Loading...
HomeMy WebLinkAboutSW1240601_Supplement-EZ Form_20241029 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Emerald Villas 2 Project Area(ac) ! 4.99 3 Coastal We#and Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low pensi . High 6 Does this project use an off-site SCM7 No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks pmvided(feet) 30 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A T 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell _ 13 Wet Pond 1 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH) 18 Green Roof 19 Level Spreader-Filter Stri LS-FS 20 Disconnected Impervious Surface(DIS 21 Treatment Swale 22 D. Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Wesley Barnes,PE _ 28 Organization: Bateman Civil Survey Company 29 Street address: 2524 Reliance Avenue 30 City,State,Zip: Apex,NC 27539 31 Phone number(s): _ _ 919-577-1_080 _ 32 JEmair engineering@batemancivilsurvey.com Certification Statement I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,We,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here �CSi gRCr Ali 11 t t l l 11111��� essl 05611 Signature of 641grier NE�a�C) / Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond 5 Total drainage area(sq ft) 217364 115766 6 Onsite drainage area(sq ft) 217364 115766 7 Offsite drainage area(sq ft) 0 0 8 Total BUA in project(sq ft) 86919 sf 86919 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) sf sf New BUA not on subdivided lots(subject to 10 permitting)(so 86919 sf 86919 sf 11 Offsite BUA(sq ft) sf sf 12 Breakdown of new BUA not on subdivided lots: Parking(sq ft) 36509 sf 36509 sf Sidewalk(sq ft) 8815 sf 8815 sf Roof(sq ft) 41595 sf 41595 sf Roadway(sq ft) Future(sq ft) parking and road Other,please specify in the comment box are combined to below(sq ft) one New infiltrating permeable pavement on 13 subdivided lots(sq ft) sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) sf n/a 16 Existing BUA that is already permitted(sq ft) sf n/a 17 Existing BUA that will be removed(sq ft) sf n/a 18 Percent BUA 37% 75% 19 Design storm(inches) 5.6 in 20 Design volume of SCM(cu ft) 8685 cf 21 Calculation method for design volume SA/DA ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1 Drainage area number 1 2 Minimum required treatment volume cu ft 8072 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 2:1 6 Does the SCM have retaining walls,gabion walls or other engineered Yes side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes 10- ear storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned bv an NC licensedprofessional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment 1031.50 removal)(fmsl 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 1032.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 1035.00 23 Elevation of the permanent pool(fmsl) 1036.00 24 Elevation of the top of the vegetated shelf(fmsl) 1036.00 25 Elevation of the temporary pool(fmsl) 1041.00 26 Surface area of the main permanent pool(square feet) 6251 27 Volume of the main permanent pool(cubic feet) 11280 cf 28 Average depth of the main pool(feet) 3.00 ft 29 Average depth equation used Equation 3 301 If using equation 3,main pool perimeter(feet) 332.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 6.0 ft 32 Volume of the forebay(cubic feet) 1990 cf 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 6 in 35 Design volume of SCM(cu ft) 34770 cf 36 Is the outlet an orifice or a weir? Orifice 371 If orifice,orifice diameter(inches) 1.25 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 3.4 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance(inches) 36 in 44 Depth of forebay at exit(inches) 36 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 48 Does the orifice drawdown from below the top surface of the No permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr,24-hr storm? _ 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment 54 Hasa lanting Ian been rovided for the vegetated shelf? Yes R Please use this space to provide any additional information about the 55 wet pond(s): 2