HomeMy WebLinkAboutNC0020338_Pretreatment_PCI_Report_20240828 Docusign Envelope ID:OE4D9CE5-7366-4lA2-96B3-36919DC8909C
Eta`sTare OF�
ROY COOPER
Governor
ELIZABETH S.BISER
Secretary *�Af Qwv N°�°'*
RICHARD E.ROGERS,JR, NORTH CAROLINA
Director Environmental Quality
8/28/2024
Via Electronic Mail(jswaim(kyadkinville.org)
Mr. Jacob Swaim
Public Works Director
Town of Yadkinville
P.O. Box 816
Yadkinville,NC 27055
Subject: Pretreatment Compliance Inspection
Program: Town of Yadkinville
Wastewater Treatment Plant: Town of Yadkinville WWTP
NPDES#: NC0020338,Yadkin County
Dear Mr. Swaim:
Enclosed is a copy of the Pretreatment Compliance Inspection (PCI) Report for the inspection of the Town of
Yadkinville's industrial pretreatment program on June 14, 2024, by Mr. Keyes McGee of the Division's Central
Office.
Background
The Town of Yadkinville has 4 Significant Industrial Users (SIUs) one of which is a Categorical
Industrial User(CIU),all discharging effluent to the Town of Yadkinville Wastewater Treatment Plant.
Publicly Owned Treatment Works (POTW)Interview
Discussions with Mr. Grant Trivette indicate no POTW issues related to the pretreatment program at
the time of this PCI.
Pretreatment Program Elements Review
The most recent Headworks Analysis (HWA)was submitted to the Division on August 17, 2022, and
is awaiting Division review.
The Industrial Waste Survey(IWS)was approved June 28,2022.
The Sewer Use Ordinance(SUO)was approved on January 3,2012.
The Enforcement Response Plan(ERP)was approved November 19,2019.
The Long Term Monitoring Plan(LTMP)was approved September 14, 2020.
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1611 Mail Service Center I Raleigh,North Carolina 27699-1611
NORTH CAROLINA 919.707.9000
Uapad—t of E,,kon—tal Quay
Docusign Envelope ID:OE4D9CE5-7366-4lA2-96B3-36919DC8909C
STMP File Review Findings
The POTW is sampling as per the approved STMP at the appropriate PQLs.
Industrial User Permit(IUP) File Review
File review for Austin Electrical Enclosures (0006), B&G (0004) and Unifi (0005), all indicate well
organized records and data. The SIUs were not in SNC for the last complete 6-month reporting period.
No Action Items Necessary for the Pretreatment Program
Final Comments
The Town of Yadkinville's industrial pretreatment program is satisfactory. The POTW administrates
an adequate pretreatment program.
Please inform the control authority's Pretreatment Coordinator of our findings by forwarding a copy of this letter
and the enclosed report.
The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact
Mr. McGee at(919) 707-3636, email: keyes.mcgee@deq.nc.gov.
Sincerely,
tkm/yadkinville_pci_2024
Enclosure: 06/14/2024 Inspection Report DocuSigned by: '' "
Ec: Municipal Unit File �l icl�ac( 91iLoI�t,(,ir Uh
Jenny Gramak,WSRO C464531431644FE.
Central Files(Laserfiche) Michael J. Montebello,NPDES Branch Chief
Division of Water Resources
D E Q North Carolina Department of Environmental Quality I Division of Water Resources
vvv512 North Salisbury Street 11611 Mail Service Center I Raleigh,North Carolina 27699-1611
NORTH CAROLINA 919.707.9000
Depenmem of Environmental Duality
Docusign Envelope ID:OE4D9CE5-7366-4lA2-96B3-36919DC8909C
NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
Water-Resources
ENVIRONMENTAL QUALITY
BACKGROUND INFORMATION [Complete Prior To PCI; Review Prol4ram Info Database Sheet(s)l
1. Control Authority(POTW)Name: Town of Yadkinville
2. Control Authority Representative(s): Grant Trivette
3. Title(s): WWTP ORC/Pretreatment Coordinator
4. Last Inspection Date: 04/27/2023 Inspection Type(Check One): ❑ PCI ® Audit
5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ®YES ❑NO
6. Is POTW under an Order That Includes Pretreatment Conditions? ❑YES ®NO
Order Type,Number,Parameters: N/A Are Milestone Dates Being Met? ❑YES ❑NO
ICIS CODING
Main Program Permit Number MM/DD/YY
N I C 1 0 10 1 21 01 31 31 U 1 06 � 14 � 2024J
7. Current Number Of Significant Industrial Users SIUs ? 4
8. Number of SIUs With No IUP,or With an Expired IUP? 0
9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0
10.Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0
11.Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi-Annual 0
Periods?
12.Number of SIUs in SNC For Reporting During Either of the Last 2 Semi-Annual Periods? 0
13.Number of SIUs in SNC with Pretreatment Schedule? 0
14.Number of SIUs on Schedules? 0
15.Current Number Of Categorical Industrial Users CIUs ? 1
16. Number of CIUs in SNC? 0
POTW INTERVIEW
17. Since the Last PCI,has the POTW had any NPDES Limits Violations? ®YES ❑NO
If Yes,What are the Parameters and How are these Problems Being Addressed? 1 for T D D weekly
Avg (continued I&I
efforts0
[Heavy Rain Event]
18. Since the Last PCI,has the POTW had any Problems Related to an Industrial ❑YES ®NO
Discharge(Interference,Pass-Through,Blockage,Citizens' Complaints,Increased
Sludge Production,Etc.)?
If Yes,How are these Problems Being Addressed?
19. Which Industries have been in SNC for Limits or Reporting during SNC for Limits:Austin Electrical Enclosures
either of the Last 2 Semi-Annual Periods?Not Been Published for SNC for Reporting:None
Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Published:None
20. Which Industries are on Compliance Schedules or Orders?For all SIUs on an
Order,Has a Signed Copy of the Order been sent to the Division? None
21. Are Any Permits or Civil Penalties Currently Under Adjudication?If Yes,Which ❑ YES ❑ NO
Ones?
LTMP/STMP FILE REVIEW:
22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ®YES ❑NO
23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ®YES ❑NO
24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ®YES ❑NO Is Table Adequate? —]YES ❑NO
25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify
yourself!
NC DWR Pretreatment Compliance Inspection(PCI)Form Updated July 2024 Page 1
Docusign Envelope ID:OE4D9CE5-7366-4lA2-96B3-36919DC8909C
26. If NO to 23 -26,list violations N/A
27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ]YES ® NO
If yes,which ones?Eliminated: N/A Added:
NC DWR Pretreatment Compliance Inspection(PCI)Form Updated July 2024 Page 2
Docusign Envelope ID:OE4D9CE5-7366-4lA2-96B3-36919DC8909C
28. PRETREATMENT PROGRAM ELEMENTS REVIEW—Please review POTW files,verify POTW has copy of Program Element in
their files,complete with supporting documents and copy of PERCS Approval Letter,and dates consistent with Program Info:
Program Element Last Submittal Last Approval Date Next Due,
Date In file? Date In file If Applicable
Headworks Analysis(HWA) 08/17/2022 ®Yes ❑ No 10/31/2017 ®Yes❑ No TBD
Industrial Waste Survey IWS 11/22/2021 ®Yes ❑ No 06/28/2022 ®Yes❑ No 06/17/2027
Sewer Use Ordinance SUO 12/02/2011 ®Yes ❑ No 01/03/2012 ®Yes❑ No N/A
Enforcement Response Plan ERP 09/13/2019 ®Yes ❑ No 11/19/2019 ®Yes❑ No N/A
Long Term Monitoring Plan(LTMP) 1 06/15/2020 ®Yes ❑ No 09/14/2020 ®Yes❑ No N/A
INDUSTRIAL USER PERMIT(IUP)FILE REVIEW 3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION
29. User Name 1.Austin Electrical Enclosures 11 2.B&G 3.UNIFI(0005)
30. IUP Number 0006 0004 0005
31. Does File Contain Current Permit? ®Yes ❑ No ®Yes ❑ No ®Yes ❑ No
32. Permit Expiration Date 3/31/2029 5/31/2025 3/31/2029
33. Categorical Standard Applied I.E.40 CFR,Etc. Or N/A 433.15 N/A N/A
34. Does File Contain Permit Application Completed Within One Year Prior ®Yes ❑ No ®Yes ❑ No ®Yes ❑ No
to Permit Issue Date?
35. Does File Contain an Inspection Completed Within Last Calendar Year? I ®Yes ❑ No ®Yes ❑ No ®Yes ❑ No
36. a.Does the File Contain a Slug/Spill Control Plan? a. ®Yes❑No a. NYes ❑No a. ®Yes❑No
b.If No,is One Needed? See Inspection Form from POT b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes[]No®N/A
37. For 40 CFR 413 and 433 TTO Certification,Does File Contain a Toxic ®Yes❑No❑N/A ❑Yes❑No NN/A ❑Yes❑No®N/A
Organic Management Plan TOMP ? 11
38. a.Does File Contain Original Permit Review Letter from the Division? a. NYes❑No a. NYes ❑No a. NYes❑No
b.All Issues Resolved? b.❑Yes[]No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A
39. During the Most Recent Semi-Annual Period,Did the POTW Complete ®Yes ❑ No ®Yes ❑ No ®Yes ❑ No
its Sampling as Required by IUP,including flow?
40. Does File Contain POTW Sampling Chain-Of-Custody Forms? I ®Yes ❑ N=ol ®Yes ❑ No ®Yes ❑ No
41. During the Most Recent Semi-Annual Period,Did the SIU Complete its ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A
Sampling as Required b IUP,includingflow?
41b.During the Most Recent Semi-Annual Period,Did SIU submit all reports ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A
on time?
42a.For categorical IUs with Combined Wastestream Formula(CWF),does ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No NN/A
file includeprocess/dilution flows as Required by IUP?
42b.For categorical IUs with Production based limits,does file include ❑Yes❑No®N/A ❑Yes❑No NN/A ❑Yes❑No NN/A
production rates and/or flows as Required by IUP?
43a. During the Most Recent Semi-Annual Period,Did the POTW Identify ®Yes ❑ No ®Yes ❑ No ®Yes ❑ No
All Limits Non-Compliance from Both POTW and SIU Sampling?
43b. During the Most Recent Semi-Annual Period,Did the POTW Identify ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No NN/A
All Re ortin Non-Com liance from SIU Sampling?
44. a.Was the POTW Notified by SIU(Within 24 Hours)of All Self- a. ®Yes❑No❑N/A a. ®Yes[]No❑N/A a. []Yes❑No®N/A
Monitoring Violations?
b.Did Industry Resample and submit results to POTW Within 30 Days? b.®Yes❑No❑N/A b.®Yes[]No❑N/A b.[]Yes❑No®N/A
c.If applicable,Did POTW resample within 30 days of becoming aware c.®Yes❑No❑N/A
of SIU limit violations in the POTW's sampling of the SIU? c.[]Yes❑No®N/A c.❑Yes[]No®N/A
46. During the Most Recent Semi-Annual Period,Was the SIU in SNC? ❑Yes ❑ No ❑Yes ❑ No I ❑Yes ❑ No
47. During the Most Recent Semi-Annual Period,Was Enforcement Taken ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No NN/A
as Specified in the POTW's ERP NOVs,Penalties,timing,etc.)?
48. Does the File Contain Penalty Assessment Notices? ®Yes❑No❑N/A ❑Yes❑No®N/A ❑Yes❑No NN/A
49. Does The File Contain Proof Of Penalty Collection? ®Yes❑No❑N/A ❑Yes❑No®N/A ❑Yes❑No NN/A
50. a.Does the File Contain Any Current Enforcement Orders? a. ❑Yes❑No®N/A a. ❑Yes❑No®N/A a. ❑Yes❑No®N/A
b.Is SIU in Compliance with Order? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes[]No®N/A
51. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑Yes ® No ❑Yes ® No ❑Yes ® No
Requested Information for You?
NC DWR Pretreatment Compliance Inspection(PCI)Form Updated July 2024 Page 3
Docusign Envelope ID:OE4D9CE5-7366-4lA2-96B3-36919DC8909C
FILE REVIEW COMMENTS:
Files are well organized(both paper and electronic).
INDUSTRY INSPECTION ICIS CODING:
Main Program Permit Number MM/DD/YY
a NI C1 01 01 21 01 31 3 1 81 1 061 141 241
1. Industry Inspected: NO INDUSTRY INSPECTION
2.Industry Address:
3. Type of Industry/Product:
4.Industry Contact: Title:
Phone: Fax:
5.Does the POTW Use the Division Model Inspection Form or Equivalent? ❑YES ❑NO
6.Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly?
Comments:
A. Initial Interview ❑YES ❑NO
B. Plant Tour ❑YES ❑NO
C. Pretreatment Tour ❑YES ❑NO
D. Sampling Review ❑YES ❑NO
E. Exit Interview ❑YES ❑NO
Industrial Inspection Comments:
OVERALL SUMMARY AND COMMENTS:
Comments:_A very well organized and operated pretreatment program.
Requirements:
Recommendations:
NOD: ❑YES ®NO
NOV: ❑YES ®NO
QNCR: ❑YES ®NO
POTW Rating:
Satisfactory Yes Marginal UnSatisfactory
PCI COMPLETED BY: Keyes McGee DATE: 06/14/2024
NC DWR Pretreatment Compliance Inspection(PCI)Form Updated July 2024 Page 4