Loading...
HomeMy WebLinkAboutGW1--06269_Well Construction - GW1_20241022 WM./L CAl11Vb'1'.1KUCl'1ONRECORD (GW-1) For Internal Use Only: ; ' 1.Well Contractor Information: I o V I Pcc 1�° iri`4,•VA'I'ER':ZONE$ i ;g r5 a I Well Contractor Name FROM TO "' s;__"�' `.'`...; ° C� ( DESCRIPTION ry � "� 1 ft. flu: j j (:),, 1 ft. ` it d I 1 NC Well Contractor Certificationcumber ' 5'401/TISR CASING(CnWiiii"lti cased ifellgO 1 INETE(if-11E"able} ::. �°6rtt \I a FROST TO `z'() , V)ell Cp. DL4 R THICKNESS MATERIAL Company Name f ft. ft. in, ( � 1 pile., ,_ p``� k:1.6:N NER D;ASING:MTCIBIA ETER-ermal'.clas THICKNESS r,. ., Qr,3 a C ',:�;:..2.Well Construction Permit#: 1Y1� ! +' FROM TO DIAMETER TKNESS MATERIAL, List all applicable well construction permits(i.e.UIC,County,State, Variance,etc.) ft. ft. I j in. 3.Well Use(check well use): ft. ft. in. 'Water Supply Well: .i7 SSCREEI-:::,fig . -i— , :iMr r_.y:_.:. K r , x FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑ unicipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) residential Water Supply(single) ft. ft. In. ❑lndustrial/Commercial ❑Residential Water Supply(shared) 1$.GROU1 :-,. �,e, ?z, stk Z.'y;.r ,,,:s_"r m ,.:nt i %.,, :t;t.t ❑Irrigation i ❑Wells>100,000 GPD FROM TO MATE E,iVIPLACEMENT SIETHOD&AMOUNT; Non-Water Supply Well: 0 h, l o ft h Aito❑Monitoring ❑Recove dirt/ 4 n ft. ft. ci Injection Well: ❑A uifer Recharge ft. ft. I, q ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier u19-4-8AVD/GItA• Eti,1"AC16':(if apiiil sabre) ;,,;�s x i A *�t ryEMq ME. i_...7,- C�..,et FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer ;3'OriD1 LZiNG;LOt (attaebaddittonnlsheefafif"nines"sd'y)z 'fir;` _ ..;x z<. ' ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION(color hardness,soil/rock type grain size,etc.) 01 n' IP ft • -gyp ��t 4.Date Well(s)Completed: +1 I a Wel1ID# g ft• • OO ft. rah(k1 �-to C 5a.`Well Location: r ft. ft, - { vaet. M4 irs l to h ft. ft. t__. ' - Facility/Owner Name FacilityID# if a - "-�_ - et v �1 reek v e vvJl4'►(I 1- 15�� fc. fr. 0(T .r, d 2024 Physical dress,City,and Zip ft. ft. 11 `.;; ,.� .2MEN ARKS"-g x......` = t`L i:'....,t. et t?: -�+''�V:, ,.nvtV..t t ..r` County - Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one 1at/long is sufficient) 22.Certification:ti N W /a'ca' ( t4tii d�y 4 6.Is(are)the well(s): tiPermanent or ❑Temporary Sign cure of Certified Well Contractor Date By signing this form,1 hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or iiisio 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner, repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well construction info 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: r� (ft.) I For multiple wells list all depths ifdifferent(example-3®200'and 2@100� Submit this GW-1 within 30 days of well completion per the following: 10.Static water level below top of casing: (ft.) 24a. For All Wells: Original form to"Division of Water Resources (DWR), If water level is above casing,use'+' Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 // 24b.For Injection Wells: Co to DWR,Underground Injection Control 11.Borehole diameter: {p (in.) gr j (IUC) �r Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: a1 r f 1-a ry (i.e.auger,rotary,cable,direct push etc.) 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test: b row Permit Program,1611 MSC,Raleigh,NC 27699-1611 13b.Disinfection type: 1 I1-k Amount: 1 I 2 1.6 Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources ' Revised 6-6-2018