Loading...
HomeMy WebLinkAboutNCG140084 DMR WW & SWSTORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 .d Orig- State 0 Copy - State t0 Copy - Plant 1 0 C F'I CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 4 SAMPLE COLLECTION YEAS opy - l e FACILITY NAME: Chandler Concrete Co. - Randleman Plant #110 SAMPLING PERIOD• ®J I D b ❑ PERSON COLLECTING SAMPLES: Ronnie Faulkner CERTIFIED LABORATORY:Pace Analytical Lab #633 OPTIONAL INFO: Part A: Stormwater Monitoring Reauirements U y- ecem er January -June COUNTY Randlolph PHONE NO. ( 336) 498 - 8209 ADD TO LISTSERVE? ❑YES ®NO EMAIL: _ DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C Outfall No. Date Sample Collected ;i (mo/dd/yr OR r NO FLOW) pH (Standard Units )• TSS m ( g/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring. (y/n) # of Months in Tier 2 2 Sampling - - 6-92 1002'3 1 NO FLOW N N/A 2 NO FLOW N N/A No Discharge Observed during this period RECH DAIR 2E If "NO FLOW" or "NO DISCHARGE. Enter.."NO FLOW" or "NO DISCHARGF" for earh outfall harp Plaa-,a maks curs to mark tha -,amnia narind ahnva Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. _ 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50. mg/I. - 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. �V ® 2016 FILES ;TION Permit Date: 7/1/2011.60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method Total Suspended Event Total 1664A SGT --HEM Solids Duration Rainfalla (mg/L) (mg/L) (minutes) (in) New Motor Oil Usage (gal/month) In InTier# 2 Tier Monthly Monitoring? (y/n) of Months in Tier 2 Sampling2 6-92 152 1002'3 - - - - - N/A *Vehicle Maintenance Not Performed this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE. MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE. CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" resorts) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ CeiitralsFiles? 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel pro rly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsib or gath ing the i formation, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are ' if' nt pe ie or su fitting false information, including the possibility of fi es a d imprisonment for knowing violations." (Signature rmittee) (D e) Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 4 FACILITY NAME: Chandler Concrete Company - Randleman #110 PERSON COLLECTING SAMPLES: Ronnie Faulkner CERTIFIED LABORATORY:Pace Analytical Lab #633 LIMIT VIOLATIONS? YES []NON Part A: Wastewater Monitoring Requirements FIs 0-110— SAMPLE COLLECTION YEAS Orig -State 0 Copy - State 0 Copy - Plant 0 Copy - File SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March [_]April -June COUNTY: Randolph PHONE NO. ( 336) 498 - 8209 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C OPTIONAL INFO: Date Sample Type of Wastewater Total Suspended pH Settleable TPH usingDischarge method 1664A Total Flow Outfall No. Collected � z (VE, RM, MD) Solids (standard) Solids 6 SGT -HEM Duration , (gallons/day) (mm/dd/yr) (mg/L) (mL/L) -(mg/L) . (minutes) - - - 6-93'4 303s 53 (15)6 - - 1 NO FLOW VE RM MD N/A 2 NO FLOW VE RM MD N/A 016 No qualifying discharge this period - PILES, 1 If wastewater systems have not discharged in this quarter — report "No Flow" or `:No Discharge" here. Please make sure to mark the sample quarter above.--- ' -"" Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 I an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. . 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 0213.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case-by-case basis. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thap4re are_3ignificarlt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." re of Z-7 ( te) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2