HomeMy WebLinkAboutSW1240601_Supplement-EZ Form_20241029 SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name Emerald Villas
2 Project Area(ac) ! 4.99
3 Coastal We#and Area(ac) 0
4 Surface Water Area(ac) 0
5 Is this project High or Low pensi . High
6 Does this project use an off-site SCM7 No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks pmvided(feet) 30
8 Will the vegetated setback remain vegetated? N/A
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A T
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell _
13 Wet Pond 1
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter
17 Rainwater Harvesting RWH)
18 Green Roof
19 Level Spreader-Filter Stri LS-FS
20 Disconnected Impervious Surface(DIS
21 Treatment Swale
22 D. Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: Wesley Barnes,PE _
28 Organization: Bateman Civil Survey Company
29 Street address: 2524 Reliance Avenue
30 City,State,Zip: Apex,NC 27539
31 Phone number(s): _ _ 919-577-1_080 _
32 JEmair engineering@batemancivilsurvey.com
Certification Statement
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,We,accurate,and complete;and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here
�CSi gRCr Ali 11 t t l l 11111���
essl
05611 Signature of 641grier
NE�a�C)
/
Seal Date
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so,number of drainage areas/SCMs 1
3 Does this project have low density areas? No
4 If so,number of low density drainage areas 0
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 1
4 Type of SCM Wet Pond
5 Total drainage area(sq ft) 217364 115766
6 Onsite drainage area(sq ft) 217364 115766
7 Offsite drainage area(sq ft) 0 0
8 Total BUA in project(sq ft) 86919 sf 86919 sf
New BUA on subdivided lots(subject to
9 permitting)(sq ft) sf sf
New BUA not on subdivided lots(subject to
10 permitting)(so 86919 sf 86919 sf
11 Offsite BUA(sq ft) sf sf
12 Breakdown of new BUA not on subdivided lots:
Parking(sq ft) 36509 sf 36509 sf
Sidewalk(sq ft) 8815 sf 8815 sf
Roof(sq ft) 41595 sf 41595 sf
Roadway(sq ft)
Future(sq ft)
parking and road
Other,please specify in the comment box are combined to
below(sq ft) one
New infiltrating permeable pavement on
13 subdivided lots(sq ft) sf
New infiltrating permeable pavement not on
14 subdivided lots(sq ft) sf
Existing BUA that will remain(not subject to
15 permitting)(sq ft) sf n/a
16 Existing BUA that is already permitted(sq ft) sf n/a
17 Existing BUA that will be removed(sq ft) sf n/a
18 Percent BUA 37% 75%
19 Design storm(inches) 5.6 in
20 Design volume of SCM(cu ft) 8685 cf
21 Calculation method for design volume SA/DA
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
WET POND
1 Drainage area number 1
2 Minimum required treatment volume cu ft 8072 cf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes
4 Is the SCM located away from contaminated soils? Yes
5 What are the side slopes of the SCM(H:V)? 2:1
6 Does the SCM have retaining walls,gabion walls or other engineered Yes
side slopes?
7 Are the inlets,outlets,and receiving stream protected from erosion Yes
10- ear storm)?
8 Is there an overflow or bypass for inflow volume in excess of the Yes
design volume?
9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice
10 If applicable,will the SCM be cleaned out after construction? Yes
11 Does the maintenance access comply with General MDC(8)? Yes
12 Does the drainage easement comply with General MDC(9)? Yes
If the SCM is on a single family lot,does(will?)the plat comply with
13 N/A
General MDC(10)?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes
16 Does the SCM follow the device specific MDC? Yes
17 Was the SCM desi ned bv an NC licensedprofessional? Yes
WET POND MDC FROM 02H.1053
18 Sizing method used SA/DA
19 Has a stage/storage table been provided in the calculations? Yes
20 Elevation of the excavated main pool depth(bottom of sediment 1031.50
removal)(fmsl
21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 1032.00
22 Elevation of the bottom of the vegetated shelf(fmsl) 1035.00
23 Elevation of the permanent pool(fmsl) 1036.00
24 Elevation of the top of the vegetated shelf(fmsl) 1036.00
25 Elevation of the temporary pool(fmsl) 1041.00
26 Surface area of the main permanent pool(square feet) 6251
27 Volume of the main permanent pool(cubic feet) 11280 cf
28 Average depth of the main pool(feet) 3.00 ft
29 Average depth equation used Equation 3
301 If using equation 3,main pool perimeter(feet) 332.0 ft
31 If using equation 3,width of submerged veg.shelf(feet) 6.0 ft
32 Volume of the forebay(cubic feet) 1990 cf
33 Is this 15-20%of the volume in the main pool? Yes
34 Clean-out depth for forebay(inches) 6 in
35 Design volume of SCM(cu ft) 34770 cf
36 Is the outlet an orifice or a weir? Orifice
371 If orifice,orifice diameter(inches) 1.25
38 If weir,weir height(inches)
39 If weir,weir length(inches)
40 Drawdown time for the temporary pool(days) 3.4
41 Are the inlet(s)and outlet located in a manner that avoids short- Yes
circuiting?
42 Are berms or baffles provided to improve the flow path? No
43 Depth of forebay at entrance(inches) 36 in
44 Depth of forebay at exit(inches) 36 in
45 Does water flow out of the forebay in a non-erosive manner? Yes
46 Width of the vegetated shelf(feet) 6 ft
47 Slope of vegetated shelf(H:V) 6:1
48 Does the orifice drawdown from below the top surface of the No
permanent pool?
49 Does the pond minimize impacts to the receiving channel from the 1- Yes
yr,24-hr storm? _
50 Are fountains proposed?(If Y,please provide documentation that No
MDC(9)is met.)
51 Is a trash rack or other device provided to protect the outlet system? Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes
53 Species of turf that will be used on the dam and embankment
54 Hasa lanting Ian been rovided for the vegetated shelf? Yes
R
Please use this space to provide any additional information about the
55 wet pond(s):
2