Residential 190 gal/day 18 3,1420 GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
Total 3,420 GPD
a See 15A NCAC 02T .01 14(b), (d), (e)(I)and(e)(2)for caveats to wastewater design flow rates(i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4).
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.01 141 shall be
determined using available flow data,water using fixtures,occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 3,420 GPD(per 15A NCAC 02T.01 14 and G.S. 143-215.I)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑Other(Explain):
FORM: FTA 10-23 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)- 02T.0305& NIDC(Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size(inches) Length (feet) Material
8 508 SDR-35
8 80 DIP
8 1,353 SDR-25
➢ Section II& III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305& MDC(Puma Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
l. Pump station number or name:
2. Approximate Coordinates(Decimal Degrees): Latitude: 0Longitude:- °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length (feet) Material
If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per
MDCPSFM Section 2.01 C.1.b. ❑Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify)
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
❑ Standby power source or ❑ Standby pump
> Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 3 of 5
IX. SETBACKS&SEPARATIONS—(02B.0200& 15A NCAC 02T.0305(f)):
I. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(fl&()? ® Yes ❑No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
zWater mains(vertical-water over sewer preferred,including in benched trenches) 18 inches
zWater mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class 11 impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
**Waters classified WS(except WS-I or WS-V), B,SA,ORW, HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
**Any other stream, lake, impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(f)or(),see Section X.1 of this application
*15A NCAC 02T.0305(Q)contains alternatives where separations in 02T.0305(fl cannot be achieved. Please check"yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webaage
2. Does this project comply with the minimum separation requirements for water mains? ® Yes [:]No ❑N/A
➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ® Yes [:] No ❑N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ®Yes Basin name: Catawba ❑No
If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑No
➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ®No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ® Yes [:]No
Per 15A NCAC 02T.0105(c)(6),directly related environmental permits or certification applications must be being prepared,
have been applied for,or have been obtained. Issuance of this permit is contingent on issuance of dependent permits(erosion
and sedimentation control plans,stormwater management plans,etc.).
7. Does this project include any sewer collection lines that are deemed"high-priority?" [] Yes 0 No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes, include an attachment with details for each line, including type(aerial line,size,material,and location).
High priority lines shall be inspected by the permittee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit.
FORM: FTA 10-23 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria(latest version)as applicable?
® Yes ❑No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit and proiects requiring a variance approval may be subject to longer
review times For proiects requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the project,the full technical review is required.
2. Professio J Engineer's Certification:
I, 1 �� attest that this application for
(Profess onal Engineer' name from Application Item 111.1.) (Project Name from Application Item 11.1)
has been reviewe by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers(latest version),and the Minimum Design Criteria for the Fast-Track Permitting
of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation.Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board.(21 NCAC 56.0701)
........................... ,.,.i.A.1.1.A.1.4}.
�.� CA
North Carolina Professional Engineer's seal,signature,and date:
SE.
GINcti p4"
N)
' ......................,1
3. Applicant's Certification per 15A NCAC 02T.0106(b):
1, (1045 / { & ?A4Ce,--v ,attest that this application for
(SignaturefAuthorityName from Application Item I.3.) (Project Name from Application Item II.I)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties, injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation.
Signature: _ Date: ! ��
FORM: FTA 10-23 Page 5 of 5
�R
d
� r!
O
JAVO MP
1� F
13.0 i
m �
0
Q �
+c
O z
a
O C:
0
U) o
�o o N -0
D -0
L
w H
_ '�!
_ ) O
O
State of North Carolina
Department of Environmental Quality
Division of Water Resources
; I : ,,IF V ._,- ., , ;_;., Flow Tracking for Sewer Extension Applications
(FTSE 10-23)
Entity Requesting Allocation: Union County
Project Name for which flow is being requested: Luna Estates Subdivision
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: McAlpine Creek WWTP
b. WWTP Facility Permit#: NCO024970
All flows are in MGD
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request 0.00342
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Firm Daily Flow** Current Tributary Flow Plus
(Name or Permit Capacity, * (Firm/pf), Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow,MGD MGD Flow Capacity***
N/A
*The Firm Capacity(design flow)of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
**Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(pf)not
less than 2.5,per Section 2.02(A)(4)(c)of the Minimum Design Criteria.
***A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is<0.
Downstream Facility Name(Sewer): Union County
Downstream Permit Number: WQ0039838
Pagel of 8
FTCF i n-?'I
III. Certification Statement:
I Crystal O. Panico, P.E. certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing fic'al Signature Date
NF—kl �FLt�Ph11T
Title of Signing Official
Page 2 of 8
FTSE 10-23
Page 3 of 9
FTSE 10-23
PLANNING ASSESSMENT ADDENDUM(PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is<0.
Pump Station(Name or Number):
Given that:
a. The proportion and amount of Obligated,Not Yet Tributary Daily Flow(C) accounts for
% and MGD of the Available Capacity(E) in Pump Station
; and that
b. The rate of activation of this obligated,not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity,namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over-allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
Signing Official Signature Date
Page 4 of 9
FTSE 10-23
WASTEWATER TREATMENT SYSTEM EXPANSIONS BEYOND EXISTING ALLOCATION
Complete this form and submit applicable supporting documentation if the proposed project is subject to
overallocation allowances outlined per G.S. 143-215.1(3).
Receiving WWTP Name:
Receiving WWTP Permit Number:
Provide a copy of the active NPDES permit for the receiving WWTP
Overallocation Criteria
1. Does the receiving WWTP's existing NPDES permit have an expansion flow tier?❑ Yes or❑ No.
a. If yes, provide the expansion flow tier: MGD; proceed to item 2.
b. If no, overallocation is not allowable for this construction until such a time that the receiving
WWTP's NPDES permit is modified for inclusion of an expansion flow tier capable of receiving
and sufficiently treating the wastewater generated by the proposed construction.
2. Is the receiving WWTP and collection system located within either(1) a county with a projected population
growth rate above two percent annually based on a 20-year residential growth projection conducted using data
provided by the Office of State Budget and Management(OSBM) State Demographer or(2) one of the top
20%of the fastest growing counties in the State by population based on a 10-year residential growth
projection conducted using data provided by the OSBM State Demographer?❑ Yes or❑ No.
a. If yes, submit a residential population projection to support your claim; proceed to item 3.
b. If no, overallocation is not allowable for this construction.
3. Has the receiving WWTP received a violation for being non-compliant with any non-flow limitations
identified in the active NPDES permit in the past 5 years? ❑ Yes or❑No.
a. If yes, overallocation is not allowable for this construction.
b. If no, submit a limit violation report to support your claim; proceed to item 4.
4. Has the receiving WWTP exceeded its monthly average flow limitation identified in the active NPDES permit
more than once in any 12-month period in the past 10 years?❑ Yes or❑ No.
a. If yes, overallocation is not allowable for this construction. The receiving WWTP may not
allocate more than one hundred percent(100%) of the existing system's hydraulic capacity until
the permittee complies with the permitted monthly flow for at least 12 consecutive months.
b. If no, submit a WWTP flow report to support your claim;proceed to item 5.
5. Is completion of construction for work identified in an Authorization to Construct(ATC)permit that results in
expansion of facility to the next flow tier anticipated to occur within 24 months of the submittal date?❑ Yes
or❑ No.
a. If yes, allocation of one hundred ten percent(115%) of the receiving WWTP's existing hydraulic
capacity is allowable.
i. Provide the ATC Permit Number: ;
ii. Submit a construction timeline signed by the contactor's Project Manager;
iii. Submit a letter of agreement of timeline feasibility signed by the NC-licensed
Professional Engineer responsible for the certification of work covered under the
applicable ATC permit;
iv. Proceed to item 6.
b. If no, allocation of one hundred ten percent(110%) of the receiving WWTP's existing hydraulic
capacity is allowable. Proceed to item 6.
Page 5 of 9
FTSE 10-23
6. Does the overallocation identified as allowable under item 5 result in a WWTP flow rate greater than the
permitted projected capacity after expansion?❑ Yes or❑ No.
a. If yes, overallocation is not allowable for this construction.
b. If no,proceed to item 7.
7. Does the overallocation identified as allowable under item 5 result in a WWTP flow rate greater than 80%of
the permitted projected capacity after expansion?❑ Yes or❑No.
a. If yes, overallocation is allowable. Submit an engineering evaluation of the receiving WWTP's
future wastewater treatment, utilization, and disposal needs. This evaluation shall outline plans
for meeting future wastewater treatment,utilization, or disposal needs by either expansion of the
existing system, elimination or reduction of extraneous flows, or water conservation and shall
include the source of funding for the improvements. If expansion is not proposed or is proposed
for a later date, a justification shall be made that wastewater treatment needs will be met based on
past growth records and future growth projections and, as appropriate, shall include conservation
plans or other measures to achieve waste flow reductions. This shall be provided to the Division
prior to the proposed activity. Proceed to item 8.
b. If no, overallocation is allowable.
8. Does the overallocation identified as allowable under item 5 result in a WWTP flow rate greater than 90%of
the permitted projected capacity after expansion? ❑ Yes or❑No.
a. If yes, overallocation is allowable. However,the permittee for the receiving WWTP shall obtain
all permits needed for the expansion of the wastewater treatment,utilization, or disposal system
and, if construction is needed, submit final plans and specifications for expansion, including a
construction schedule. If expansion is not proposed or is proposed for a later date, a justification
shall be made that wastewater treatment needs will be met based on past growth records and
future growth projections and, as appropriate, shall include conservation plans or other specific
measures to achieve waste flow reductions. This shall be provided to the Division prior to the
proposed activity.
b. If no, overallocation is allowable.
Signing Official Signature Date
Page 6 of 9
FTSE 10-23
Instructions for Flow Tracking form(FTSE)and Planning Assessment Addendum(PAA)
Section I
a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow.
b. WWTP Facility Permit#: Enter the NPDES or Non-Discharge number for the WWTP receiving the
wastewater flow.
c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non-Discharge permit.
d. Estimated obligated flow not yet tributary to the WWTP MGD: This includes flows allocated to other
construction projects not yet contributing flow to the collection system. Flows allocated through interlocal
agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs
that implement a pretreatment program, include flows allocated to industrial users who may not be using all of
their flow allocation.Please contact your Pretreatment Coordinator for information on industrial flow tributary
to your WWTP.
As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and
reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and
is not yet been made tributary to the WWTP,in accordance with local policies and procedures employed by the
reporting entity.
e. WWTP facility's actual avg. flow, MGD: Previous 12 month average.
f. Total flow for this specific request MGD: Enter the requested flow volume.
g. Total actual and obligated flows to the facility,MGD Equals [d+ e+ff
h. Percent of permitted flow used: Equals [(g/c)*100]
For example:
On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5
MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a
proposed flow expansion of 0.015 MGD.
The first Form FTSE submitted after January 15, 2008 may have numbers like this:
c. = 6.0 MGD
d. = 0.5 MGD
e. = 2.7 MGD
f. = 0.015 MGD
g. = 3.215 MGD
h. = 53.6%
The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD:
c. = 6.0 MGD
d. = 0.515 MGD
e. = 2.73 MGD
f. =0.102 MGD
g. = 3.349 MGD
h. = 55.8 %
Each subsequent FTSE form will be updated in the same manner.
Page 7 of 9
FTSE 10-23
Section II
List the pump station name or number and approximate pump station firm capacity, approximate design average
daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the
pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate
the total current flow plus obligated flow(D=B+C)and the available capacity(E=A-D). Include the proposed flow
for this project with other obligated flows that have been approved for the pump station but are not yet tributary
(C).
Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the
Minimum Design Criteria.
Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(pf)of not less than
2.5.
If the available capacity(E) for any pump station is <0, then prepare a planning assessment for that pump station
if the system has future specific plans related to capacity that should be considered in the permitting process.
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Obligated,
Design Approx. Not Yet Total Current
Firm Average Current Avg. Tributary Flow Plus
Pump Station Capacity Daily Flow Daily Flow, Daily Flow, Obligated Available
(Name or Number) MGD (Firm/pf) MGD MGD Flow Capacity*
Kaw Creek PS 0.800 0.320 0.252 0.080 0.332 -0.012
Valley Road PS 1.895 0.758 0.472 0.135 0.607 0.151
Page 8 of 9
FTSE 10-23
Planning Assessment Addendum Instructions
Submit a planning assessment addendum for each pump station listed in Section II where available capacity is<0.
A planning assessment for Kaw Creek PS (see example data above)may be performed to evaluate whether there is
significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating
the flows from the proposed sewer extension project.
If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the
flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control
the rate of flow to prevent sanitary sewer overflows.
The planning assessment may identify a funded project currently in design or construction, or a planned project in
the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the
certainty of successful timely project completion for any expansion, flow management diversion or infiltration and
inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance
compliance.
For example:
Given that:
a. The proportion and amount of obligated, not yet tributary flow accounts for 24 %and 0.080 MGD of the
committed flow in Pump Station Kaw Creek; and that
b. The rate of activation of this obligated,not yet tributary capacity is currently approximately 0.01 MGD
per year; and that
c. A funded capital project that will provide the required planned capacity,namely
is in design or under construction with planned
completion in ; and/or
d. The following applies:
The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled
Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD
to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition
of this Flow Trackin /g Acceptance for Sewer Extension Permit Application elevates this project's priority for
funding and construction to be implemented ahead of the activation of obligated,not vet tributary flows in amounts
that exceed the firm pump station capacities identified in Section II above.
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow
to be permitted,without a significant likelihood of over-allocating capacity in the system infrastructure.
Page 9 of 9
FTSE 10-23
UNIONCOUNTY
WATER
September 16, 2024
Charlotte Water
5100 Brookshire Blvd.
Charlotte, N.C. 28216
Re: Letter of Acceptance for Non-Discharge Application
Luna Estates Subdivision
Marvin, NC
Preliminary Engineering Plans and Specifications for sewer lines to serve The Estates at Marvin
Branch have been submitted to Union County Water. Part of the Non-Discharge Permit Application
requirement is to obtain a letter of acceptance from the receiving wastewater treatment plant.
Your McAlpine WWTP (No. NC0024970) will be the receiving facility.
The total estimated volume of wastewater generated by this project will be 3,420 gpd (18 homes
x 190 gpd). This wastewater will be transported to the McAlpine WWTP via your Six Mile Creek
Pumping station and outfall line. Please see the attached map for location of the project and
the existing metering station.
Please provide the necessary"Letter of Acceptance"to accompany an application to the Division
of Environmental Quality.
If you have any questions or require any additional information don't hesitate to call.
Sincerely,
�4AI 4/0�w
Crystal O. Panico, PE
New Development Program Manager
Attachment
Union County Water
500 N. Main Street
Monroe, NC 28112
T 704.296.4210
unioncountync.gov/water
State of North Carolina
Department of Environmental Quality
Division of Water Resources
: A s. _ Flow Tracking for Sewer Extension Applications
(FTSE 10-23)
Entity Requesting Allocation: Union County Water
Project Name for which flow is being requested: Luna Estates Subdivision
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek
b. WWTP Facility Permit#: NC0024970, NC0024945, NCO024937
All flows are in MGD
c. WWTP facility's permitted flow 99.000
d. Estimated obligated flow not yet tributary to the WWTP 17.136
e. WWTP facility's actual avg. flow 69.858
f. Total flow for this specific request 0.00342
g. Total actual and obligated flows to the facility 86.997
h. Percent of permitted flow used 87.9%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Firm Daily Flow** Current Tributary Flow Plus
(Name or Permit Capacity, * (Firm/pf), Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow,MGD MGD Flow Capacity***
Six Mile Creek 18.0 7.2 4.89 0.189 5.079 2.121
*The Firm Capacity(design flow)of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
**Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(pf)not
less than 2.5,per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
***A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is<0.
Downstream Facility Name (Sewer): Unknown
Downstream Permit Number: Unknown
Page 1 of 6
FTSE 10-23
III. Certification Statement:
I Keri Cantrell certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Digitally signed by Keri Cantrell
Date: 2024.10.08 23:23:23:42 -04'00' 10/8/2024
Adobe Acrobat version: 2024.003.20112
Signing Official Signature Date
Chief Engineer
Title of Signing Official
Page 2 of 6
FTSE 10-23
CHARLOTTE
Wt)TER
October 9, 2024
Mr. Bill Recher
Union County Water
500 N. Main Street
Suite 400
Monroe, NC 28112
SUBJECT: WATER AND SEWER FLOW ACCEPTANCE
LUNA ESTATES SUBDIVISION
6110 WEDDINGTON-MATTHEWS ROAD, MARVIN, NC. 28173
CLTWATER TRACKING# 20245944
After analysis of the sanitary sewer associated with the proposed design of project, 20245944,
LUNA ESTATES SUBDIVISION, it was determined that there is sufficient capacity to
accommodate the proposed sewer flow of 3,420 gallons per day(18 lots x 190 gpd/lot) at the
connection point(s) indicated on the submitted utility plan for transmission to the McAlpine Creek
Wastewater Treatment Plant; NPDES permit number NC0024970, for treatment. This acceptance of
flow is based upon the existing capacity of the designated publicly owned treatments works.
Please find FTSE document attached.
Charlotte Water(CLTWater) agrees to furnish water to the subject project. The water quality to the
subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water
Supply Management Plan, PWS ID #0160010 on file with the Public Water Supply Section of
NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow.
The applicant should understand that due to the involvement of other agencies and continuing
growth of the water and sewer system, the ability to provide service for future projects cannot be
guaranteed nor reserved. Connection to the CLTWater and sewer system is accepted on a first
come, first served basis.
The applicant should understand that this letter is not authorization to construct or extend private
water or sewer systems, as the appropriate local or State permits are required prior to construction.
If the appropriate authorization to construct permits are not obtained and construction has not
started within two (2) years of issuance of this flow acceptance and payment for any service
connections have not been received within two (2) years of issuance of this flow acceptance letter,
this flow acceptance approval shall be rescinded and a new flow acceptance reauest must be
made. If you have any questions, please do not hesitate to contact me at(704) 432-5801.
Sincerely,
GuiUZr~-Av z&La.
Guillermo Anzola / Engineering Assistant
CHARLOTTE WATER / charloftewater.ora
Charlotte Water 5100 Brookshire Blvd,Charlotte,NC 28216 charlottewater.org
Operated by the City of Charlotte