HomeMy WebLinkAboutNCG020266 DMR SW (2)STORMWATER DISCHARGE MONITORING REPORT (DMR)
Part D • Storm. Event Characteristics
Total Event Precipitation (inches):
Event Duration (hours):
rarr.u. rentcte Maintenance MonitoringRe uirenients
, i
r.3
r
R
0
.Q115
(
.. (. 1'
Q a 5
ou fall
t
IVo
Roder 14 Sh�eanl
Name
Golleetell
�,
:;::.
,'f
,4tall I
Pto�'! I
itu "
�t �,
t
r ,
a ,!. �
'
:.:
Al
I`
1
moltitllr •
_,,
it !
'(l.
�`G
(
.. ,k
Alt
1
, .nW
.�
o,
n,
o /
Part D • Storm. Event Characteristics
Total Event Precipitation (inches):
Event Duration (hours):
rarr.u. rentcte Maintenance MonitoringRe uirenients
, i
r.3
r
R
Al
I`
I,
{
rNtf
�`G
�n� y�il I>i
i� tr
f�,-s+�.
i
�,� 1.5dStnedc�et�,
,!
� , I � !, 1,
1
, .nW
nif'`.
Total Event Precipitation (incl►es).
Event Duration (hours). D
(if a separate storm event. is sampled) APR 1:P 2015
Part C Certification
DENR -WATER RESOURCES:
'.'I certiify, nilder penalty of law, that tlliS document and all aitaclimetlts wet a re aced UI1deC ttl direct '401 & BUFFER PERMITTING'
P p y ion or supervis on ill, accor ance w tli a
system designed to assure that qualified personnel properly gather and evaluate the infoi nation.submitted. Based on my inquiry
or persons.wlid manage.thesystem,.or. those persons directly res onsible for atherin the
p g g information, the information submitted is the
the best
of my knowledge and: belief, true; accurate, and complete::I am aware that there are significantenalties for submittin
Including the possibility of fines and imprisonment for low ng violati p g false information,