HomeMy WebLinkAboutNCG140084 DMR WW & SWSTORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000 .d Orig- State
0 Copy - State
t0 Copy - Plant
1 0 C F'I
CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 4 SAMPLE COLLECTION YEAS opy - l e
FACILITY NAME: Chandler Concrete Co. - Randleman Plant #110 SAMPLING PERIOD• ®J I D b ❑
PERSON COLLECTING SAMPLES: Ronnie Faulkner
CERTIFIED LABORATORY:Pace Analytical Lab #633
OPTIONAL INFO:
Part A: Stormwater Monitoring Reauirements
U y- ecem er January -June
COUNTY Randlolph
PHONE NO. ( 336) 498 - 8209
ADD TO LISTSERVE? ❑YES ®NO EMAIL: _
DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C
Outfall No.
Date Sample
Collected ;i
(mo/dd/yr OR r
NO FLOW)
pH
(Standard
Units )•
TSS
m
( g/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
In Tier 2
Monthly
Monitoring.
(y/n)
# of Months in Tier
2
2 Sampling
-
-
6-92
1002'3
1
NO FLOW
N
N/A
2
NO FLOW
N
N/A
No Discharge Observed during this
period
RECH
DAIR 2E
If "NO FLOW" or "NO DISCHARGE. Enter.."NO
FLOW" or "NO DISCHARGF" for earh outfall harp Plaa-,a maks curs to mark tha -,amnia narind ahnva
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. _
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50. mg/I. -
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge.
�V ®
2016
FILES
;TION
Permit Date: 7/1/2011.60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
pH
(Standard
Units)
TPH using method Total Suspended Event Total
1664A SGT --HEM Solids Duration Rainfalla
(mg/L) (mg/L) (minutes) (in)
New Motor Oil
Usage
(gal/month)
In InTier#
2 Tier
Monthly
Monitoring?
(y/n)
of Months
in Tier 2
Sampling2
6-92
152 1002'3 - -
-
-
-
N/A
*Vehicle Maintenance Not Performed this Location
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE. MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑
REGIONAL OFFICE. CONTACT NAME:
Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" resorts) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ CeiitralsFiles?
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel pro rly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsib or gath ing the i formation, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that there are ' if' nt pe ie or su fitting false information, including the possibility of fi es a d imprisonment for knowing violations."
(Signature rmittee) (D e)
Permit Date: 7/l/2011-60/30/2015
Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 4
FACILITY NAME: Chandler Concrete Company - Randleman #110
PERSON COLLECTING SAMPLES: Ronnie Faulkner
CERTIFIED LABORATORY:Pace Analytical Lab #633
LIMIT VIOLATIONS? YES []NON
Part A: Wastewater Monitoring Requirements
FIs 0-110—
SAMPLE COLLECTION YEAS
Orig -State
0 Copy - State
0 Copy - Plant
0 Copy - File
SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March [_]April -June
COUNTY: Randolph
PHONE NO. ( 336) 498 - 8209
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C
OPTIONAL INFO:
Date Sample
Type of Wastewater
Total Suspended
pH
Settleable
TPH usingDischarge
method 1664A
Total Flow
Outfall No. Collected
� z
(VE, RM, MD)
Solids
(standard)
Solids
6
SGT -HEM
Duration ,
(gallons/day)
(mm/dd/yr)
(mg/L)
(mL/L)
-(mg/L) .
(minutes)
- -
-
6-93'4 303s
53
(15)6
- -
1 NO FLOW
VE RM MD
N/A
2 NO FLOW
VE RM MD
N/A
016
No qualifying discharge this period -
PILES,
1 If wastewater systems have not discharged in this quarter — report "No Flow" or `:No Discharge" here. Please make sure to mark the sample quarter above.--- ' -""
Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 I an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring. .
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 0213.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case-by-case basis.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware thap4re are_3ignificarlt penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
re of
Z-7
( te)
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 2 of 2