Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8070801_Historical File_20170719
ROY COOPER �. Governor MICHAEL S. REGAN Secretary Energy,Mineral& TRACY DAVIS Land Resources Director ENVIRONMENTAL QUALITY July 19,2017 Mr. Charles A Paul,III,Manager/CEO Bald Head Island Limited,LLC PO Box 3069 BHI,NC 28461 Subject: Permit Renewal and Permit Extension State Stormwater Management Permit No. SW8 070801 Swan's Quarter Brunswick County Dear Mr. Paul: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality(DWQ)to the Division of Energy, Mineral and Land Resources(DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that the updated permit or any updated pages to the permit will now reference DEMLR as the Division responsible for issuance of the permit. On August 5, 2009,the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Energy,Mineral and Land Resources under Article 21 of Chapter 143 of the General Statutes,which is current and valid at any point between January 1,2008,and December 31,2010.The law extends the effective period of any stormwater permit that was set to expire during this time frame up to three(3)years from its current expiration date. On August 2,2010,the Governor signed Session Law 2010-177,which granted an extra year for an extension of up to four(4)years. On July 7, 2017,the Division of Energy,Mineral and Land Resources(DEMLR)received a permit Renewal application for the subject project. The Division is hereby notifying you that permit SW8 070801 has been renewed on July 19,2017 and to remind you that this permit shall be effective until September 17,2029,which includes the extensions. For your records,please find enclosed a copy of the updated permit,and a copy of the renewal form submitted on July 7,2017. This permit is subject to the conditions and limitations as specified in the updated permit. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s),recordation of deed restrictions,procedures for changes of ownership,transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system,to record deed restrictions,to transfer the permit,or to renew the permit, will result in future compliance problems. If any parts,requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty(30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center,Raleigh,NC 27699-6714,or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. State of North Carolina I Environmental Quality I Energy.Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington.NC 28405 910 796 7 215 State Stormwater Permit No. SW8 070801 Page 2 of 2 If you have any questions, need additional copies of the permit or approved plans,please contact Kelly Johnson with DEMLR in the Wilmington Regional Office at(910) 796-7331. Sincerely, or .4,Tracy Davis, P.E.,Director Division of Energy,Mineral and Land Resources GDS/kpj: \\\Stormwater\Permits&Projects\2007\070801. HD\2017 07 permit 070801 cc: Bruce Marek,PE Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy,Mineral and Land Resources Wilmington Regional Office 127 Cardinal Drive Extension I Wilmington,NC 28.405 910 796 7215 • State Stormwater Management Systems Permit No. SW8 070801 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO M. Kent Mitchell& Bald Head Island Limited, LLC Swan's Quarter Bald Head Island Wynd, Brunswick County FOR THE construction, operation and maintenance of eight (8) infiltration basins in compliance with the provisions of 15A NCAC 2H .1000, effective September 1, 1995 (hereafter referred to as the "storm water rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (DEMLR) and considered a part of this permit. This permit shall be effective from the date of issuance until September 21, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 in this permit. The stormwater controls have been designed to handle the runoff from a total of 61,156 square feet of impervious area. 3. The tract will be limited to the amount of built-upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon areas within the permitted drainage areas of this project must be directed into the permitted stormwater control system. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 070801 6. The following design criteria have been provided in the infiltration basins and must be maintained at design condition: Basin 1 Basin 2 Basin 3 Basin 4 I Basin 5 Basin 6 Basin 7 I Basin 8 a. Drainage Area, ac: 0.55 0.309 0.60 0.279 0.461 0.324 0.614 0.118 (1) Onsite, ft2: 23,761 13,452 26,156 12,161 20,086 14,135 26,755 5,131 (2) Offsite, ft2: 0 0 0 0 0 0 0 0 b. Total Impervious Surfaces, ft2: 8,768 8,371 10,142 4,776 9,549 5,953 13,021 576 (1) Buildings ft2: 5,023 0 9,038 4,447 4,591 4,447 9,038 576 (2) Roads/Parking, ft2: 3,745 8,371 1,104 329 4,958 1,506 3,983 0 c. Design Storm, inches: 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 d. Basin Depth, feet: 1 1 1 1 1 1 1 1 e. Bottom Elevation, FMSL: 4.5 4.5 4.5 4.5 4.5 4.5 4.5 I 4.5 f. Permitted Surface Area at 1,295 1,188 1,500 576 1,086 936 2,000 128 Bottom, ft2: g. Permitted Storage 1,551 1,407 1,725 786 1,518 1,133 2,150 176 Volume, ft3: h. Storage/Bypass N/A* N/A* N/A* N/A* N/A* N/A* N/A* N/A* Elevation, FMSL: i. Type of Soil: Fine Fine Fine Fine Fine Fine Fine Fine Sand Sand Sand Sand Sand Sand Sand Sand j. Expected Infiltration Rate, 20 20 20 20 20 20 20 20 in/hr: k. Seasonal High Water 2.43 2.45 2.47 2.20 2.17 2.00 2.10 2.50 Table, FMSL: I. Time to Draw Down, 0.439 0.518 0.522 0.639 0.663 0.486 0.489 0.454 hours: m. Receiving Stream/ River Atlantic Atlantic Atlantic Atlantic I Atlantic Atlantic Atlantic Atlantic Basin: Ocean/ Ocean/ Ocean/ Ocean/ Ocean/ Ocean/ Ocean/ Ocean/ Cape Cape Cape Cape Cape Cape Cape Cape Fear Fear Fear Fear Fear Fear Fear Fear n. Stream Index Number: 99-(3) 99-(3) 99-(3) 99-(3) 99-(3) 99-(3) 99-(3) 99-(3) o. Classification of Water SB SB SB SB SB SB SB SB Body: * Non-discharging infiltration basin. II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. • Page 4 of 9 State Stormwater Management Systems Permit No. SW8 070801 4. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access oath to the bypass structure must be available at all times. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 070801 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2- 01(e) and NCGS 57D-6-07; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the DEMLR, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division in writing of any name, ownership or mailing address changes within 30 days. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 070801 10. Any individual or entity found to be in noncompliance with the provisions of this stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 11. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 12. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit renewed and reissued this the 19th July 2017 N& i , ctor CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 1 Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 070801 Page 7 of 9 State Stormwater Management Systems Permit No. SW8 070801 Swan's Quarter Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date Page 8 of 9 • State Stormwater Management Systems Permit No. SW8 070801 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11 . The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Regional Office Brunswick County Building Inspections Page 9 of 9 DEMLR USE ONLY ,Aate eceived Fee Paid Permit Number // State of North Carolina Department of Environment and Natural Resources Division of Energy Mineral and Land Resources (NCDENR DEMLR) STORMWATER MANAGEMENT PERMIT RENEWAL APPLICATION FORM This form may be photocopied for use as an original This form is to be completed by the current permit holder pursuant to Title 15A NCAC 2H.1003(h)(2).This states that stormwater management permits,issued for projects that require the construction of engineered stormwater control measures(High Density Permits),shall be required to submit an application to renew the permit 180 days prior to expiration of the permit.Renewed permits are valid for a period of 8 years per Session Law 2011-398(SB 781)Section 60.(c). I. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the North Carolina Department of Environment and Natural Resources(NCDENR)Division of Energy Mineral and Land Resources(DEMLR). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DEMLR Regional Office. (The appropriate office maybe found by clicking on the interactive online map at http://portal.ncdenr.org/web/guest/regional-offices.Copies of the original permit can be obtained from the Regional Office of the Division of Energy,Mineral and Land Resources.) This Renewal is for STORMWATER PERMIT#:SW 8-070801 Please check which of the following permit renewal scenarios apply. Initial in the spaces provided that you have provided the required information. A.Renewal Only: -$505 fee -Renewal Form-Sign and complete all sections (send original&1 copy) -Recorded Documents Required By Permit:Deed restrictions,covenants,condominium/planned community declaration&easements(if not already submitted to NCDENR DEMLR). Copies are acceptable. w -Designer's Certification(if required by permit and not already received by NCDENR DEMLR)(See the `�— last page of your permit for a copy of the certification form.) q- -I Have a Copy of the Current Operation and Maintenance Agreement(O&M): Please Keep this on File with your permit. -I Do Not Have a Copy of the Current O&M:Initial This Line to Request a copy. (If NCDENR DEMLR does not have a copy on file, then you will be notified to submit a new 0&M form.) ❑ B.Renewal and Modification: -$505 Fee and Pages 1 &2 of this Renewal Form -SWU-101 Application Form(http://portal.ncdenr.org/web/wq/zos/su/statesw/forms dots) -Recorded Documents Required By Permit:Deed restrictions,covenants,condominium/planned community declaration&easements(if not already submitted to NCDENR DEMLR). Copies are acceptable. -Under#11. 1.on SWU-101 Application Form--Check Box for Modification w/Renewal -Designer's Certification(if required by permit and not already received by NCDENR DEMLR)(See the last page of your permit for a copy of the certification form.) �r -O&M Agreement(http://portal.ncdenr.org/web/wq/ws/su/bmp-manual) E C E I V E Form SWU-102(Renewal Form) Rev.Oct.31,2013 Page 1 of 4 JUN 2 7 2017 QY: ❑ C.Renewal and Either: 1.)Permit Transfer to a New Permittee,or 2.)Project Name Change: Please submit all items in I.A,and: Request a NCDENR DEMLR site inspection if transferring permit to new property owner. Submit One of the Two Following Forms below(forms available at http://portal.ncdenr.org/web/lr/state- stormwater-forms does). 1. HOA Name/Ownership Change Form: For planned communities(per Chapter 47C or Chapter 47F of the General Statutes) 2. Name/Ownership Change Form: For all other transfers Please make sure all required information is submitted with the Name/Ownership Change form(as stated in each of the available forms)and that all required signatures and initials are filled in properly. Otherwise the name change or transfer can not be processed and the original owner will remain as the permit holder. ❑ D.Renewal,Modification,and Transfer(or Name Change): Please submit pages 1 and 2 of this Renewal form along with all items listed in I.B. and C.above(check this box and initial items in B. &C.that you are submitting to NCDENR DEMLR). II. APPLICANT'S CERTIFICATION Note:The legally responsible party is the current permittee and/or the legally responsible representative until such time that the permit is officially transferred through a request to DEMLR by the permittee. I,(print or type name of permittee or person legally responsible for the permit)Charles A.Paul,III , certify that I have a copy of the DEMLR Approved Permit and O&M Agreement on-site(OR I have obtained a copy from DEMLR and it will be kept on site),that I am responsible for the performance of the maintenance procedures and the site has been,and will be,maintained according to the 0&M Agreement. I agree to notify DEMLR of any problems with the system and prior to any changes to the system or changes in ownership I will(or have through this renewal application)notify NCDENR DEMLR and submit the proper forms to modify or transfer the permit. All information provided on this permit renewal application is,to the best of my knowledge,correct and complete. Permittee Title:Manager/CEO Bald Head Island Limited,LLC Address:P.O.Box 3069,Bald Head Island,NC 28461 Phone:910-457-5 Signature: . a. Date: (e•2• 1* NOTARIZATION: I, 'L. b Arfe_ (.5-f a Hs ,a Notary Public for the State of h H( (J�w(in1 k County of f t nJ yGui'PJ( ,do hereby certify that CFA.'/pg A• Pia!j7 personally appeared before me this day of 'XL rf'0el3,, .10/' ,and acknowledge the due execution of the forgoing stormwater BMP maintenance requirements.Witness my hand and official seal, My commission expires: / •� ��- _ ,a a J , Notary Signature: .. - Date: a..�3� T� ioyewe t fiECEIVE 'ate v�OT.q, �4g ,IH 12417r/ c A �/ =yam 41eL10 BY: ��•4"4s4- trVt1 ,.. ,I on...N.NN,. Form SWU-102(Renewal Form) Rev.Oct.31,2013 Page 2 of 4 III. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW8-070801 2. Permit Holder's name(specify the name of the corporation,individual,etc.): Bald Head Island Limited,LLC 3. Print Owner/Signing Official's name and title(person legally responsible for permit): Charles A.Paul,III, Manager/CEO 4. Mailing Address for person listed in item 2 above: P.O.Box 3069 City:Bald Head Island State:NC Zip:28461 Phone: (910 ) 457-5000 Fax: (910 ) 457-7220 Email:cpaul?bhisland.com 5. Project Name:Swan's Quarter 6. Location of Project(street address): South Bald Head Wynd,appx 1.12 Miles from Bald Head Island Ferry Landing(no current street number) Latitude 33d 51'43"N, Longitude 78d 00'22"W City:Bald Head Island County:Brunswick Zip:28461 7. Directions to project(from nearest major intersection): Take Bald Head Island Ferry from Deep Point Marina Ferry Terminal,1301 Ferry Road,Southport,NC to Bald Head Island. Rent Cart at Cart Rental or Call member of Bald Head Island Limited,LLC Planning Dept 910-457-7515. Take first right onto West Bald Head Wynd at Cart Bridge/North Bald Head Wynd/West Bald Head Wynd Intersection. Proceed Southeasterly along West Bald Head Wynd. West Bald Head Wynd turns into South Bald Head Wynd.Swan's Quarter is appx 1 mile from the West Bald Head Wynd/North Bald Head Wynd Intersection on the left/landward side of the road. TheAtlantic Ocean is on the right hand side of the road. If you get to the Bald Head Island Club(golf course) entrance on Salt Meadow Trail,you have gone too far. Turn around and turn in at old driveway. BECEIVE JUR272017 BY: Form SWU-102(Renewal Form) Rev.Oct.31,2013 Page 3 of 4 010" IV. PERMIT INFORMATION: 1. Specify the type of stormwater treatment ❑Constructed Wetland ❑Bioretention ['Wet Detention Pond ['Dry Detention Basin II Infiltration Basin ❑Infiltration Trench ❑Sand Filter ❑Other: 2. If any changes were made to the original DEMLR approved project list them in the space below(attach additional pages if needed and provide"As-Built"drawings with this application). If major changes have been made to your project please request a plan revision or modification of the permit and submit"As Built"drawings along with a final or updated stormwater system engineer certification(if not already provided to NCDENR). DEMLR Engineer and Designer Certification Forms are available from each NCDENR DEMLR Regional Office. Site is still undeveloped(June 2017). Stormwater Infiltration Basins will be constructed at time of project construction. Project may be phased. No changes at this time to the existing Stormwater Plan. DECEIVE [UN272017 BY: Form SWU-102(Renewal Form) Rev.Oct.31,2013 Page 4 of 4 6'� Completeness Review Checklist Project Name: 5LL &-ice 5 Received Date: JC. & - ? 2< 17 Project Location: Accepted Date: f l Rule(s) Coastal 1 1 1995 Coas tal stal Phase II (WiRO.) DUniversal t ;1988 oastal Type of Permit: New or Mod or PR Existing Permit#(Mod or PR): 0-70Fo i APE Cert on File? Density: HD or LD Type: Commercial or Residential EJINCG: %: _All(%OK?) Stream Class: •SA Map �Offsite to SW8 Subdivided?: Subdivision or Single Lot 1ORW Map (i- Exempt Paperwork Emailed Engineer on: ©Supplement(s) (1 original per BMP) BMP Type(s): DO&M with correct/original signatures (1 original per BMP except LS/VFS and swales) .plication with correct/original signatures Deed ]Corp or LLC: Sig.Auth. per Soy or letter [Email Address: Design Engineer i 05 (within 6mo) L .JlEmail Address: Owner ,,, Soils Report with SHWT a-' , „r �voucc veviewe ° �r JCalculations (signed/sealed) 6 A3-c--1-6 VI"- 7-1 No obvious errors r , ega (4-1)-33 (61 I! J!IDensity includes common areas, etc 6 ve-tA (/r L.— IL iiDeed Restrictions, if subdivided: `~.; Signed & Notarized C � lbo Ljii Correct Template(Comm/Res& HD/LD) or Dec. Covenants& Rest. Plans - 72 Sets f Details (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Grading I ilWetlands: Delineated or No Wetlands Vicinity Map ,Layout y (proposed BUA dimensions) —Le end _.___,I g IjJDA Maps ( Project Boundaries Infiltration Wet Pond Offsite Soils Report Soils Report PE Cert for Master Lot#: SHWT:II iSHWT: 0 Deed Rest for Master Lot# Matches Master Bottom' DPP: BUA Permitted (Master): sf Visited: BUA Proposed (Offsite): sf r Additional Information: Permitted Proposed: Proposed: Proposed: BUA (sf) - _-- DA(sf) PP (el) __1 SHWT(el) Depth (ft) SA (sf) CCasr ,er Jo From: Casmer,Jo Sent: Monday,July 10, 2017 9:34 AM To: 'cpaul@bhisland.com' Subject: Swan's Quarter, Stormwater Permit SW8 070801 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal application and $505.00 fee on July 7, 2017. The project has been assigned to Kelly Johnson and you will be notified if additional information is needed. Jo Casmer Administrative Assistant for DEMLR/Stormwater Section North Carolina Department of Environmental Quality Department of Environmental Assistance&Customer Service 910 796-7336 office 910 350-2004 fax jo.casmerancdenr.aov 127 Cardinal Drive Extension Wilmington, NC 28405 L --r"=—Nothiing Compares--,,., . Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 . . •. . . . . . . -t....‘7.1..,•,..,ira'47-A`-,IreL'e. T:--Cl_.,!.:,.II!..i!.j!.. li q.c it ni r Ln!.. c e.r ,I, _i,,t .d,t!!1...,,-, 7._7_,-..meztkz.. 1,4* $. 2.15",T.,L_..;.=. -ZA.,...-il . . . . . . . , . . • . . SALD-.HEAD1SLAND.LTD.'-- • - • . 1563 1•i • • PLANNING'AND. PERMITS •. • , P119.X..3069-. - IV. . • BALD HEAD ISLAND,NC 28461 DATE 7,-)kg- k6% :2b\1 66-30/531 .9' - 453 4 3AY - lc: -0 THE ,...)C1 c:siSki\k„.(2.-.... )RDER Of- • • -. . . . • . is : SOS. CO a ,:. .. ... . . - -r.......,-,-.--t----7'7'7-7'..:- • DOLLAR$. ' . i A 1p (..;,- Fug.ptizes • ... . • • ..• . . . . • •• . .ii.4, . . .. q . . . . FOR 5w1 -wl.ottL._&LA. .. . .. , . '.. ...- - . - ... . 1-. :.., -.. . _ ....-..:-_'...:.... . ..._ 4! 0 I r r .1 Art.,fogw-10-w,,-ii-e-2. ..-ss-gml--...J_.- ---,%=•-swita .--.:,.. --,---r- 7....-.v--TA-..,--4-4.,z10..7.eze-&re,,-. 1_ 7s,7-.7-_--i-,tiq. ---vret -,--7-.--co2Irti-..._77.,'",-_-....---J:. ...... • iv Corporations Division scsnt.-.gov N nett Carolina ' r f.F.. PA FiT M ENT fi Elaine F Marshall Ser:ref ary sz",E,-.C:RE. 1ARY Z41E Nr.t to rto-o el? !licit mai-m*11441c,on the Secretary of State s Ouilchng our o site will not be f..JEly functional en Saturday June 1 lth from 6 OD am unto! I DO prn We apologize for any CORPORATIO1113 inconveishence tests may cause Choi Heft To Corporate Names Pry,nor•Stara - • Lapin - Pres Lep. Limited Liabtfety Company Intecrnaetsn Soya stout tar- - Ann-et NipponOate Statue Crdrenemp r , FOMNINI Float Martel - State or et corps mew I• Raterereet Agent Corporate Mat-asses 1 - WIN.W.Wetri Car-pony Ofirmals Mar irk! ifiliftififir • ' Miriger llaWariet ' • ECEIVE11) •4 - . . [UN 2 7 2017 . . mirw, BY: mar age Wham a- s - "a, Jul 3,1- tr.