Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8211201_Current Permit_20220609
ROY COOPER rp *, � a NTH.S. `‘‘1Y ° SaselerY BRIAN WRENN NORTH CAROLINA. Drrr ErtvircommiAlf(away June 2022�/9,202 (T WLM PROPCO, F'E'.0 Attn:Benjamin H.Eberdt,Member-Manager 3717 Bentley Drive Durham,NC 27707 Subject: Post-Construction Stormwater Management Permit No.SWS 211201 GoDog Pet Hospitality Services Building High Density Project New Hanover County Dear Mr.Eberdt: The Division of Energy,Mineral and Land Resources received a complete Post-Const action Stormwater Management Permit Application for the subject project on March 17,2022. Staff review of the plans and specifications has determined that the project,as proposed,complies with the Stonnwater Regulations set forth in Title 15A NCAC 2H.1000 amended on January 1,2017(2017 Rides). We are hereby forwarding Permit No. SWIt 211201 dated June 9;2022,for the construction,operation and maintenance of the bl areas(BETA) and urmwater control measures(SCMs)associated with the subject project. This permit shall be effective from the date of issuance until June 9,2030 and does not supersede any other agency permit that be .. The project shall be sit to the conditions and limitations as specified therein. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not ale except after notice to and approval by the Division. If any Pi,requirements,or limitations contained in this permit are unacceptable,you have the right to request an aiiiiidicatory hearing by filing a written petition with the Owe of Administrative Hearings(OAH). The wrkten petition must conform to Charter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty(30)days&receipt of this permit. You should contact the OAH with all questions Wig. the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714,or via one at 919-431-3000,or visit their website at www.NCOAH_c om.Unless such demands are made this perms shall be final and binding If you have any questions concerning this permit,please contact Steve Pusey in the Wilmington Regional Office, at phone#(910)796-7215 or stew en_pusey@pcdenr.gov. Sincerely, 211)Q CA t)*e.t. J. Brian Wrenn,Director Division of Energy,Mineral and Land Resources Enclosures: Attach A—Designer's Certification Form Applicatem Documents DES/sgp: 11\Stormvvater\Permits& Q12021\21120I HD\2022%permit 211201 cc: John Ttmstall,PE or Jason Clark,PE,Norris&Tunstall Consulting Engineers,PC New Hanover County Binkhng Safety Department New Hanover Engmeenng Department NCDOT District Engineer Wiln n Regional Office Stonnwater File en...401E North Carolina Department a Enviro m�entaI I DMisian of ,nine and Land Resources MAMBA 4lldam> n Rer o E)E[ice I. C' dfua[D rIve F. rension I V Mar!h Carolina 28 910.7963215 Post-Construction Stormwater Management Permit No. SW 211201 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO WLM PROPCO, LLC GoDog Pet Hospitality Services Building 8130 Market Street, Wilmington, New Hanover County FOR THE construction, management, operation and maintenance of built-upon area (BUA) for one (1) wet detention pond and one (1) level spreader-vegetated filter strip ("stormwater control measures" or "SCMs") discharging to Class SA-HQW waters as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until June 9, 2030 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 87,120 square feet. The runoff from all BUA within the permitted high density drainage area of this project must be directed into the permitted SCMs. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCMs have been designed to handle the runoff from 87,120 square feet of BUA within the delineated drainage area. The BUA for the future development is limited to 5,796 square feet. 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. Page 1 of 5 Post-Construction Stormwater Management Permit No. SW 211201 3. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCMs are permitted based on the design criteria presented in the sealed, signed and dated supplements and as shown in the approved plans and specifications. These SCMs must be provided and maintained at the design condition. b. SCM DESIGN FOR SA WATER. The SCMs provide runoff treatment for the difference between the pre- and post-development runoff volumes for the one-year, 24-hour storm event and have demonstrated that it is not feasible to meet the minimum design criteria for an infiltration system. The stormwater is filtered through a minimum of 18 inches of sand prior to discharge. The discharge is directed to a level spreader—filter strip, and the excess runoff is released at a non-erosive velocity at the edge of the vegetated setback or to an existing stormwater drainage system. c. PLANTING PLAN. The SCM landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established, the operation and maintenance agreement must be followed. d. FOUNTAINS. At this time, a decorative spray fountain has not been proposed within the wet pond. Decorative spray fountains will be allowed in the wet pond if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. e. IRRIGATION. If the wet pond is to be used for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. A STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 5. VEGETATED SETBACKS. A 50-foot-wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. 6. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds: a. EASEMENTS. All SCMs, stormwater collection systems, vegetated conveyances, and maintenance access located on property owned by other persons or entities must be located in permanent recorded easements or drainage easements as shown on the approved plans. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. If a final plat is recorded, it must reference the operation and maintenance agreement and must also show all public rights-of-way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. d. DEED RESTRICTIONS AND PROTECTIVE COVENANTS. The permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. Page 2 of 5 Post-Construction Stormwater Management Permit No. SW211201 7. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on-site stormwater system will be repaired immediately. a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment-Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. 8. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any infiltrating permeable pavement, #57 stone area, public trails, or landscaping material to be considered a pervious surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 9. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 10. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. Page 3 of 5 Post-Construction Stormwater Management Permit No. SW 211201 a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on- site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 12. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 13. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur; v. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 14. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review and routinely monitor the project to ensure continued compliance with the conditions of the permit, the approved plans and specifications. b. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. Page 4 of 5 Post-Construction Stormwater Management Permit No. SW 211201 c. MAINTENANCE ACCESS. SCMs, stormwater collection systems, and vegetated conveyances must be accessible for inspection, operation, maintenance and repair as shown on the approved plans. d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. f. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions. g. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. h. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 9th day of June 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Cfivo*,<J, (40) Brian Wrenn, Dire or Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 211201 Page 5 of 5 Post-Construction Stormwater Management Permit No. SW211201 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As-Built Permittee Certification • As-Built Designer's Certification General MDC • As-Built Designer's Certification for Wet Detention Pond Project • As-Built Designer's Certification for Level Spreader and Vegetated Filter Strip MDC A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. Page 1 of 1 Post-Construction Stormwater Management Permit No. SW 211201 AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. _ Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast Track As-built Package Submittal. Printed Name Signature , a Notary Public in the State of County of , do hereby certify that personally appeared before me this day of , 20 and acknowledge the due execution of this as-built certification. (SEAL) Witness my hand and official seal My commission expires Permittee's Certification NCAC .1042(4) CP TIe ted I N/'A 1 . ded DEED RF8TRICTIONS!BUA RECORDS L_. 1. The deed restrictions and protective covenants have been recorded Y or N and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants Y or N has been provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note Y or N 1) B. MAINTENANCE AccEss 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 1 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1. The SCMs and the components of the runoff collection /conveyance Y or N system are located in recorded drainage easements. _ 2. A copy of the recorded plat(s) is provided. Y or N D. SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that ,y or N have an SCM include the following: 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in Y or N NCGS 143 Article 21 if the SCM is removed, relocated or altered _without prior approval. _ E. OPERATION AND MAINTENANCE AGREEMENT Y ter N 1. The O&M Agreement is referenced an the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and Y or N appears in the chain of title- F. OPERATION AND MAINTENANCE PLAN — maintenance records are being kept in a known set location for each SCM and are available for Y or N review. Page 1 of 8 Post-Construction Stormwater Management Permit No. SW 211201 Completed / NIA Provided G. DESIGNER'S CERTIFICATION FORM —has been provided to the or N` Division. Note 1-Acceptable records include ARC approvals, as-built surveys, and county tax records. Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach additional sheets as needed. Page 2 of 8 Post-Construction Stormwater Management Permit No. SW 211201 AS-BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules H and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? • Check here if this is a part of a Fast-Track As-Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: O Circle N if the as-built value differs from the Plan. If N is circled, provide an explanation on Page 2. ON/E= not evaluated (provide explanation on page 2) ®N/A= not applicable to this SCM or project. r Consultant's Certification NCAC .1003((3) &general MCrC @As-built I ONIE ON/A .1050 1 A. TREATMENT REQUIREMENTS II _ 1. The SCM achieves runoff treatment. Y or N r 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is Y or N bypassed. 4. Runoff from offsite areas and/or existing BUA is directed Y or N into the permitted SCM and is accounted for at the full build-out potential. 5. The project controls runoff through an offsite permitted Y or N SCM that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project Y or N has been accounted for at the appropriate design storm level. 7. The SCM(s) meets all the specific minimum design Y or N criteria. _ B. VEGETATED SETBACKS I MIA 1. The width of the vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 Y or N (b2)(2) is located in the setback. Page 3 of 8 Post-Construction Stormwater Management Permit No. SW 211201 OAs-built ON/E CONGA 4. BUA that does not meet the requirements of NCGS 143- I Y or N 214.7 (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water-dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at Y or N the edge of the setback and allowed to flow through the setback as dispersed flow. C. STORMWATER OUTLETS—the outlet handles the peak j flow from the 10 year storm with no downslope erosion. i Y or N 4 g_ VARIATIONS, 1. A variation (alternative) from the stormwater rule Y or N provisions has been implemented. 2. The variation provides equal or better stormwater control Y or N and equal or better protection of surface waters. E. )YPLIANCE WITH OTHER REGULATDkr =#ullli6:1 i has been met. Y or N F SIZING -the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required Y or N storm depth. G. CONTAMINATED SOILS—infiltrating SCM's are not Y of N located in or on areas with contaminated soils. I H. SIDE SLOPES _ 1. Vegetated side slopes are no steeper than 3H:1 V. Y or N 2. Side slopes include retaining walls, gabion walls, or Y or N other surfaces that are steeper than 3H:1 V. 3. Vegetated side slopes are steeper than 3H:1 V (provide Y or N • sujporting documents for soils and vegetation). _ I. EROSION PROTECTION - -1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the Y or N discharge point during the peak flow from the 10 year storm. J. EXCESS. FLOWS_An overflovrr/bypass has been Y car 1+i ovided. IK. DEWATERING —A method to drawdown standing water has ' Y car N been provided to facilitate maintenance and inspection. L CLEANOUT AFTER CONSTRUCTION —the SCM has been y or N cleaned out and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes Y or N >3:1. _ N. RAVER QUALIFICATIONS [FAST-WRACK PERMIT)— The designer is licensed under Chapters 89A, 89C, 89E, or Y or N 89F of the General Statutes- _Provide an explanation for every MDC that was not met, and for every item marked "N/A" or"N/E", below. Attach additional pages as needed: Page 4 of 8 Post-Construction Stormwater Management Permit No. SW 211201 AS-BUILT DESIGNER'S CERTIFICATION FOR WET DETENTION POND PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1053, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast-Track As-Built Package Submittal per .1044(3). Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: 0 Circle N if the as-built value differs from the Plan/permit. If N is circled, provide an explanation on page 2 ©N/E= not evaluated (provide explanation on page 2) ©N/A= not applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under NCACO2H.1050 1- Consultant's Certification (MDC .1053) DAs-built I ON/E ON/A i A. Foreoav i iths/ Fountain �~ ' 1j 1. The available Sediment storage is consistent with the Y or N approved plan and is a minimum of 6 in. 2. Water flow over the forebay berm into the main pond Y or N occurs at a non-erosive velocity. 3. The provided Forebay Volume is 15%-20% of the main Y or N pool volume. 4. The Forebay entrance elevation is deeper than the exit Y or N elevation into the pond. 5. The Average Design Depth of the main pond below the permanent pool elevation is consistent with the permitted Y or N value? 6. Fountain documentation is provided. Y or N B. Side slopes i Banks(Vegetated Shelf `_J 1. The width of the Vegetated Shelf is consistent with the Y or N approved plans and is a minimum of 6 feet. 2. The slope of the Vegetated Shelf is consistent with the Y or N approved plans and is no steeper than 6:1. C. As-built Main Pool i Areas i Volumes i Elevations ' 1. The permanent pool surface area provided is consistent Y or N with the permitted value. i 2. The Temporary Pool Volume provided is consistent with Y or N the permitted value. 3. The permanent pool elevation is consistent with the Y or N permitted value. Page 5 of 8 Post-Construction Stormwater Management Permit No. SW 211201 DAs-built f ON/E CON/A I 4. The temporary pool elevation is consistent with the Y or N permitted value. D. Inlets I met►Drarvdawn 1. The design volume draws down in 2-5 days. Y or N 2. The size of the Orifice is consistent with the permitted Y or N value. 3. A trash rack is provided on the outlet structure. Y or N 4. Hydrologic impacts to the receiving channel are minimized Y or N from the 1 yr 24 hr storm discharge? 5. The inlets and the outlet location are situated per the Y or N approved plan and avoid short-circuiting. E. Veget an -- - -- - 1. The vegetated shelf has been planted with a minimum of 3 Y or N diverse species. 2. The vegetated shelf plant density is consistent with the approved plans and is no less than 50 plants per 200 sf or Y or N no less than 24 inches on center. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or"N/E" below. Attach additional pages as needed: Page 6 of 8 Post-Construction Stormwater Management Permit No. SW 211201 AS-BUILT DESIGNER'S CERTIFICATION LEVEL SPREADER AND VEGETATED FILTER STRIPS MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed Level Spreader and Vegetated Filter Strip MDC found in NCAC 02H.1059 in accordance with the permit documents, plans and specifications on file with or provided to the Division', except as noted on the "AS-BUILT' drawings, such that the intent of the stomiwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? Check here if this is a part of a Fast-Track As-Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: @ Circle N if the as-built value differs from the Plan. If N is circled, provide an explanation on Page 2. ON/E= not evaluated (provide explanation on pale 2) ON/A= not applicable to this SCM or project. Consultants Certification n NCAC D2H.1059 I ` (DAB-built !mMrE ON/A A. SIZING 1. The length of the Level Spreader is a minimum of 10 feet Y or N per 1 cfs. 2. The Level Spreader receives flow directly from the Y or N Drainage Area, and is sized based on the flowrate for a design storm of 0.75 inches per hour. 3. The Level Spreader receives flow from an SCM and is Y or N sized based on the drawdown rate of the design volume. 4. The Level Spreader has a flow bypass system for larger Y or N storm events. 5. The Level Spreader is sized to handle the 10 year storm Y or N flow and does not provide a flow bypass system. 6. The minimum width of the Vegetated Filter Strip is 30 Y or N feet measured perpendicular to the level lip. 7. A blind swale or other means of ponding water is Y or N provided upslope of the Level Spreader. 8. The blind swale provides for uniform overtopping into the Level Spreader. B. LEVEL SPREADER SPECIFICATIONS 1. The lip of the Level Spreader is at a uniform elevation Y or N and has a construction tolerance of+0.25 inches at any point along its length. 2. The Level Spreader is constructed of concrete or other Y or N stable material. Page 7 of 8 Post-Construction Stormwater Management Permit No. SW 211201 CD-As-built I ON/E I ®N 3. The shape of the Level Spreader is straight or convex inn Y or N plan view. 4. Downslope of the Level Spreader, there is a 1-3 inch Y or N drop followed by a Transition Zone at least 12 inches wide that is protected from erosion by aggregate or high performance turf reinforcement matting. C. FILTER STRIP SPECIFICATIONS 1. The filter strip does not contain any draws or channels. Y or N 2. The filter strip has been graded with a uniform transvers Y or N slope of eight percent or less. 3. The pH, compaction and other attributes of the first 12" of soil within the filter strip have been adjusted to promote plant establishment and growth. 4. The filter strip and side slopes have been planted with non-clumping deep-rooted grass sod. 5. During construction, the soil was stabilized with temporary measures until the permanent vegetation took root, or the runoff was directed elsewhere until the vegetation established. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or"N/E", below. Attach additional pages as needed: Page 8 of 8 DEMLR USE ONLY Date Received Fee Paid Permit Number o�k 12./,fsi Rau, 2./23/27, 4 I toil $Sos -- Susg 2-t 120 I Applicable Rules: 0 Coastal SW—1995 0 Coastal SW—2008 0 Ph II-Post Construction (select all that apply) 0 Non-Coastal SW-HQW/ORW Waters 0 Universal Stormwater Management Plan 0 Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM . t This form may be photocopied for use as an original � 1� , I. GENERAL INFORMATION NM) Noll ' 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): 0 2. Location of Project(street address): 8130 Market Street City:Wilmington County:isIew Hanover Zip:28411 3. Directions to project(from nearest major intersection): jmm Business 17(Market St.)&Porters Neck Rd,intersection,head South on Market St.for 1.805'. ?reject will be on the left. 4. Latitude:34°17'48.4"N Longitude:77°47'35.5"W of the main entrance to the project. IL PERMIT INFORMATION: 1.a.Specify whether project is(check one): ®New []Modification []Renewal w/Modificationt tRenewals with modifications also requires SWU-102—Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: [Not Started ['Partially Completed* ❑Completed* *provide a designer's certification 2. Specify the type of project(check one): []Low Density i2 High Density ®Drains to an Offsite Stormwater System :Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application,list the stormwater project number, if assigned, and the previous name of the project,if different than currently proposed, 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): DCAMA Major ®Sedimentation/Erosion Control:3.28 ac of Disturbed Area QNPDES Industrial Stormwater 0404/401 Permit:Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ►X4 No Dyes If yes,see S.L.2012-200,Part VI:http:/iportal.ncdenr.org/web/lr/rules-and-regulations flEC E I V E FEB 2 3 c BY: Form SWU-101 Version Oct.31,2013 Page 1 of 6 III. CONTACT INFORMATION 1.a.Print Applicant/Signing Official's name and title(specifically the developer,property owner,lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:WLM PropCO,LLC Signing Official&Title:Benjamin H.Eberdt,Member b.Contact information for person listed in item la above: Street Address:3717 Bentley Drive City:Durham State:NC Zip:27707 Mailing Address(if applicable):Same as Above City: State: Zip: Phone: (919 ) 812-8084 Fax: ( ) N/A Email:ben.eberdt@gmail.com c.Please check the appropriate box.The applicant listed above is: ®The property owner(Skip to Contact Information,item 3a) 0 Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ❑Developer*(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official&Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address(if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official&Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits:New Hanover County Building SafetyA EC E IFE Point of Contact:Nicholas Gadzekpo,Director Phone#: (910 ) 798-7456 FEB 232. 22 BY: Form SWU-101 Version Oct. 31,2013 Page 2 of 6 'IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. Stormwater will be treated by an onsite pond. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: 0 Approval of a Site Specific Development Plan or PUD Approval Date: El Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: El Coastal SW—1995 El Ph II—Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area:3.23 acres 5. Total Coastal Wetlands Area:0 _ acres 6. Total Surface Water Area:0 acres 7. Total Property Area(4)—Total Coastal Wetlands Area(5)—Total Surface Water Area(6)=Total Project Area+: 3.23 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures,the area between the banks of streams and rivers,the area below the Normal High Water(NHW)line or Mean High Water (MHW)line,and coastal wetlands landward from the NHW(or MHW)line. The resultant project area is used to calculate overall percent built upon area(BUA). Non-coastal wetlands landward of the NHW(or MHW)line may be included in the total project area. 8. Project percent of impervious area:(Total Impervious Area/Total Project Area)X 100 =61.88 %a 9. How many drainage areas does the project have?1 (For high density,count 1 for each proposed engineered stormwater BMP. For low density and other projects,use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area_ Receiving Stream Name Pages Creek Stream Class * SA;HQW Stream Index Number* 18-87-22 Total Drainage Area(sf) _ 140,780 On-site Drainage Area(sf) 140,780 Off-site Drainage Area(sf) 0 Proposed Impervious Area**(sf) 87,120 %Impervious Area**(total) 61.88% Impervious'Surface Area Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area On-site Buildings/Lots(sf) 21,658 On-site Streets (sf) --- On-site Parking (sf) 40,796 On-site Sidewalks (s 2,804 °"�•i Other on-site (sf) � 16,066 , D Future(sf) \\\ 5,796 1 Off-site (sf) 0 Existing BUA***(sf) 0 Total (sf): 87,120 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classiftcations ** Impervious area is defined as the built upon area including,but not limited to,buildings,roads,parking areas, sidewalks,gravel areas,etc. ***Report only that amount of existing BUA that will remain after development.Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31,2013 Page 3 of 6 11. How was the off-site impervious area listed above determined?Provide documentation.Areas were measured from AutoCad. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&M)forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy,Mineral and Land Resources(DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map athttp://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. als 1. Original and one copy of the Stormwater Management Permit Application Form. ( / 01% — 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants ! k1L Form.(if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed,signed and dated)and O&M w7 agreement(s)for each BMP. 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review,refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative(one to two pages)describing the stormwater treatment/management fo 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'mile of the site boundary,include the 1/2 mile radius on the map. 7. Sealed,signed and dated calculations(one copy). L ' J 8. Two sets of plans folded to 8.5"x 14"(sealed,signed,&dated),including: reri I a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures,the banks of streams or rivers,and the MHW(or NHW)of tidal waters. i. Dimensioned property/project boundary with bearings&distances. j. Site Layout with all BUA identified and dimensioned. A. Existing contours,proposed contours,spot elevations,finished floor elevations. �•r 1. Details of roads,drainage features,collection systems,and stormwater control mea m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated b qualified person. Provide documentation of qualifications and identify the perso whit M`�' �'• made the determination on the plans. ``, 6 n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff cal 'ons. o. Drainage areas delineated(included in the main set of plans,not as a separate docum p. Vegetated buffers(where required). Form SWU-101 Version Oct.31,2013 Page 4 of 6 9. Copy of any applicable soils report with the associated SHWT elevations(Please identify _C., Qo1.0a.--- elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs.Include an 8.5"x11"copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration flIVIPs,the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WIRO:Schedule a site visit for DEMLR to verify the SHW F prior to submittal.[91O)796-7378.) 10. A copy of the most went property deed.Deed b©ulc lt13 52f Page No:1226- 29 l J „�, 11. For corporations and limited liability corporations(LLC):Provide documentation from the NC iri 0 1_A,� Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item la,2a,and/or 3a per 15A NCAC 213.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. htip://www. ecretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot if lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http 1/portal.ncdenr-org/webilrLstate- stormwater-form does.Download the latest versions for each submittal. in the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s)below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR,and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Bngineer.Tohn S.TunstalL_P__.E.or T.Eason Clark.P.E.. Consulting Finn:Norris& unstall Consulting Engineers,P.C. Mailing A+ddress:2612_Iron(hate Drive.Sul 102 Cit+'Wilmington .State:I C Zip:4412 Phone: (910 ) 34-9 _ --- Fax: (910 l 343-.9604 Email:jtunstallenten ine m r dark@ntenaineerseon cr• anoIri 'neers rom e IX. PROPERTY OWNER AUTHORIZATION(f Contact Information,item 2 has been filled out,complete this section) I,(print or type name of person listed In Contact Information,item 2a) ,certify that I own the property identified in this permit application,and thus give permission to(print or type name of person listed in Contact Information,item in) with(print or type name of organization listed in Contact Information,item la).. to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the storrnwater system. E V E'V 'i FEB 2 3 Z 22 BY: .�.. Form SWU-itll Version Oct.31,2013 Page 5 of 6 '-b`"'Y'.,t....J •+••••w a.auuay..a�aab�,auaa�auaaaau,aatu abacc try iiay b15ltaLUJC meow,UM(u my uesignareu agent(entity listed in Contact Information,item 1)dissolves their company and/or cancels or defaults on their :lease agreement,or pending sale,responsibility for compliance with the DEMLR Stonnwater permit reverts back to me,the property owner.As the property owner,it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the _ ent of ci ' of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: Date: 2—/X— Z I• 1 tVCotlIAA ,a Notary Public for the State of (D1 VI CA-,County of a'tC1 1Q do hereby y certify that Ra11111,444 1 v► MOCK01-1- personally appeared before me this l day of COMACANU , 2622 ,and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, CeAltis SEAL Misty N.Oakley Notary Public-North Carolina Granville County My Commis.*Empires April>:,2a2s a�.w My commission expires i `6 S X. APPLICANT'S CERTIFICATION I,(print or type name of person listed in Contact Information,item la)Benjamin H.Eberdt certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of the applicable stormwater and 2.H.1000 and any other applicable state stormwater requirements. Signature: Date: 2 "/ i( 2 ?— I, `N11 S `t1 �(yl�,��,c� ,a Notary Public for the State of IA. �t t(O it bounty of et)if IU .do hereby certify that geY1 Cit.iµ VI 00ef G1,1- personally appeared before me this day of ilebY CAVIL ,and acknowledd due execution of the application for a stormwater permit. Witness my hand hand official seal, DA,tQ6, Misty N.Oakley SEAL Notary Public-North Carolina Granville County Misty N.Oakley My Commission Expires April a,2025 Notary Public-North Carolina Granvillej.nh County expires � I 2^15 My Commission Expires April 8 2025 My commission @ S CrV flECEIVE �m,, • FEB 2 3 BY: Form SWU-101 Version Oct.31,2013 Page 6 of 6 T T Operation & Maintenance Agreement Project Name: GoDog Pet Hospitality Services Building •si)t,q _lI.;Z,ol Project Location: 8130 Market Street, Wilmington, NC Cover Pa t e Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). N7 twill.- The SCM(s)on this project include(check all that apply&corresponding O&M sheets will be added automatically): 1 ` Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity:s Location(s): Wet Pond Quantity: 1 Location(s): See Plans Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader- Filter Strip Quantity: / Location(s): Ste_,"191&ft C Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Benjamin H. Eberdt Title&Organization: Member /WLM PropCO, LLC Street address: 3717 Bentley Drive City, state, zip: Durham, NC 27707 Phone number(s): 919-812-8084 Email: ben.eberdt@gmail.com Signature: Date: /0/2-2124 I, 1•....QQ II\q e?J , a Notary Public for the State of tip C— ( lai County of 1)x- rn , do hereby certify that A personally appeared before me this •,a� day of ® 9 1 and acknowledge the due execution of the Operations and Main nt. Witness my hand and official seal, . Maria C Cross t*� Notary Public "EC n Chatham County 1M • ey. f 20 Jiy Commission Expires �!' '� ' t\cB\' ...,Seal My commission expires STORM-EZ 10/12/2021 Version 1.5 O&M Agreement Page 1 of 1 Wet Pond Maintenance Requirements Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish - the plants on the vegetated shelf. _ Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. _ If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. _ At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. _ The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground pond erosive gullies have cover and water until it is established. Provide lime and a one- formed. time fertilizer application. The inlet pipe is clogged Unclog the pipe. Dispose of the sediment off-site. (if applicable). The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a design depth for sediment location where it will not cause impacts to streams or the SCM. storage. The forebay Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. ) i Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a design sediment storage location where it will not cause impacts to streams or the SCM. depth. The main treatment area Algal growth covers over Consult a professional to remove and control the algal growth. 50% of the area. Cattails, phragmites or Remove the plants by wiping them with pesticide (do not other invasive plants cover 50% of the basin surface. spray). Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, Plants are dead, diseased disease, etc. Remedy the problem and replace plants. or dying. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. The embankment A tree has started to grow Consult a dam safety specialist to remove the tree. on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clogging has occurred. Clean out the outlet device and dispose of any sediment in a gg g location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees. are growing on the mat. Floating wetland island (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state. missing. A=..- r• ! Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the wet pond are causing erosion Contact the local NCDEQ Regional Office. or sedimentation in the receiving water. ey.et, 011n? Wet Detention Pored Design Summary wet rond Diagram WET POND ID FOREBAY MAIN POND Pond 1 Permanent Pool El. 29 Permanent Pool El. 29 Temporary Pool El: 31.25 Temporary Pool El: 31.25 Pretreatment other Clean Out Depth: 6 Clean Out Depth: 6.5 than forebay? No Sediment Removal E 23 Sediment Removal E 22.5 Has Veg. Filter? Yes Bottom Elevation: 22 Bottom Elevation: 22 ATTACH ADDITIONAL SHEETS IF NECESSARY leo.% 4r..........,... . al,. D 1 ?p11 17 Level Spreader-Filter Strip Maintenance Requirements important operation and maintenance procedures: Immediately after the filter strip is established, any newly planted vegetation will be watered twice_ weekly if needed until the plants become established (commonly six weeks). _ Stable groundcover will be maintained in the drainage area to reduce the sediment load to the level spreader-filter strip. Every two weeks during the growing season, the filter strip will be mowed. Turf grass should not be cut - shorter than 4-6 inches and may be allowed to grow as tali as 12 inches depending on aesthetic requirements (NIPC, 1993). _ Once a year, the soil will be aerated if necessary and the filter strip will be reseeded to maintain a dense growth of vegetation. - Once a year, soil pH will be tested and lime will be added if necessary. For the fist two years after the LS-FS is established, it shall be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). After two years of successful performance, it will be inspected quarterly. Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire LS-FS Trash/debris is present. Remove the trash/debris. The flow splitter device is Unclog the conveyance and dispose of any sediment off-site. The flow splitter device(if clogged. applicable) The flow splitter device is Make any necessary repairs or replace if damage is too large for damaged. repair. The swale is clogged with Remove the sediment and dispose of it off-site. sediment. The blind swale The swale is overgrown Mow vegetation. Regrade and vegetate if the swale has become with vegetation. silted in. The level lip is cracked, settled, undercut, eroded or Repair or replace the lip. otherwise damaged. There is erosion around the Regrade the soil to create a berm that is higher than the level lip, end of the level spreader plant ground cover and water until it is established. Provide lime The level spreader that show stormwater has and a one-time fertilizer application. bypassed it. Trees or shrubs have :N.., begun to grow on the swale Remove the shrubs or trees. T" *� or just downslope of the Qk . level lip. ey a 202! Areas of bare soil and/or Regrade the soil if necessary to remove1h ully, plant gr (d erosive gullies have cover and water until it is established. Provide li d a e- formed. time fertilizer application. The bypass channel Turf reinforcement is Study the site to see if a larger bypass channel is needed damaged or ripap is rolling (enlarge if necessary). After this, reestablish the erosion control downhill. material. Level Spreader-Vegetated Filter Strip 1..laintenance Requirements(continued) SCM element: Potential problem: How to remediate the problem: Grass is too short or too Maintain grass at a height of approximately three to six inches. long. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground erosive gullies have cover and water until it is established. Provide lime and a one- formed. time fertilizer application. Sediment is building up on Remove the sediment and restabilize the soil with vegetation if the filter strip. necessary. Provide lime and a one-time fertilizer application. Grass is dead, diseased or Determine the source of the problem: soils, hydrology, disease, The filter strip dying etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time Plants are dead, diseased fertilizer application to establish the ground cover if a soil test or dying. indicates it is necessary. If sod was used, check to see that it was not grown on clay or impermeable soils. Replace sod if necessary. Nuisance vegetation is Remove vegetation by hand if possible. If pesticide is used, do choking out the grass. not allow it to get into the receiving water. Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the LS-FS are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water. 8y. ?0?, SUPPLEMENT-EZ COVER PAGE Sea$ i ! apt FORMS LOADED 1 *11161, PROJECT INFORMATION •---�amnarm.oarc�s-�.---/ 1 Project Name IGoDog Pet Hospitality Services Building 2 Project Area(ac) 3.23 — ---3 Coastal Wetland Area(ac) 0 .__ 4 SurfaceWater Area(ac) _.._—.—__._ -® —.�.__— —.—_ r 5 Is this project High or Low Density? 1 High Does this project use an off-site SCM? I No COMPLIANCE WITH 02H 1003(4) ( 7 Width of vegetated setbacks provided(feet) 0. 8 Will the vegetated setback remain vegetated? i NM 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? 10 Is streambank stabilization proposed on this project? I No iLEi1El AND TYPE OF SCii . ._.—.._. ._ --.— -— _..__— ....._.._—_ ......_.•..._.— _ —..,. 11 lrnuttra'tian Sysitem 1� VGift@C1tV0[N Loll [•-- ---__--_-'— —_--�_ -` 13 Wet Pond rY (4� 14 Stem-water j ------ �— ------- z \I► �. 115 Perm Bahia,Pavement 16 Sand Filter I T .....—_W-- ..___...___ _W^. �, ��j�t �*��? 17 Rainwater Harvesting(RWH) _T'--- ------ --_ — c. O/4 18 Green Roof __ 19 Level Spreader-Filter Strip(LS-FS) ^—y1 _ - —�`-- — 20 Disconnected Impervious Surface(DIS) _,,.__--_ • 21 Treatment Swale _ T T_— 22 D Pon d 23 Sterventer 24 SileII Call 25 Baytilter 21 Fiit rr FORMS LOADED DESIGNER CERTIFICATFON _ _ _ 27 Name and Title: T Jason Clark.P.E. 28 Organization: _ Nprris8l Tunstail Consuitt E_EgInearsP.C.-_ . 29 Street address: 2602 Iron Gate Drive,Suite 102— _ —._I 30 City,State,Zip: ___— Wilmington,NC 28412— _ —_,_-J 31 Phone number(s): _910_343�9653 32 Email: � jclarki ntengiineersecom Certification Statement I certify,under penalty of law that this Supplement EZ form and all supporting information were prepared under my direction or supervision,that the information provided In the form is,to the best of my knowledge and belief,true,accurate,and complete,and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here Designer wit 'IIHgIpIIN • Noje 4, ,1 SEAL fir-; = Signature Designer L 7.,.... olpfl v ""'..min imutii«"```� i/'' ?h 2Q2I Sea! I Date V DRAINAGE AREAS 1 Is this a high density project? Yes_ 1 2 If so,number of drainage areas/SCMs _ 2__` i 3 Does this project have low density areas? y_ No 1 4 If so,number of low density drainage areas 0 l Is all/part of this project subject to previous rule J 5 versions? i _No FORMS LOADED DRAINAGE AREA INFORMATION C _ ` -- - li ~ 1_;r_ � 'I 4 Type of SCM r __ __ -Wet Pond-.1 LS�FS '� 5 Total drainage area(sq ft) �_ 140780 7��_140780_ • _ 6 Onsite drainage area(sq ft) - 140780 140780 11 7 Offsite drainage area(sq ft) I _ jr 0 " �-.��— --0- ----1 8 Total BUA in project(sq ft _ !' 87120 sf 87120 sf �_ New BUA on subdivided lots(subject to permitting) 9 (sq ft) -1[I _-. NIA — `�M NIA _M_ -, New BUA not on subdivided lots(subject to ".l— �^ 10 permitting)(sf) _N/A I _ N/A__ 11 Offsite BUA(sq ft) -�.. _ 0 sf_ ,L!_ 0 sf -_ 12 Breakdown of new BUA not on subdivided lots: _ ___ _ _ 1 -Parking(sq ft) ! 11- 40796 sf11__ �- 40796 sf -Sidewalk(sq ft) -- _—_ ii 2804sf_ _` 2804 sf ___1 -Roof(sq ft) L - it-_21658 sf 21658 sf __j -Roadway(sq ft) I _ _ _ 7�_0 sf`.-L __ 0 sf I. -Future(sq ft) �— I _5796 sf I 5796 sf 1 • -Other,please specify in the comment box ��� -r I below(sq ft) I 11 16066 sf f 16066 sf __ New infiltrating permeable pavement on i if 1 13 subdivided lots(sq ft) i- N__/A N/A New infiltrating permeable pavement not on �I, _ (`���� 1 14 subdivided lots(sq ft) L_�.--_ -if_ N/A _I! _ _ N/A ___{ Existing BUA that will remain(not subject to i` r f, 15 permitting)(sq ft) _ ! 0 sf I. _ 0 sf 16 Existing BUA that is already permitted(sq ft) ,_ _ — - 0 sf _ . 0 sf �I 17 Existing BUA that will be removed(sq ft) 1 __— ! 18105 �sf 18105 sf. 18 Percent BUA __ S 19 Design storm(inches) 3.87(1 Yr) L3.87(1 Yr1_. i 20 Design volume of SCM(cu ft) ! _ I 25287 cf1,Rgd)"J 25287 cF(Rqd)* 1 21 Calculation method for design volume 1.-�_ -� I Simple ; Simple __ DDITIONAL INFORMATION Please use this space to provide any additional information about the 22 _draina a areas: Other BUA=Artificial Turf r 25,294 cf Provided 4 - .�•:,��.�.� _ w -sue--i 8 ......,.::in ,71, ...----..,. G4` I) 2oz/ .: WET POND - _�. .� 1 Drainage area number 1 ___1� 2 Minimume r aired trea vo tment lume cu ft �,,252877 cf ms_ � � �_ _. - (dENE AL MDC FROM 02H.1050- _ 3 Is the SCM sized to treat the SW from all surfaces at build-out? E Yes 4 Is the SCM located away from contaminated soils? II_ Yes 5 What are the side slopes of the SCM(H:V)? 1 2 1,3:1&6:1_ • _ 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? Are the inlets,outlets,and receiving stream protected from erosion i 7 (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the — Yes design volume? 9 What is the method for dewatering the SCM for maintenance? t Pum referred 10 If applicable,will the SCM be cleaned out after construction? � Yes 11 Does the maintenance access comply with General MDC(8)? I Yes 12 Does the drainage easement comply with General MDC(9)? _ Yes If the SCM is on a single family lot,does(will?)the plat comply with N/A 13 General MDC(10)? , _ 14 Is there an O&M Agreement that complies with General MDC(11)? 11� Yes 15 Is there an O&M Plan that complies with General MDC(12)? I �Yes 16 Does the SCM follow the device specific MDC? _ Yes s 17 Writhe SCM designed b�l an NC licenseed_professional? —�— Yeses M Vic.-�. ,�.e��=7 WET POND MDC FROM I 2H.1053 .� _-_ maa.i..---moo - -- •yam.1:41.. ,.-:�.T aii: 18 Sizing method used SA/DA ' 19 Has a stage/storage table been provided in the calculations? ._._ Yes Elevation of the excavated main p ( 20 pool depth bottom of sediment 22.00 I removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) {I 22.50 22 Elevation of the bottom of the vegetated shelf(fmsl) ! 28.00 23 Elevation of the permanent pool(fmsl) T. 29.00 _ 24 Elevation of the top of the vegetated shelf(fmsl) 29.00_ _ 25 Elevation of the temporary pool(fmsl) 31.25 26 Surface area of the main permanent pool(square feet) --_- 7687 27 Volume of the main permanent pool(cubic feet) 28621 cf _ 28 Average depth of the main pool(feet) 3.60 ft 29 Average depth equation used _ Equation 3 _ 30 If using equation 3,main pool perimeter(feet) _ 323.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 6.0 ft 32 Volume of the forebay(cubic feet) 5515 cf _ 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inchej _ 12 in 35 Design volume of SCM(cu ft) 25294 cf _ 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 2.5 in 38 If weir,weir height(inches) _ N/A 39 If weir,weir length(inches) _ N/A 40 Drawdown time for the temporary pool(days) 2.06 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? � __ No _ 43 Depth of forebay at entrance(inches) " 84 in 44 Depth of forebay at exit(inches) 72 in 45 Does water flow out of the forebay in a non-erosive manner? Yes_ • 46 Width of the vegetated shelf(feet) I 6 ft _ 47 Slope of vegetated shelf(H:V) 6.1_ 48 Does the orifice drawdown from below the top surface of the �. Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- ' Yes - yr,24-hr storm? '0, 50 Are fountains proposed?(If Y,please provide documentation that No � ""' "t,9• 1 MDC(9)is met.) _-.---�_-_--� iJkL 51 Is a trash rack or other device provided to protect the outlet system? i Yes V 1 2021 52 Are the dam and embankment planted in non-clumping turf grass? I Yes 53 Species of turf that will be used on the dam and embankment k Bermuda Grass. 54 Hasa latinq. Ian been ro edvid for the vegetated shelf? Yes ADDITIONAL INFORMATION IPlease use this space to provide any additional information about the 55Jwet pond(s): - --_ - — - — --•. wet Pond 1 9:51 AM 11/30/2021 LEVEL SPREADER - FILTER STRIP (LS-FS) 1 Drainage area number _ 1_ ..� Desi9n flow rate of SCM(cfs) - -.__s ,_ ___ _ 14 cfs -.— GENERAL MDC FROM 02H.1050 _ 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? ___ Yes __ 5 What are the side slopes of the SCM(H:V)? NIA _ 6 Does the SCM have retaining walls,gabion walls or other engineered N/A�__ side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion I Yes ~ (10-year storm)? 1._________. 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? 1 Pump_rareferredi 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes __ 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 Yes General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? 1 ^w Yes�__1 15 Is there an O&M Plan that complies with General MDC(12)? _ _Yes _ 16 Does the SCM follow the device specific MDC? , Yes _1 17 Was the SCM desi ned b an NC licensed rofessional? Yes 1 LS-FS MDC FROM 02H.1059 crr�vsaIM-,��o.. a.x-i------ ..-...:.0 >.._,. _...._._ .._"'_.___.__.i._..li 1 .c=:.s._.rrS- 18 Length of level spreader(feet) 10 ft Does the LS-FS receive flow from the drainage area or another 19 SCM? il __' Yes ._ 20 Flow rate to LS-FS during design storm(cfs) I 0.14 cfs 21 Is a bypass device provided? I Yes _ 22 If yes,what is the bypass device? Ssarate.0utlet 0 23 Is this LS-FS designed to receive flow from the drainage area during Yes the 10-year storm? _ _ .� 24 Has a blind swale been provided? Yes 25 Does the blind swale provide for uniform overtopping of the level Yes spreader? —I 26 What material will be used for the level spreader? Concrete __l 27 Will the construction tolerance be<0.25 inch along the level Y s spreader length? 28 Will the level spreader be straight or convex in plan view? 29 Height of the drop from the level spreader to the transition zone in (inches) I 30 Width of the transition zone(inches) 24 in__ 31 Protection for the transition zone TOther I: 1 ,SA,1 e..j 32 Width of the filter strip(feet) 10 ft 33 Is the filter strip free of draws and channels? __ _Yes_ 35 Has this been verified in the field? No___ � W‘\` (�I,� r� ( ('`,/� 35 Slope of the filter strip(%) 1% vY 36 Is this slope uniform across the entire filter strip? Yes �..tl{� G-61. 37 Will the first 12"of soil be adjusted if needed to promote plant Yes growth? __ � 38 Will the filter strip and side slopes be planted with non-clumping, Yes deep-rooted sod? _____ 39 Species of sod that will be used !Bermuda Grass 40 Will soil be temporarily stabilized until permanent vegetation is ___ Yes _ established? A_DDITIONAL INFORMATION 41 Please use this space to provide any additional information about the level spreader-filter strip(s): 1 DEC 01 2021 ii) i BY. LS-FS 1 9:56 AM 11/30/2021