Loading...
HomeMy WebLinkAboutSW6240102_Emails_20241029 Beeker, Jacob I From: Beeker, Jacob I Sent: Tuesday, October 29, 2024 1:08 PM To: permits@rhetson.com;jamal@jandkbuilders.com Cc: Joyner, Melissa; svc_post_construction_stormwater; Blakley, Reuben; Scott Brown Subject: Re: SW6240102; Raeford Vass Road Dollar General (Hoke) Good afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR) received a Post-Construction Stormwater Management Permit Application for the subject project on August 22nd, 2024. 15A NCAC 02H .1042(3)(c)of the North Carolina Administrative Code states that an application is considered approved if the required response times outlined in G.S. 143-215.1 are not met, unless one of the following exceptions applies: i. The applicant agrees, in writing,to a longer review period. ii. A public hearing is required for a final decision. iii. The applicant fails to provide necessary information for the Division's review. iv. The applicant denies the Division access to records or premises for information gathering. As none of these exceptions were relevant to your application,SW6240704 is considered approved on September 21 st, 2024, based on the aforementioned regulation (15A NCAC 02H .1042(3)(c)). We are forwarding Permit No.SW6240102, dated September 21 st, 2024,for the construction, operation and maintenance of the built-upon areas(BUA) and vegetated conveyances or areas associated with the subject project.This permit shall be effective from the date of issuance and shall be subject to the conditions and Limitations as specified therein and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, Rhetson Companies, Inc., at the following address(NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Rhetson Companies, Inc., Purchaser Attn: Brian Clodfelter, President 2075 Juniper Lake Road West End, NC 28376 1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made)after which point,they will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Jacob Beeker at postconstructionCa)deq.nc.gov. Thankyou, i Jacob Beeker(He/Him) Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office:(919) 707-9214 iacob.beeker(-)deq.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Beeker,Jacob I <jacob.beeker@deq.nc.gov> Sent: Friday, September 27, 2024 10:34 AM To: Scott Brown <sbrown@4dsitesolutions.com>; permits@rhetson.com <permits@rhetson.com>; jamal@jandkbuilders.com <jamal@jandkbuilders.com> Cc:Joyner, Melissa <melissaJoyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: Re: SW6240102; Raeford Vass Road Dollar General (Hoke) Good afternoon, The Division of Energy, Mineral and Land Resources received a Post-Construction Stormwater Management Permit Application for the subject project on August 22nd, 2024. 15A NCAC 02H .1042(3)(c)of the North Carolina Administrative Code states that an application is considered approved if the required response times outlined in G.S. 143-215.1 are not met, unless one of the following exceptions applies: i. The applicant agrees, in writing,to a longer review period. ii. A public hearing is required for a final decision. iii. The applicant fails to provide necessary information for the Division's review. iv. The applicant denies the Division access to records or premises for information gathering. As none of these exceptions were relevant to your application,SW6240102 is considered approved on September 21 st, 2024 based on the aforementioned regulation (15A NCAC 02H .1042(3)(c)). Thanks, Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality (919) 707-9214 Jacob.Beeker(abdeq.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 From: Holland, Brianna <brianna.holland@deq.nc.gov> Sent:Wednesday, April 17, 2024 6:23 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Scott Brown <sbrown@4dsitesolutions.com>; permits@rhetson.com <permits@rhetson.com>;jamal@jandkbuilders.com <jamal@jandkbuilders.com> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: RE: SW6240102; Raeford Vass Road Dollar General (Hoke) Good evening, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for SW6240102 on January 18, 2024. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. Electronic copies should be uploaded at the following location: https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload To view the electronic repository, please see the following link: https://edocs.deg.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources Thank you, Brianna Holland Environmental Engineer North Carolina Department of Environmental Quality Office: (919) 707-9218 brianna.holland@deq.nc.gov (email preferred) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address: 512 North Salisbury Street, Raleigh, NC 27604 ,�: D_ E � NORTH CAROLINA 7.4m Q Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Please direct all post-construction permitting questions and correspondences to our new group email address, postconstruction@deq.nc.gov From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Thursday,January 18, 2024 4:07 PM To: Scott Brown <sbrown@4dsitesolutions.com>; permits@rhetson.com;jamal@jandkbuilders.com Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov>; Holland, Brianna <brianna.holland@deq.nc.gov> Subject: SW6240102; Raeford Vass Road Dollar General (Hoke) 3 Good Afternoon, We received your post-construction stormwater permit application for the subject project on 1/18/24. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deg.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW6240102 This project will be reviewed by Brianna Holland, if you have any questions, please contact them at postconstruction@deg.nc.gov or at 919-707-9218. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D_ E NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Scott Brown <sbrown@4dsitesolutions.com> Sent:Wednesday,January 17, 2024 7:49 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; permits@rhetson.com; iamal@iandkbuilders.com 4 Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: [External] RE: Raeford Vass Road Dollar General; Raeford, Hoke County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. I just received the wetland report. You should receive the additional information tomorrow. Scott Brown, PE I Professional Engineer office:910-426-6777 1 ext 102 1 cell:910-489-6731 1 fax:910-426-5777 On time,every time. I www.4Dsitesolutions.com From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Tuesday,January 16, 2024 2:47 PM To: permits@rhetson.com; iamal@iandkbuilders.com;Scott Brown <sbrown@4dsitesolutions.com> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: RE: Raeford Vass Road Dollar General; Raeford, Hoke County Good Morning, Additional information for this project is due, 1/20/24. Where are you in sending these items in? Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin Sent:Thursday, December 21, 2023 10:50 AM To: permits@rhetson.com; iamal@iandkbuilders.com;Scott Brown <sbrown@4dsitesolutions.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Raeford Vass Road Dollar General; Raeford, Hoke County Good Morning, 5 We received your application for a new post-construction stormwater permit on 12/20/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 1/20/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): • Section III, 1c—If the Applicant, Rhetson Companies, Inc., will be purchasing the property, they should be listed as the purchaser in this section and a sales agreement(required per 15A NCAC 02H .1042(2)(c)) should be provided, otherwise, the applicant should be listed as the developer. Please provide a sales agreement. • Section IV, 3—Please list the correct river basin that this project is located in (This project appears to be located within the Cape Fear River Basin). • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: • Wetland delineation or a note on the plans stating that there are no wetlands located on-site.This item is required per 15A NCAC 02H .1042(2)(g)(iii) &Section VI, 8m of the Application. Please also list the name of the individual that made this determination in a note on the plans. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. 6 Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov NORTH CAHOLINA Department of Environmental quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 7