Loading...
HomeMy WebLinkAboutNCC243232_Site Plan or Location Map_20241030 DATE: PAGE . C,... ...."--'''''' ----------'' ''''' Z z..---------- ---- --____ _______ smlTN Ro sec 2n/men \ / �\ \i �\ \ / 26 1La:�•�1:;1::;.:34.714.4.35:134.4i;:-,, l SITE _ _� �- l J / \ / / `O�XO�O /,.- / s0M/n.wr /T( ®gµoHlLL Rog \ / \ii / / QJ a ronlorHo'ue ,, R223a 1 4 �� \ / / . a1515 5 \ \ / / ter_-3i'>Y~v '>r a _� - Smith Road SR 2237 - - - - - - - Construction: Maintenance: \- 1.Clear[he enhance and exit area of all vegetation,roots,and other objectonable 1.Per re net inspect at least once a week and after each 1 inch or - materal and properly grade it. greater rainfall:make any required repairs event ately. \ �\� �/� 2.Place the gravel to the specific gratle and dimensions shown on the plans,and 2.Maintain leaving gravel pad in a condition to prevent mud or sediment VICINITY MAP - _ _ = _ _ _ _ smoothtopdrefrom aving the construction stonesi e.This may require periodic 3.Provide drainage to carry water toasediment trap or other suitable outlet toptlressing with 2incM1 atone. N T.S. \ 4.Use geotextile fabrics In order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or N. / \ ROADSIDE JJJ Subject to seepage or high water table. tracked onto public roadways. \ \ /,, DITCH \'p _ CONSTRUCTION ENTRANCE/EXIT 36 \ 1 \ 11 '�1 / DATE: was Fence Finer Fabric PAGE: CONSTRUCTION SCHEDULE \ \ \ 3 4 1 ty I obtain all necessary pemrns a 1 I e a s a rat cootrogF.Wsc)peon and a Certificate of coverage \ • / 5 /) \ 7 7 steal a Max.ms strength teen a ten f Max.Standard Strength fabric with wire fen. ° C yyy � (COC)most be obtained before landy d' M g A copy of the.SC permit,permit COC and a ha.copy of the v// play moat be kept on site,preferably' perm b d accessible during inapeetion ��, Wire Fence Y/r v and Compact /- ) 2 aoAS gravel nnd lwanol on entrances rpm l£ reinforced'I ante 1 Steel Post 3 Finish clearing and grubbing an necessary n the lots.they are started. • • `O ~ 18.24. __ . 4.Begin lot g dig d f .' 1} Upaope Begin5. or with house \ / PWee ct or es -�s.Finish all rough grading a n u a'amrbea for T oars nerds m have temporary or Pem�eM I / new nee. / 11 \ / / wP - 7.I Install ya walks ape �� Z B Begin fine grading ofl W k/ 9 Final Bra mulching d mb'1 f lot.I h'will involve the installation of sod on the lot.The sat fence will I / /W w ay ^ A 1 sting o-enen / remain in pl until the 1 added grassing'stabilized d takes hold. rued ICI lOTT hat hall d If' p of Me d d'enmuon control measures and complete the following / 1 1 %/// I combined self'sspection form fowdon me DEmLR websik / I -/ W{¢tl Filter Fabric /// h[tps'//www.degnegov/ebouVdivisions/energy-mineral-end-land-resourceslsrormweter/slormwater-prograMnpdes-consW<tion-program. } standard strength or extra Strength synthetic filter febrka CROSS 5ECl10N VIEW Twelve months ofomplete inspection forms shall be kept on site and available for inspection at all times.It is recommended J FF_ F above nte ground(Higher fences copy be kept in a permits box.Ref G.S.113A-S4.l through G5.I13A-S7 Sections ISA NCAC 04A.0101 Wougb ISA \.' FW. JJ Z I �Esy6mapountl va'uam owater alumtheM ie w„a Mlure`of Ne atruchenl NCAC 04E.0504 GenmlPermil NCG 010000 NPDFS for Com on Actin a 1/o h hl- W P? 3.Con ro 11.Self-inspections for ins and asthma tic trot measure are mbe perfotimed et less everyse calendar 000 and If J� 8 ce arglfn Imi mM1 Dent at n um me within 24 hours of every min event ofgreaten Man linch.Any needed repairs shall he made immediately to maintain measures as Uc �(.I- Sup.sttandard strength fillerfabrlci by wire mashsknenedd`s`seurelY.the.slopeosiie M the posts.Extend Mehmenence: Z dear ed.All ESC hall be maintained as tined in the consmachon details on this IanA c shall be installed _ _----_ �� ups ope g sPe P gauge 27 Q W the wire suppanmthe bottom afthetrench.Fasten the wire reinforcement,hen ral.ic on the Mena 1.Inspect sediment fences at least woe a week and after each I at the project site for o0_ng. min au ---- - ----- I 12 W U g 8 \ airs immediately. Whena wire me Defence sh support ren.Wire or�ufivasd.apece tim ould have a minimum 50 poalsame roue vntleet apartound "sile Support should cedrlven 12.Inspection and final acceptance letters.When the project is complete,the permittees shall contact DEMLR m close out the MSC 23 ( m r g Wn. mum . in.or greater rainfail.Make any or become ineffective,replace It required ,rear,d ce y. Plan.After DEMLR informs the permutes°f the project close out,via inspection report,the permittu shall visit ) W N I securely fiHerhbdc wiNeroot poet spat rag tloea not requireawire mesM1 aupporthnce.Securely Remove>ed.,deposits.Meq.nogov/NCGOF to submit an electronic Notice of termination(e-NOT).A$120 annual general permit fee will be charged 24 5 JN W rYebnctli y p s.W, p u p sshouM M1avea minimum of p° tllens,b necessaryreducepad adeqsure on uate sMn untll the a-NOT has been tilled out 25 I I . fence.Take car.avokl unde.ining the fence during _ I \ Excavate the trench approximately and 8nch. p g proposed ne of p and 4 memo..rent rag malenesand unalabe»0 ment deposlb/ I I o E8. pMaP'2fiomMeb`ni r.bra the bottom and side Mr die trench. eon the 50 u ^ tle g „ .g.Do attach filter .to M.°.es.fiHerlabac antl compact.Thorough i tErrebgreeeeNslednze It attermen contributing g pacHw(Atha is red hash prepay bl etl r to.D^not eaach filmrkbrkmaeuafing treed. MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION j 26I / I ..ANC-Envir nmentel.jpeg Gravel construction Entrance-The gavel pad should remain in a condition to prevent mud or sediment from leaving the concoction site. /� / I I 7 I ( SILT FENCE This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used ro trap sediment and clean it out ere necessary. / / Immediately remove all objectionable materials spilled,washed,or tracked Dram public roadways. Z SIR Fence-sediment reuses should be inspected at east once a week ana after each rainfall event Any repairs should be made immediately. „e✓\ 10'SRE C UTILITY IASEMENT/ III 2 DATE: PAGE: Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that buildup against the fence should be removed and disposed -� CONSTRUCTION W $,It Sock/Wattle Silt Sock/Wattle i of merlin re that the removed sediment does not wash backaainst the fence.Ade mate stone volume should be rovided for behind the fence 'UTILIT p p e lake g q g p Y�EASEMENT / / LIMITS •at tell times.Take Dare to not undermine the f0e during oleanopt operaz ens. 1 / / I(7 MI 0.0 �IWs providing eguirele.protection SotldWg The sod should be properly mmnminedto rosins that theg yak holds in the areas being secured The sod should be watered as necessary J ¢J '/ W �Iln. n- 11,II use in silt socks cf watt. ...UM for to maintain adequate store m the mot zone and dormancy f M1 d.The sod should not be mowed to close,since this could inhibit adequate ,1�Iandevi11a'Way ' ;I ) '"�°�I ea m°�1 Stakes 1N growth d stabilization of the root bad.The sod should be limed and fmiMed as per soil type recommendations and type of grass recommendations when installederedlem and ifpoasible / / I Q• eofeco Qy SECTION SECTION meld located below Grassing and Matching-The area to receive gassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparafion. \ 10'UTILITY EASEMENT _ _ ? ono-�aHti>"KKere'a etn>edge of land Once the gassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be repaired, I SREMC UTILITY kMenlNi disturbance. ua ends w of zNn and reseeded as soonos possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be wean,the �- EASEMENT�- SO / RD d Waaa�m growing season permits the use of a permanent grass. \ gMa"' B,M,or- slit aemdfiolm eo ga tan sera e Diversion Berms-Divmion berms shall be inspected weekly or after ea.runoff producing rainfall...sure that they are operating as designed and that there \ // / Lot Plan N have been no breaches in the berm.Bemis shall no exceed 18"in height and shall be placed in locations that will no interfere with home irvction activities. cell Once the house construction is completed and the lot is ready to receive sod,then the bum shall be removed and me material incorporated into the graded lot area It Dlr p_ll�j ll be paced eta' and covered immediate) 'li d.An proper shall be k to insure that the berms are installed according to the applicable detail with the berm material / Ol I TraaMwal Maximum interval of 4 feet or a runn a e n compacted sufficiently m m her - placeaping me course af the wmtmcumn activities. l/'$ / o coo Mulch or old tie General All will be inspected and - d as runoff producing min..,or at least , k minimum.The builder will insure that the `� / �� / 20 // / M� uNmErvcHEo INSTALLATION ory t of`g s sockMattles are used on ENTRENCHED INSTALLATION. concrete blocks shall be used behind sockWattle to 5. In Me event.king is not mssiblo lie.when any padicular lot d not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be relocated / I W� eiwuwunoxw aeuamm.mw.•ev<"ew.ue^M.'2' on the lot retthat the potential for sedimentation "off is eliminated as much as possible.Silt fences and gravel co ion entrances will be maintained ss suggested ^'h / // I q.Z ISOMETRIC VIEW old rain plane ^g on events. m the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover'"rc core xmu Dow RATES t es. Ins.silt sockMeNa at le.wmkly end aher each 1 oft or greater rainfall.Remove Mulch or tl l / / / a // I 2 KKUtrrehada m ` d m<ontotols a Ira)".a s�,"ni t+sm m,Av.:, a^.3,0 2' amemumt needed to allow pacedIICloggadar The GROUND STABILIZATION I „L z / "0/ ShmtFxw� '� co° ,I °'° a Silt Sock/"t msrpro. (rs3rmj WV) SITE AREA STABILIZATION .m,�._. � / / // Wark Am, ! Pat° " �aete t>^ l c$�e1"1 a ) fi =Dee 1 aat<na. a'b:aedn1017f'tn1o°�°°e"arendspaand EXCEPTIONS tvp 0" is>r` (/ non i1aa 'Miff' aaasP re and rem. DESCRIPTION TIME FRAME / /mime ..,,,,,,,,it) i) limim) /mkml imim) abee^Perm�naMratab aed. PERIMETER DIKES, 7 DAYS NONE w / / -( SWALES, DITCHES " tl / 9 _ ��� SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION HIGH QUALITY 7 DAYS NONE TIJII- i / / / \1'e/ � � <�ya� A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY WATER ZONES - .,<.re,�..Aam. \\-\�rG\J` 'vV NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR II / ',8 �� COMPLETED AS AN EXCEL SPREADSHEET. (HOW) ➢ .u..�.e.�.. r. v G.Cl AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED SLOPES STEEPER 7 DAYS IF SLOPES ARE lll II • .m�.... ."..era " / /� ca fi17, EROSION AND THAN 3:1 10=OR LESS IN ill °^"" ✓ / 10 10O �k v' / SEDIMENTATON CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A LENGTH AND ARE �_"�.._".o_... �w=no.,n..... „ao / ( NCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY NOT STEEPER / / .. �G�'C/ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE "..era...",.,.,e2 AA 1v **,\'\ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, THAN 2:1, 14 / / / ,a,ar�err / ( 13 DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, DAYS ARE _"'"°""� ** I// /ly' S I - PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION ALLOWED -_.o..m -\ i. ,\\\.\ ` a a - CONTROL PLAN."MO SLOPES 3:1 OR 14 DAYS 7 DAYS FOR I\ : \�/' FLATTER SLOPES GREATER \�GJ'( THAN 50'IN _�• .�b R�ll� I /� �tF./ 1 y1 / LENGTH 11-11:i 1 ,,III I \ _„.---1 Y ALL OTHER AREAS 14 DAYS NONE(EXCEPT 1111111111I11i1 ,,' :I. WITH SLOPES FOR PERIMETERS .a•. d _I / FLATTER THAN 4:1 AND HOW ZONES) cam,=m"".... CONSTRUCTION "„nips•"b ".��. �-..rum LIMITS SODDING 15 PAGE 1 of 2 CONSTRUCTION / / 15111511111111 LIMITS / LOT EROSION CONTROL PLAN TOTAL DISTURBED ACREAGE: 2.46 ACRES IMIIHISEE wpa.mnTamnlNnREmEat- • �� - - / N a nn�nny E / MORNING GLORY, PHASE TWO ,Ene4 ewe°- reaonemrERMUaTa CONSTRUCTION LOTS 10 13, 16 & 17 Pursuant to G.S.113A(3),provisions for permanent ground cover LIMITS -L_3.2 __ - - r sufficient to restrain erosion must be accomplished for all ^o i \ FOR disturbed areas within 14 working days or 90 calendar days _ (whichever is shorter)following completion of construction. 111. . K I M A S H HOMES, L L C. t • OBI \ GRAYS CREEK TOWNSHIP CUMBERLAND COUNTY nnttoorrx r,, ZSMOnAnEmRZI. nmCW"ENT"Eaena mEeEFI""`Dino ��pwAER Etr reMamE°-'mr.a General Erosion Control Notes NORTH CAROLINA SCALE: 1"= 60' AUGUST 2024 w.mE»it �mEentiia SET THE mnWm • I I7oan 2.Polssisturbedaareasshallbe9rPesma disturbed. nenmulchedassoonas / / / \ GRAPHIC SCALE PPE RANCE OF GOOD SOD Y the it it 2 1 BO 0 30 80 120 240 'j I II tits and maintained until t cover is established. II%I�U IIil VII II I i huV li nor,a / I \ ENGINEERS • ( IN FEET) �e.. / \ 1 inch= 60 ft. .-� f omsaaomnT / / / SURVEYORS , MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C. MOORMAN,KIZER&REITZEL,INC. PHONE (910) 484-5191 FAX (910) 484-0388 License#: F-0106