Loading...
HomeMy WebLinkAboutSW4231201_Emails_20241030 Beeker, Jacob I From: Beeker, Jacob I Sent: Wednesday, October 30, 2024 3:57 PM To: Kenneth Binkley Cc: svc_post_construction_stormwater; Eplin, Tamera;Jeremy Keeny; Ifbrooks@forsythco.com Subject: Re: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) Good afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR) received a Post-Construction Stormwater Management Permit Application for the subject project on July 17th, 2024. 15A NCAC 02H .1042(3)(c)of the North Carolina Administrative Code states that an application is considered approved if the required response times outlined in G.S. 143-215.1 are not met, unless one of the following exceptions applies: i. The applicant agrees, in writing,to a longer review period. ii. A public hearing is required for a final decision. iii. The applicant fails to provide necessary information for the Division's review. iv. The applicant denies the Division access to records or premises for information gathering. As none of these exceptions were relevant to your application,SW6240704 is considered approved on August 16th, 2024, based on the aforementioned regulation (15A NCAC 02H .1042(3)(c)). We are forwarding Permit No.SW4231201, dated August 16th, 2024,for the construction, operation and maintenance of the built-upon areas(BUA) and vegetated conveyances or areas associated with the subject project.This permit shall be effective from the date of issuance and shall be subject to the conditions and Limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, Pulte Home Company, LLC, at the following address(NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Pulte Home Company, LLC, Developer Attn: Chris Raughley,VP Land Development 1225 Crescent Green Drive,Suite 250 Cary, NC 27518 1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made)after which point,they will be kept on file at the Winston-Salem Regional Office. If you have any questions, or need additional information concerning this matter, please contact Jacob Beeker at postconstructionCcbdeq.nc.gov. Thankyou, i Jacob Beeker(He/Him) Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office:(919) 707-9214 iacob.beeker(a-)deq.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Jeremy Keeny<JKeeny@mragta.com> Sent:Thursday, October 3, 2024 4:53 PM To: Lawyer, Mike<mike.lawyer@deq.nc.gov>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; Holland, Brianna <brianna.holland@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov> Cc: Kenneth Binkley<Kenneth.Binkley@PulteGroup.com> Subject: RE: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thanks Mike! Again, appreciate your help getting this out! Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal MORRIS & RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mragta.com 6dtw 1979-2024 From: Lawyer, Mike<mike.lawyer@deq.nc.gov> Sent:Thursday, October 3, 2024 4:50 PM To:Jeremy Keeny<JKeeny@mragta.com>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; Holland, Brianna <brianna.holland@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov> Cc: Kenneth Binkley<Kenneth.Binkley@PulteGroup.com> Subject: RE: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) The Division of Energy, Mineral and Land Resources received a Post-Construction Stormwater Management Permit Application for the subject project on July 17, 2024. 15A NCAC 02H .1042 (3)(c)of the North Carolina Administrative Code states that an application is considered approved if the required response times outlined in G.S. 143-215.1 are not met, unless one of the following exceptions applies: 2 i. The applicant agrees, in writing,to a longer review period. ii. A public hearing is required for a final decision. iii. The applicant fails to provide necessary information for the Division's review. iv. The applicant denies the Division access to records or premises for information gathering. As none of these exceptions were relevant to your application,SW4231201 is considered approved as of August 16, 2024 based on the aforementioned regulation (15A NCAC 02H .1042(3)(c)). Michael Lawyer, CPSWQ Stormwater Program Supervisor Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-3639 1 Cell: (984) 232-1136 Email: mike.lawyera-deg.nc.gov 512 North Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Ot fnrrKawrtl�Yi 9�IYf�� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Jeremy Keeny<JKeeny@mragta.com> Sent:Wednesday, October 2, 2024 1:55 PM To: Lawyer, Mike<mike.lawyer@deq.nc.gov>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; Holland, Brianna <brianna.holland@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Cc: Kenneth Binkley<Kenneth.Binkley@PulteGroup.com> Subject: RE: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Mike, Winston-Salem confirmed with me that if we could get an email from you confirming the project is approved, but that we're waiting on the permit and language, that Winston-Salem can proceed with their part. Any chance you can get this over to us? Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal ,v, MORRIS & RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mra-qta.com Zyeata 1979-2024 3 From:Jeremy Keeny Sent:Wednesday, September 25, 2024 10:53 AM To: Lawyer, Mike<mike.lawyer@deg.nc.gov>; Eplin,Tamera <tamera.eplin@deg.nc.gov>; Holland, Brianna <brianna.holland@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Cc: Kenneth Binkley<Kenneth.Binkley@PulteGroup.com> Subject: RE: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) Mike, received your voicemail a week or so back. I was out of town at the time, but appreciate you getting back with me! I was hoping you could send out an email saying the same thing as your voicemail, that the project is approved and that you're working on the approval letters. I'm hoping Winston-Salem will accept that in lieu of the full approval letter to wrap up their approvals. Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal MORRIS & RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mra-qta.com eata 1979-2024 From:Jeremy Keeny Sent:Tuesday,August 27, 2024 4:17 PM To: Lawyer, Mike<mike.lawyer@deg.nc.gov>; Eplin,Tamera <tamera.eplin@deg.nc.gov>; Holland, Brianna <brianna.holland@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Cc: Kenneth Binkley<Kenneth.Binkley@PulteGroup.com> Subject: RE: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) Good afternoon Mike and Brianna! hope you both are making it through the crunch with staff reduction. I'm not trying to be a bother, but we haven't heard anything back on Fiddlers Creek for a while. I believe you had mentioned that the review time was now cut down to 30 days, which would have been 8/19. Could you let me know if this means we have approval for this project moving forward? This is the outstanding item from getting approval with Winston-Salem stormwater and erosion control for project approvals. Will we be able to get an approval document to submit to the City? Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal 4 51,1 MORRIS & RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mra-qta.com eata 1979-2024 From: Lawyer, Mike<mike.lawyer@ deg.nc.gov> Sent: Friday,July 26, 2024 9:05 AM To:Jeremy Keeny<JKeenv@mragta.com>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; Holland, Brianna <brianna.holland@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Cc: Kenneth Binkley<Kenneth.Binkley@PulteGroup.com> Subject: RE: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) Jeremy, With the loss of several staff members and the current workload of post-construction stormwater applications,we generally do not have the availability for meetings.Also, due to the recently reduced statutory timeframes for review of applications/response to comments,we will not be granting any extensions to provide requested additional information. Michael Lawyer, CPSWQ Stormwater Program Supervisor Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-3639 1 Cell: (984) 232-1136 Email: mike.lawyera-deg.nc.gov 512 North Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) E � ar�...uRvi r.rnrrr�rv�oc�nr�`� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Jeremy Keeny<JKeenv@mragta.com> Sent:Thursday,July 25, 2024 4:02 PM To: Eplin,Tamera <tamera.eplin@deq.nc.gov>; Holland, Brianna <brianna.holland@deq.nc.gov>; Lawyer, Mike <mike.lawyer@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Cc: Kenneth Binkley<Kenneth.Binkley@PulteGroup.com> Subject: RE: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Mike/ Brianna, 5 never heard back from you all regarding a meeting, so we went ahead and resubmitted to keep the project moving forward. We'd still like to get a time to meet to go over the comments and responses to insure that we get everything addressed with this review. Can you please let me know some days/times that you have available to discuss? Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal ., MORRIS & RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mra-qta.com 2yeata 1979-2024 From:Jeremy Keeny Sent: Monday,July 15, 2024 3:38 PM To: Eplin,Tamera <tamera.eplin@deg.nc.gov>; Brianna.holland@deg.nc.gov; Mike.lawyer@deg.nc.gov Cc: Kenneth Binkley<Kenneth.Binkley@PulteGroup.com> Subject: RE: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) Mike/ Brianna, I understand that you were able to have a conversation last week with Ken Binkley with Pulte Homes regarding Fiddlers Creek. We have the comments addressed and are ready to resubmit, but per that conversation, would like to have a Teams call to go through and make sure we are understanding the comments correctly and that our responses address your concerns. Could you let me know if you have availability over the next couple of days to get this meeting in place? Also, in the past, Jim would accept an email request for additional time to resubmit. Is that howyou all would like to see that come in? We would like to request additional time on this project so that we can hopefully have the meeting and make sure everything is addressed and ready to approve. Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal MORRIS & RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mra-qta.com eata 1979-2024 From: Eplin,Tamera <tamera.eplin@deg.nc.gov> Sent:Thursday,June 27, 2024 9:21 AM To:Jeremy Keeny<JKeeny@mragta.com> Subject: RE: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) 6 Our stormwater program is losing 3 people within last/this week. Your best bet is to call the main number at 919- 707-9220 and ask for available staff in the Stormwater Program. Our current Stormwater supervisor is Mike Lawyer. Regards, Tamera Eplin, PE Regional Engineer Land Quality Section, Winston-Salem Regional Office Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality (336)776-9800 office (336)776-9654 direct tamera.eplin@deq.nc.gov(New email address) 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105-7407 NORTH CAROLINA O=EQ 0�1 Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Jeremy Keeny<JKeeny@mragta.com> Sent:Thursday,June 27, 2024 8:50 AM To: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Cc: Eplin,Tamera <tamera.eplin@deq.nc.gov> Subject: [External] RE: SW4231201; Fiddlers Creek Farm (Forsyth) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning. Following up on the below request to have a meeting to discuss comments. As it appears Mr. Farkas'last day is tomorrow, please advise who to speak with and when there is availability. Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal , MORRIS & RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mragta.com 'yea�� 1979-2024 From:Jeremy Keeny Sent: Friday,June 21, 2024 4:57 PM To: Farkas,Jim J <Jim.Farkas@deq.nc.gov> 7 Cc: Eplin,Tamera <tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: SW4231201; Fiddlers Creek Farm (Forsyth) Jim, Can we get a Teams meeting scheduled to go over the remaining comments and make sure we're on the same page? I want to make sure this next submittal gets you what you need to approve! Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal MORRIS & RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mra-qta.com 2yeata 1979-2024 From: Farkas,Jim J <Jim.Farkas@deg.nc.gov> Sent: Monday,June 17, 2024 4:45 PM To:Jared Medwar<JMedwar@mragta.com>; chris.raughley@pultegroup.com;Jeremy Keeny<JKeeny@mragta.com> Cc: Eplin,Tamera <tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: SW4231201; Fiddlers Creek Farm (Forsyth) Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on March 19, 2024. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thanks, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919)707-3646 Jim.farkasPdeq.nc.gov D- E kj /� NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 8 From: Farkas,Jim J Sent:Thursday, February 29, 2024 11:14 AM To:Jared Medwar<JMedwar@mragta.com>; chris.raughley@pultegroup.com;Jeremy Keeny<JKeenv@mragta.com> Cc: Eplin,Tamera <tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: SW4231201; Fiddlers Creek Farm (Forsyth) Good Morning, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on December 6,2023.A review of that information has determined that the application is not complete.Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thanks, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919)707-3646 Jim.farkasPdeq.nc.gov D_ E � NORTH CAROLINA kipi Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Wednesday, December 6, 2023 2:46 PM To:Jared Medwar<JMedwar@mragta.com>; chris.raughley@pultegroup.com;Jeremy Keeny<JKeenv@mragta.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera<tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: SW4231201; Fiddlers Creek Farm (Forsyth) Good Afternoon, We received your post-construction stormwater permit application for the subject project on 12/6/23. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deg.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the 9 "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW4231201 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstruction@deq.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov NORTH CAHOLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Jared Medwar<JMedwar@mragta.com> Sent:Wednesday, December 6, 2023 2:03 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; chris.raughley@pultegroup.com;Jeremy Keeny<JKeenv@mragta.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Fiddlers Creek Farm;Winston-Salem, Forsyth County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Yes, I have attached them to this email. Thanks! Jared 10 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Wednesday, December 6, 2023 1:50 PM To:Jared Medwar<JMedwar@mragta.com>; chris.raughley@pultegroup.com;Jeremy Keeny<JKeeny@mragta.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Fiddlers Creek Farm;Winston-Salem, Forsyth County Hi Jared, Can you please share these as attachments to the email?We don't accept links as submissions. Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.Peck@deg.nc.gov NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Jared Medwar<JMedwar@mragta.com> Sent:Wednesday, December 6, 2023 11:34 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; chris.raughley@pultegroup.com;Jeremy Keeny<JKeeny@mragta.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Tamera<tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Fiddlers Creek Farm;Winston-Salem, Forsyth County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Kaitlin, We have updated the forms and documents pages as requested, as well as provided the additional pages to the O&M agreement. In the file share below you will find the following information: 1. Updated sheet of section III , 4-with the contact information for Forsyth Counties building permit contact. 2. Updated sheet of section IV, 8—With an updated impervious percentage using the updated project area that shows total project area subtracted from water surface areas. 11 3. Updated sheet of section IV, 10—With the square footage column revised to match the appropriate numbers. 4. Additional O&M Agreement sheets. File share Link: https://cloud.mragta.com/index.php/s/fHQgerVTJYrNxoo Please let me know if anything else is needed or if you have trouble accessing the file share link provided in this email. Thanks! Jared From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent: Monday, December 4, 2023 11:07 AM To:Jared Medwar<JMedwar@mragta.com>; chris.raughley@pultegroup.com;Jeremy Keeny<JKeenv@mragta.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera <tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Fiddlers Creek Farm;Winston-Salem, Forsyth County Good Afternoon, We received additional information for your application for a new post-construction stormwater permit on 12/1/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items by close of business on 12/15/23 so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): • Section III, 4—Please provide the contact information (email address and phone number)for the local jurisdiction for building permits. • Section IV, 8—The percent impervious area for the project area does not appear to be calculated correctly. Project density calculation information can be found in 15A NCAC 02H .1003(1). • Section IV, 10—Please correct the typo made in the "total (sf)"for Drainage Area 2 in the Basin Information Table. • 1x original, signed & notarized hard copy of the O&M Agreement Form (This item is required per 15A NCAC 02H .1042(2)(j) and per Sections V &VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete O&M Agreement Form will have 2 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. NOTE: Only the cover page was provided, please make sure to click"load pages"to provide the additional pages specific to the SCM type. NOTE:As no plan sheets, notaries,or original signatures are needed,you can submit these additional items via email so that I can print them and add them to your existing application.Thank you. 12 NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D7:.,.E Q NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 13 From: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Sent:Thursday, November 16, 2023 8:41 AM To:Jared Medwar<JMedwar@mragta.com>; Peck, Kaitlin<kaitlin.peck@deg.nc.gov>; chris.raughley@pultegroup.com; Jeremy Keeny<JKeeny@mragta.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera <tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Fiddlers Creek Farm;Winston-Salem, Forsyth County That's fine. Post-construction stormwater is on the 6t" floor of the Archdale Building. Please let me know when you would be coming by to pick them up. If you have any trouble getting up to the 6t"floor, please give me a call at the phone number in my signature. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.Peck@deg.nc.gov z:���D_ E NORTH CAROL NA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:Jared Medwar<JMedwar@mragta.com> Sent:Thursday, November 16, 2023 8:36 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; chris.raughley@pultegroup.com;Jeremy Keeny<JKeeny@mragta.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera<tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: [External] RE: Fiddlers Creek Farm;Winston-Salem, Forsyth County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Kaitlin, Thank you for the response! We will ensure to get the proper applications and information to you. Is it possible for us to pick up the submittal package so that we can ensure all of the correct items can be resubmitted together? Thanks! Jared From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Wednesday, November 15, 2023 1:19 PM 14 To: chris.raughley@pultegroup.com;Jeremy Keeny<JKeenv@mragta.com>;Jared Medwar<JMedwar@mragta.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Fiddlers Creek Farm;Winston-Salem, Forsyth County Good Afternoon, We received your application for a new post-construction stormwater permit on 11/15/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 12/15/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • Please be aware that, effective October 1, 2023, the Fast-Track permitting option has been eliminated (The Fast- Track option is still available for those projects that have filed their Fast-Track application on or before the effective date). For this project, you will need to apply for post-construction stormwater coverage through the Standard permitting option. • 1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section 12.14(e)(2)): • Please be aware that, effective October 3, 2023, our permit application fee structure is as follows: • New Permit or Major Modification for a project with one (1) or fewer SCMs=$1,000 • New Permit or Major Modification for a project with two (2) SCMs=$1,250 • New Permit or Major Modification for a project with three (3) SCMs=$1,750 • New Permit or Major Modification for a project with four(4) or more SCMs= $2,250 • Minor Modification =$250 • Renewal =$750 • Transfer=$750 • Renewal &Transfer Combination =$1,500 • General Permit=$700 • Per the submittal items, this project will require an application fee of$1750 as this application is for a New Permit for a project with 3 SCMs. Please provide a new application fee check in this amount so that we may process your application. NOTE: Despite being included in the transmittal letter, we did not receive an application check. • 2x hard copies of the Standard Process Application (This item is required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application). • The following errors were noted in the Fast-Track application. Please make sure to correct these items when filling out the Standard Application. • Section III, 2b—Please provide the contact information (email address and phone number)for the property owner. • 1x hard copy of the complete, original signed Supplement-EZ Form (This item is required per Sections V&VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- 15 program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. • 1x original, signed & notarized hard copy of the O&M Agreement Form (This item is required per 15A NCAC 02H .1042(2)(j) and per Sections V &VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete O&M Agreement Form will have 2 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. NOTE: It is recommended to get a second copy of this form signed & notarized for the Applicant's records (it will be helpful when they go to record it with the Register of Deeds). • 2x hard copies (one original) of the deed restriction document(This item is required per 15A NCAC 02H .1003(7), 15A NCAC 02H .1042(2)(k), and Sections VI, 2 &VII). More information can be found on our website: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/post-construction-program/post-construction-forms • 1x hard copy of official documentation showing that the Applicant is in good standing with the Secretary of State and showing the title and position information for the signing official (These items are required per 15A NCAC 02H .1040(1), .1042(2)(b), and per Section VI, 11 of the Application). • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: • Signature and seals. • Wetland delineation or a note on the plans stating that there are no wetlands located on-site.This item is required per 15A NCAC 02H .1042(2)(g)(iii) &Section VI, 8m of the Application. Please also list the name of the individual that made this determination in a note on the plans. NOTE:A note for non-tidal wetlands was included in the key, but was not able to be distinguished on the plans. Please provide clearer delineation for wetlands. (If there are no wetlands located on site, include a note on the plans stating that there are no wetlands on site. NOTE: Please do not resubmit plan sheets that are unnecessary for post-construction stormwater review. Only submit the sheets in the set that are pertinent to our review. NOTE:While not necessary for administrative completeness, the following issue may come up in technical review.There appears to be some development proposed in the vegetated setback. Please keep in mind that no development is allowed in the setback until it meets the requirements of G.S. 143-214.7(b2)(2). NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: 16 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D_ E NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. F TION: This email originated from outside the organization. Do not click links or open attachments unless you nize the sender and know the content is safe. CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. 17 CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. 18