Loading...
HomeMy WebLinkAbout20170239 Ver 1_RE U-3109A JD Permitting question_20160226Wanucha, Dave From: Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Sent: Friday, February 26, 2016 2:09 PM To: Mason, James S Cc: Wanucha, Dave Subject: RE: U-3109A JD/Permitting question Hi Jim. I tried calling but the line was busy. As I indicated yesterday it appears that all of the Merger decisions, along with the FEIS, were based on the entire U-3109 project, not just one section or another; I confirmed that during my file review today. Since purpose and need, alternatives, and LEDPA were all based on the entirety of the project, separating the A section out as single and complete would be problematic. As such, project permitting should be pursued as a phased project, with the A section based on final plans and impact calculations, and the B section based on preliminary plans and impact estimates (not released for construction pending further Avoidance and Minimization/design). Regarding the B section JD, for various reasons I believe that we will have to update/finalize the JD for the B section prior to permitting. But, I'll confirm with Monte next week when he is back in the office. Regarding site 12, I can't find anything in the file about additional streams from Greg. Forward on the info and I'll compare with what I have. Sorry for the delay in responding. Please let me know if you have any questions. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Mason, James S [mailto:jsmason@ncdot.gov] Sent: Monday, February 22, 2016 10:53 AM To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov> Subject: [EXTERNAL] U-3109AJD/Permitting question Dave- I hope that you had a great weekend. I apologize for bombarding you with questions related to this project, but I was going through some of Greg's paperwork and had a few quick questions. Do you know whether this Section of the project was determined to have independent utility? I assume that it does not, but wanted to make sure before I proceeded with the application. If it does not, I am also assuming that we will have to do this as a phased IP and provide preliminary impacts related to the B section. The main question that I have is related to the JD for the B Section. It expired in 2008 and was not re-verified when the A section was in 2012. Is this an issue where we should proceed with getting the B section re-verified? My other question was related to 2 streams at Site 12. Per comments from the 4C meeting, Greg did a field visit to investigate two potential stream features near the pond at Site 12. After the field visit, we determined that one was intermittent and one was perennial. However, I cannot find any record of Greg providing this information to you. I have told Hydro at this time to proceed with assuming that these features are jurisdictional, but wanted to know if Greg had sent you anything about these features and, if not, whether you wanted to visit them to confirm his calls? If you could email me back when you have an opportunity it would be much appreciated. Thanks, �i'i'�1 Jim Mason Environmental Program Consultant Natural Environment Section Project Development & Environmental Analysis North Carolina Department of Transportation 919 707 6136 office 704 604 8358 mobile jsmason@ncdot.gov <mailto:jsmason@ncdot.gov> 1598 Mail Service Center Raleigh, NC 27699 -1598 1020 Birch Ridge Drive Raleigh, NC 27610 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.