Loading...
HomeMy WebLinkAboutSW6240202_Emails_20241025 Beeker, Jacob I From: Beeker, Jacob I Sent: Thursday, October 24, 2024 4:55 PM To: Robbie Bell; reeseconstruction@hotmail.com Cc: Joyner, Melissa; svc_post_construction_stormwater Subject: Re: SW6240202; Cotton Farms Phases 2 and 3 (Harnett) Good afternoon, The Division of Energy, Mineral and Land Resources received and accepted a State Stormwater Management Permit Application for the subject project on February 16, 2024, and requested additional information on May 15th, 2024. A review of the file and delivery logs indicates that, as of this date,the information requested on May 15th, 2024, has not been received in this Office within the stipulated timeframe. Per the requirements of Title 15A NCAC 02H .1042(3)(a)(ii)of the Stormwater Management Rules,this Office is hereby returning the subject application as incomplete.The application fee has been forfeited and a new fee will need to be provided if you choose to resubmit this application in the future. The original signed Project Return letter is being mailed to the Applicant, Reese Construction, LLC, at: Reese Construction, LLC Attn: Clint M. Reese,Jr., Member/Manager 3720 Lucky Dr Apex, NC 27539 The previously submitted application materials can either be mailed back to the engineer or recycled,with permission. If a response is not received within seven days,all application materials received will be mailed to the engineer, Kirby R. Bell,Jr., PE, at: Bass, Nixon &Kennedy, Inc. Attn: Kirby R. Bell,Jr., PE 6310 Chapel Hill Rd,Suite 250 Raleigh, NC 27607 Please be aware that the construction of any impervious surfaces on the property prior to receipt of a stormwater permit, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Jacob Beeker(He/Him) Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office:(919) 707-9214 jacob.beekerCcbdeq.nc.gov i Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Beeker,Jacob I <jacob.beeker@deq.nc.gov> Sent:Thursday, October 24, 2024 4:28 PM To: Robbie Bell <Robbie.Bel I@bnkinc.com>; reeseconstruction@hotmail.com <reeseconstruction@hotmail.com> Cc:Joyner, Melissa <melissa.joyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: Re: SW6240202; Cotton Farms Phases 2 and 3 (Harnett) Good afternoon, I received a voicemail regarding submitting a response to a request for additional information on this project on 10/24/2024. Per the correspondence below,additional information was requested on May 15th, 2024.Thirty calendar days were allotted for response,and no additional information was received before June 14th, 2024.As a result,the project was considered incomplete on June 14th, 2024. Per Division policy and the requirements of Title 15A NCAC 02H .1042(3)(a)(ii)of the Stormwater Management Rules,the Application was considered incomplete,and will be returned.The application fee has been forfeited and new fee will need to be provided if you wish to resubmit this Application. An official Project Return email and letter will follow shortly. Jacob Beeker(He/Him) Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office:(919) 707-9214 iacob.beeker(a-)deq.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Farkas,Jim J <Jim.Farkas@deq.nc.gov> Sent:Thursday,June 6, 2024 4:11 PM To: Robbie Bell <Robbie.Bel I@bnkinc.com>; reeseconstruction@hotmail.com <reeseconstruction@hotmail.com> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: RE: SW6240202; Cotton Farms Phases 2 and 3 (Harnett) As of today,June 6, 2024, we have not yet received the items requested on May 15, 2024. Please provide the requested items (both hard and electronic copies) by close of business on June 14, 2024 or the project will be returned due to inactivity. From: Farkas,Jim J Sent:Wednesday, May 15, 2024 3:23 PM 2 To: Robbie Bell <Robbie.Bel I@bnkinc.com>; reeseconstruction@hotmail.com Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: RE: SW6240202; Cotton Farms Phases 2 and 3 (Harnett) Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on February 16, 2024.A review of that information has determined that the application is not complete.Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thanks, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkasCcbdeq.nc.gov D_ E � NORTH CAROLINA kipi Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent: Monday, February 19, 2024 10:52 AM To: Robbie Bell <Robbie.Bel I@bnkinc.com>; reeseconstruction@hotmail.com Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deg.nc.gov> Subject: SW6240202; Cotton Farms Phases 2 and 3 (Harnett) Good Morning, We received your post-construction stormwater permit application for the subject project on 2/16/24. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deg.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last 3 file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW6240202 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstruction@deg.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin Sent: Monday, February 12, 2024 12:25 PM To: Robbie Bell <Robbie.Bel I@bnkinc.com>; reeseconstruction@hotmail.com Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Cotton Farms Phases 2 and 3; Fuquay-Varina, Harnett County Hi Robbie, It should not be locked. You may need to enable macros though. Send me a screenshot if you have further issues with it being locked. Thanks, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov 4 b li;:;A cl ;NORTH CAHOLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Robbie Bell <Robbie.Bel I@bnkinc.com> Sent: Monday, February 12, 2024 11:46 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; reeseconstruction@hotmail.com Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Cotton Farms Phases 2 and 3; Fuquay-Varina, Harnett County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thanks for the quick response Kaitlin. I will check on the various items you listed below. As for the EZ Supplement "Drainage"file the download would not allow me to fill it in. When I tried to fill in the information the form gave me a message that it was "locked", which is the problem I had before so I figured this sheet was not needed. Kirby R(Robbie) Bell,Jr. PE, CPESC robbie.bell@bnkinc.com P: 919.851.4422 D: 919.645.3540 Bass, Nixon & Kennedy, Inc. 6310 Chapel Hill Road, Suite 250 Raleigh, NC 27607 BASS I NIXON 1 KENNEDY bnkinc.com CONSULTING ENGINEERS Serving the Triangle and surrounding areas since 1969 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent: Monday, February 12, 2024 11:35 AM To: Robbie Bell <Robbie.Bel I@bnkinc.com>; reeseconstruction@hotmail.com Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Cotton Farms Phases 2 and 3; Fuquay-Varina, Harnett County Hi Robbie, I have been in meetings this morning and have been unable to respond to phone calls. Emails are the best bet for communication with my workload at the moment. Please see my responses below. 5 Thanks! Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov �E aipeelrtYMN of EniV�unrnentil 4ueidy Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third padies. From: Robbie Bell <Robbie.Bel I@bnkinc.com> Sent: Monday, February 12, 2024 11:23 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; reeseconstruction@hotmail.com Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Cotton Farms Phases 2 and 3; Fuquay-Varina, Harnett County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Kaitlin, I tried to call you this AM to discuss your comments at 919-707-9209 but the call kept dropping. Is this your correct phone number? Please see my responses below in red and then check the plan again possibly and let me know what you find and if we need additional info. Kirby R(Robbie) Bell,Jr. PE, CPESC robbie.bell@bnkinc.com P: 919.851.4422 D: 919.645.3540 Bass, Nixon & Kennedy, Inc. [I] 6310 Chapel Hill Road, Suite 250 Raleigh, NC 27607 BASS I NIXON I KENNEDY bnkinc.com CONSULTING ENGINEERS Serving the Triangle and surrounding areas since 1969 6 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent: Monday, February 12, 2024 9:33 AM To: Robbie Bell <Robbie.Bell@bnkinc.com>; reeseconstruction@hotmail.com Cc: Svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Cotton Farms Phases 2 and 3; Fuquay-Varina, Harnett County My apologies.Two comments were left off. Please see below. From: Peck, Kaitlin Sent: Monday, February 12, 2024 9:30 AM To: Robbie Bell <Robbie.Bel I@bnkinc.com>; reeseconstruction@hotmail.com Cc: Svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deg.nc.gov> Subject: RE: [External] RE: Cotton Farms Phases 2 and 3; Fuquay-Varina, Harnett County Good Morning, We received your application for a new post-construction stormwater permit on 2/6//24. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items by close of business on 2/16/24 so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 1x hard copy of a soils map. We overlaid the soils map onto the existing conditions plan like we provide nearly all plans submitted to Municipalities. I also have a soils map in the report that was taken/printed directly from NRCS The soils overlay is now shown in the existing conditions plan.This layer may not have been included when printed?There additionally is no soils map provided in the submittal information report. • 1x hard copy of the complete, original signed Supplement-EZ Form (This item is required per Sections V&VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. Only the cover page was provided. Please provide the relevant sheets to your project by generating them with macros. Not sure what additional sheets would be needed.This is a Low Density so no SCM's are needed so with "0" being in the EZ Cover/SCM column no additional info would be needed.....1 think.What are on the relevant sheets if a SCM is not needed?There is a low density selection when giving information for the drainage areas.This is still needed. (Does not need to be resigned,just the additional pages filled out and submitted). • 1x original, signed & notarized hard copy of the O&M Agreement Form (This item is required per 15A NCAC 02H .1042(2)(j) and per Sections V &VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete O&M Agreement Form will have 2 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. NOTE: It is recommended to get a second copy of this form signed & notarized for the Applicant's records (it will be helpful when they go to record it with the Register of Deeds). Only the cover page was provided. Please provide the relevant sheets to your project by generating them with macros.The other sheets were included in the submittal which was the Low Density Deed Restrictions and Maintenance....correct? I apologize.The additional pages were first included in the very original submittal without the cover page,then the cover pages was included in the second submission.You can ignore this comment. • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: • Details of roads, sidewalks, drainage features, piped collection systems, and the proposed stormwater controls.This item is required per Section VI 81 of the application. No sidewalks but all this info was on the plans. See sheets C1.2 for the road x-section, C3.1 and C3.2 for the grading and drainage plan and C4.1-C4.7 for road profiles and storm pipe crossings. No controls are needs except for storm pipe velocity dissipator pads which we show the dimensions and calcs.This is a low density subdivision These pages were not included with the submittal. I only have pages C0.1, C0.2, C1.1, C3.1, C3.2, DAS, DA6.Please provide C1.2 and C.4.1-C4.7. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov s i�E D*Mrlffwl of FnvirmEnMal 4uWy Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third padies. From: Robbie Bell <Robbie.Bel I@bnkinc.com> Sent: Monday, February 5, 2024 1:42 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; reeseconstruction@hotmail.com Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: [External] RE: Cotton Farms Phases 2 and 3; Fuquay-Varina, Harnett County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon Kaitlin. I was aware of the date. With the unfortunate elimination of the Fast Track it pretty much requires us to design the entire project of every component in order to provide your Dept. of the detail that a regular submittal requires vs the Fast Track. We spent some extra time trying to perfect the design rather than throwing some drawings and numbers together and submitting. Usually there will be some comments but I hope that the plans we have produced will shorten your review and the number of review cycles. I proofed a final set of complete plans this AM and my tech is making those red line revisions now. I hope to send out tomorrow. Thanks, Kirby R(Robbie) Bell,Jr. PE, CPESC robbie.bell@bnkinc.com P: 919.851.4422 D: 919.645.3540 Bass, Nixon & Kennedy, Inc. 6310 Chapel Hill Road, Suite 250 Raleigh, NC 27607 BASS I NIXON 1 KENNEDY bnkinc.com CONSULTING ENGINEERS Serving the Triangle and surrounding areas since 1969 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Monday, February 05, 2024 11:55 AM To: reeseconstruction@hotmail.com; Robbie Bell <Robbie.Bel I@bnkinc.com> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, 9 Melissa <melissa.ioyner@deq.nc.gov> Subject: RE: Cotton Farms Phases 2 and 3; Fuquay-Varina, Harnett County Good Morning, An additional information submittal is due to our office by the EOD, 2/9/24. Where are you in sending this in? Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov 4. �E oe" m l of G %*5_anemal QmIey Email correspandence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third padies. From: Peck, Kaitlin Sent:Wednesday,January 10, 2024 12:58 PM To: reeseconstruction@hotmail.com; Robbie Bell <Robbie.Bel I@bnkinc.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: Cotton Farms Phases 2 and 3; Fuquay-Varina, Harnett County Good Afternoon, We received your application for a new post-construction stormwater permit on 1/9/24. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 2/9/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • Please be aware that, effective October 1, 2023, the Fast-Track permitting option has been eliminated (The Fast- Track option is still available for those projects that have filed their Fast-Track application on or before the effective date). For this project, you will need to apply for post-construction stormwater coverage through the Standard permitting option. • 1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section 12.14(e)(2)): • Please be aware that, effective October 3, 2023, our permit application fee structure is as follows: • New Permit or Major Modification for a project with one (1) or fewer SCMs=$1,000 10 • New Permit or Major Modification for a project with two (2) SCMs=$1,250 • New Permit or Major Modification for a project with three (3) SCMs=$1,750 • New Permit or Major Modification for a project with four(4) or more SCMs= $2,250 • Minor Modification =$250 • Renewal =$750 • Transfer=$750 • Renewal &Transfer Combination =$1,500 • General Permit=$700 • Per the submittal items, this project will require an application fee of$1000 as this application is for a New Permit for a Project with less than 1 SCM. Please provide a new application fee check in this amount so that we may process your application. We will void and return the provided application fee check to the permittee(unless a different return address is indicated by close of business tomorrow). • 2x hard copies of the Standard Process Application (This item is required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application). • 1x hard copy of the complete, original signed Supplement-EZ Form (This item is required per Sections V&VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. • 1x original, signed & notarized hard copy of the O&M Agreement Form (This item is required per 15A NCAC 02H .1042(2)(j) and per Sections V &VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete O&M Agreement Form will have 2 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. NOTE: It is recommended to get a second copy of this form signed & notarized for the Applicant's records (it will be helpful when they go to record it with the Register of Deeds). • 2x hard copies (one original) of the deed restriction document(This item is required per 15A NCAC 02H .1003(7), 15A NCAC 02H .1042(2)(k), and Sections VI, 2 &VII). More information can be found on our website: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/post-construction-program/post-construction-forms • 1x hard copy of the stormwater narrative.This item is required per 15A NCAC 02H .1042(2)(a)(vi) and per Section VI, 5 of the Application. • 1x hard copy of a USGS topographic map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within % mile of the site boundary, include the% mile radius on the map.This item is required per 15A NCAC 02H .1042(2)(d) and per Section VI, 6 of the Application. • 1x hard copy of sealed, signed, and date calculations relevant to the application's project.This item is required per 15A NCAC 02H .1040(2)(f) and per Section VI, 7 of the application. • 1x hard copy of a map. • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: 11 • A Location/Vicinity Map.The 2 major roads identified in the directions to the site provided in Section LIV of the application should now be shown on the vicinity map on the plans as well as any other roads, and distances to those intersections. We encourage the consultant to list both the local street name and the NCSR number, if there is one. • Existing site conditions.This item is required per Section VI, 8k&8n of the Application and 15A NCAC 02H .1042(2)(g)(v). • Grading plan that outlines proposed contours and drainage patterns.This item is required by 15A NCAC 02H .1042(2)(g)((iv) &(v)). • Details of roads, sidewalks, drainage features, piped collection systems, and the proposed stormwater controls.This item is required per Section VI 81 of the application. NOTE: I am still waiting on your plan sheets from Phase 1 to be brought to my office from the regional office in order to confirm there is no overlap between the phases. If there is, I will reach out to you. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, 12 Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov 4 :�E NA DKurtrwA of EnrlrwwmnWI&mMy Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third gad es. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 13