HomeMy WebLinkAboutWQ0045921_Application (FTSE)_20241021 Luckman, Debbie
From: Luckman, Debbie
Sent: Tuesday, October 22, 2024 9:52 AM
To: waiter@laniermgmt.com
Cc: Eagle PC's
Subject: Leacroft S/D
Acknowledgement of Complete Application Received
This email is acknowledgment that your Fast Track Sewer Extension (FTSE) permit application for Leacroft has
been received by the Mooresville Regional Office on October 21, 2024.An administrative review was conducted,
and the permit application is deemed complete. Per 15A NCAC 02T.0107(2)(e), "If an application is accepted and
later found to be incomplete,the applicant shall be advised how the application or accompanying supporting
information may be modified to make it complete.The staff shall advise the applicant."As of the date of this
email, per Session Law 2024-49 Senate Bill 166 (Section 4.3),the 45-daytechnical review period has started. If
additional information is deemed necessary,the date of the additional information request will pause the 45-day
review technical review period.Additional information must be received within 30 days of the date of the request,
or the application will be returned to the applicant, however the fee will.not be returned. If you have any questions
regarding the permit, please reference the following application number(WQ0045921.When sending
correspondences regarding your FTSE permit please include the application number in the subject line.
Deborah Luckman
Administrative Assistant, Mooresville Regional Office,
Division of Environmental Assistance and Customer Service
North Carolina Department of Environmental Quality
Office: (704) 235-2111
Debbie.Iuckman@deg.nc.gov
1
Luckman, Debbie
From: Luckman, Debbie
Sent: Wednesday, October 16, 2024 9:51 AM
To: walter@laniermgmt.com
Subject: Leacroft
Attachments: Leacroft-10162024.pdf
Acknowledgment of Incomplete Application Received
This email is acknowledgment that your Fast Track Sewer Extension (FTSE) permit application Leacroft has been
received by the Mooresville Regional Office on October 15, 2024.An administrative review was conducted, and the
permit application is deemed incomplete. Please review the attached checklist for items that are missing from the
permit application. Per Session Law 2024-49 Senate Bill 166 (Section 4.3), information needed for a complete
permit application must be submitted within 30 days of this email or the application will be returned to the
applicant, however the fee will not be returned.
Attached to this email is an electronic copy of the application form and supporting documents submitted. Once
you have obtained the necessary information, please submit a scanned PDF of the co-mptate application to
complete the administrative review. For ease of review, please do not submit individual pieces of information.You
will be notified via email once a complete application form and supporting documents has been received. When
sending correspondences regarding your FTSE permit application please include the project name in the subject
Line.
• The Developers Operational Agreement is on an outdated form. Form 12/23 is the current form to be used.
• An email address for the Engineer was not entered on the application,
Thankyou
Deborah Luckman
Administrative Assistant, Mooresville Regional Office,
Division of Environmental Assistance and Customer Service
North Carolina Department of Environmental Quality
Office: (704) 235-2111
Debbie.Iuckman@deg.nc.gov
EAGLE ENGINEERING
REC i' ED/NGDE- WR
Creating Communities.Together.
i
2013-A Van Buren Avenue VIVA S
Indian Trail,NC 28079 MOORE UE RE NAL OFFICE
(704)882-4222 phone/(866)775-0329 fax
www.eagleonline.net
Letter of Transmittal
Date: 10/14/2024
Attention: Water Quailty Selection EEI Job Number: 60641ECENEDiNCt?EQ/DWE
610 E.Center Avenue Re: Leacroft O C T 1021
Mooresville, North Carolina 28115
W Q-RC)S
_ Y ,.. FFICE
Delivered by: ❑ Hand ❑✓ UPS ❑ Mail ❑ Fedex El Other
❑ Courier
We are transmitting the following items:
✓❑ Prints ✓❑ Copy of Letter ❑ Specifications ❑✓ Application ❑ Mylars ❑✓ Report
❑ Plans ❑ Shop Drawings ❑ Calculations ❑ As Builts ✓❑ Check ❑✓ Other
No. Date Copies Items to be Transmitted
1 10/14/2024 2 FTA 10-23
2 10/14/2024 2 Utility Plans-2024-09-25
3 1 10/14/2024 1 Fast Track Cover Letter
4 10/14/2024 1 Fee Check#43645($600.00)
5 10/14/2024 1 Secretary of State,Aerial Exhibit, USGS TOPO
6 10/14/2024 1 FTSE 10-23/USB/DEV 03-19
These are transmitted as checked below:
✓❑ For Approval ❑✓ For Review ❑ Approved as Submitted
❑ For Your Use ❑ Corrected Prints ❑ Approved as Noted
❑ As Requested ❑ Copies for Distribution ❑ Copies for Approval
Remarks:
Please let me know once you received this submittal at pc@eagleonline.net, thank you!
Note: Unless revision block states "Released,for Construction", all plans enclosed are to be considered
"Prelimincn• "and "Not for Construction", and are 2rovided for 2ermitting, information and bidding use onl .
Cc: File
S igned: Kq3/ schmat
EAGLE ENGINEERING
��� REGEiVED�NCDEQiDkNR
: ��
WGW�W.w-
�.
Creating Communities.Together.
`NQ.POS
MOORESV.LLE REGIONAL OFFICE
Leacroft—City of Mount Holly, Gaston County, NC
Fast Track Application Cover Letter
Package includes one hard copy&one digital copy of the following items:
• Cover Letter
• Application Fee Check($600.00)
• Fast Track Application (FTA 10-23)
• NC Secretary of State Documentation
• Flow Tracking/Acceptance Form (FTSE 10-23)
• USGS Topographic Map
• Street Level Aerial Map
• Developers Operational Agreement (DEV 03-19)
• Utility Plans (24"x36")
Project Narrative:
• The proposed development of Leacroft is located in the City of Mount Holly, Gaston
County, NC and includes 81 3-bedroom &814-bedroom single-family detached homes.
• The City of Mount Holly follows 15A NCAC 02T.0114(b)to allocate 75 GPD per
bedroom. The total flow allocated for this project is 42,525 GPD.
• The proposed project consists of a public 8" sanitary sewer extension totaling 6,745 LF
with 45 manholes, within 50' public right-of-way or 30' public sewer easement. The
proposed system is designed to convey 100% domestic sanitary sewer to the City of
Mount Holly existing 15" sanitary sewer main traveling southwest along Dutchman's
Creek.
• Please address all comments and questions to Kayle Schmidt at pc@eagleonline.net.
www.eagleonline.net
2013-A Van Buren Avenue
Indian Trail,NC 28079
Ph 704 882 4222
Fax 866 775 0329
State of North Carolina
Department of Environmental Quality
Division of Water Resources
DW
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23&SUPPORTING DOCUMENTATION
� 59a Application Number: (to be completed by DwR) RECEIVED/NCDEO/DWR
All items must be completed or the application will be returned
OCT 2 : _q24
I. APPLICANT INFORMATION: WOROS
MOORESVILLE REGIONAL OFFICE
1. Applicant's name: Lanier/van Sickle Construction Services,Inc(company,municipality,HOA,utility,etc.)
2. Applicant type: ❑Individual ® Corporation ❑General Partnership ❑ Privately-Owned Public Utility
❑Federal ❑ State/County ❑ Municipal ❑Other
3. Signature authority's name:Robert E.Lanier per 15A NCAC 02T.0106(b)
Title:Vice President
4. Applicant's mailing address: PO Box 1028
City: Pineville State:NC Zip:28134-
5. Applicant's contact information:
Phone number:(704)726-8000 Email Address:walter(c,laniermgmt.com
11. PROJECT INFORMATION:
1. Project name: Leacroft
2. Application/Project status: ® Proposed(New Permit) ❑ Existing Permit/Project ❑ ARPA funded
If a modification,provide the existing permit number: WQ00 and issued date: ,
For modifications,also attach a detailed narrative description as described in Item G of the checklist.
If new construction,but part of a master plan,provide the existing permit number: WQ00
3. County where project is located:Gaston
4. Approximate Coordinates(Decimal Degrees): Latitude: 35.33926' Longitude:-80.99896'
5. Parcel ID(if applicable): 304155 (or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
I. Professional Engineer: Matthew C.Kirchner,PE License Number: 045509
Firm:Eagle Engineering, Inc.
Mailing address: PO Box 2935
City:Indian Trail State:NC Zip:28079-
Phone number: (704)882-4222 Email Address:pcalea,leonline.net
IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION:
1. Facility Name:City of Mount Holly W WTP Permit Number:NCO021 156
Owner Name:City of Mount Holly
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s): WQ
2. Downstream(Receiving)Sewer Information: 15 inch ® Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s)(if applicable): WQCS
Owner Name(s):
FORM: FTA 10-23 Page I of 5
State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23&SUPPORTING DOCUMENTATION
Application Number: (to be completed by DwR) FIECEiVED/NCDEQ/DWR
All items must be comMeted or the apNication will be returned 0 C T 15 2024
I. APPLICANT INFORMATION: WOROS
MOORESVILLE REGIONAL OFFICE
l. Applicant's name: Lanier/van Sickle Construction Services.Inc(company,municipality,HOA,utility,etc.)
2. Applicant type: ❑ Individual ®Corporation ❑General Partnership ❑Privately-Owned Public Utility
❑Federal ❑ State/County ❑Municipal ❑Other
3. Signature authority's name: Robert E.Lanier per 15A NCAC 02T.0106(b)
Title: Vice President
4. Applicant's mailing address:PO Box 1028
City:Pineville State:NC Zip:28134-
5. Applicant's contact information:
Phone number:(704)726-8000 Email Address:walter n,laniermemt.com
II. PROJECT INFORMATION:
1. Project name:Leacroft
2. Application/Project status: ®Proposed(New Permit) ❑Existing Permit/Project ❑ARPA funded
If a modification,provide the existing permit number:WQ00 and issued date: ,
For modifications,also attach a detailed narrative description as described in Item G of the checklist.
If new construction,but part of a master plan,provide the existing permit number: WQ00
3. County where project is located:Gaston
4. Approximate Coordinates(Decimal Degrees):Latitude: 35.33926' Longitude:-80.99896'
5. Parcel ID(if applicable): 304155(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
l. Professional Engineer: Matthew C.Kirchner,PE License Number:045509
Firm: Eagle Engineering,Inc.
Mailing address: PO Box 2935
City: Indian Trail State:NC Zip:28079-
Phone number:(704)882-4222 Email Address:
IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION:
1. Facility Name:City of Mount Holly W WTP Permit Number:NCO021156
Owner Name:City of Mount Holly
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s): WQ
2. Downstream(Receiving)Sewer Information: 15 inch ® Gravity O Force Main
3. System Wide Collection System Permit Number(s)(if applicable):WQCS
Owner Name(s):
FORM: FTA 10-23 Page I of 5
VI. GENERAL REQUIREMENTS
l. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
[:]Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM:DEV)been attached?
®Yes ❑No ❑N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement(FORM: HOA)and
supplementary documentation as required by 15A NCAC 02T.0115(c)been attached?
❑Yes ❑No ®N/A
4. Origin of wastewater:(check all that apply):
®Residential(Individually Owned) ❑ Retail(stores,centers,malls) ❑ Car Wash
❑ Residential(Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School/preschool/day care ❑ Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse
❑ Food and drink facilities ❑ Church
❑ Swimming Pool/Filter Backwash
❑Businesses/offices/factories ❑Nursing Home ❑Other(Explain in Attachment)
5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial,is there a Pretreatment Program in effect?❑Yes❑No
6. Has a flow reduction been approved under 15A NCAC 02T.0114(f)? ❑Yes ®No
➢ If yes,arovide a cony of flow reduction ammoval letter with this annlication
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0114(f)) Daily Design Flow Ab No. of Units Flow
3 bedroom single family detached homes 75 gal/bedroom 81 18,225 GPD
4 bedroom single family detached homes 75 gal/bedroom 81 24,300 GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
Total 42,525 GPD
a See 15A NCAC 02T.0114(b), (d).(e)(1)and(e)(2) for caveats to wastewater design flow rates(i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4).
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data.
8. Wastewater generated by project:42,525 GPD(per 15A NCAC 02T.0114 and G.S. 143-215.1)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero,please indicate why:
❑Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑Flow has already been allocated in Permit Number: Issuance Date:
❑Rehabilitation or replacement of existing sewers with no new flow expected
❑Other(Explain):
FORM: FTA 10-23 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305&MDC(Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size(inches) Length (feet) Material
8 5,775 SDR 35 PVC
8 970 DIP
➢ Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Pumt)Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED fN THIS PROJECT
I. Pump station number or name:
2. Approximate Coordinates(Decimal Degrees): Latitude: 0 Longitude:- °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length (feet) Material
If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per
MDCPSFM Section 2.01C.1.b.❑Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify)
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
❑ Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 3 of 5
IX. SETBACKS&SEPARATIONS—(02B.0200& 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(f)&(g)? ®Yes [:]No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
ZWater mains(vertical-water over sewer preferred, including in benched trenches) 18 inches
ZWater mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
**Any private or public water supply source,including any wells,WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
**Waters classified WS(except WS-I or WS-V),B,SA,ORW,HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
**Any other stream, lake,impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(f)or(g).see Section X.1 of this application
*15A NCAC 02T.0305(e)contains alternatives where separations in 02T.0305(f)cannot be achieved.Please check"yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webuaee
2. Does this project comply with the minimum separation requirements for water mains? ®Yes []No ❑N/A
➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ❑Yes ❑No ®N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ®Yes Basin name:Catawba ❑No
If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 027B.0200? ®Yes ❑No
➢ This includes Trout Buffered Streams per 15A NCAC 213.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑Yes ®No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ®Yes ❑No
Per 15A NCAC 02T.0105(c)(6),directly related environmental permits or certification applications must be being prepared,
have been applied for,or have been obtained.Issuance of this permit is contingent on issuance of dependent permits(erosion
and sedimentation control plans,stormwater management plans,etc.).
7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑Yes ®No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes,include an attachment with details for each line,including type(aerial line,size,material,and location).
High priority lines shall be inspected by the permittee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit.
FORM: FTA 10-23 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with A, ;= i,the ?,lin;_ ;m De,i<_m Criteria for til: ('env ,
n c �1ain_ a and the: ��� r. r ,,�;n C_ritcria(latest vc,,ion i as applicable?
®Yes ❑No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit and oroiects requiring a variance approval may be subject to longer
review times.For protects requiring two or more variances or where the variance is determined by the Division to be a
shmilicant portion of the Proiect the full technical review is required
2. Professional Engineer's Certification:
1> � -emeie�'�=,-i �?A ,attest that this application for 1*Py arr
(Professional Engmecr's name-from Application Item 111.1.) (Project Name from Application Item iI.I)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
i eskur and the _
ation _: Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation.Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board.(21 NCAC 56.0701)
.................................................................................
North Carolina Professional Engineer's seal,signature,and date: \�CAR i
A.-,SSS10*-
0<CL
SEAL
045509 =
`.............. o
3. Applicant's Certification per 15A NCAC 02T.0106(b):
attest that this application for �c?RG✓o��
(Signature Authority Name from Application Item 1.3.) (Project Name from Application Item 11.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. i understand that any
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes and '! c;, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties tip to$25,000 per violation.
r Date: 01310��
FORM: FTA 10-23 Page 5 of 5
STATE OF NORTH CAROLINA ��,
COUNTY OF Gaston Permit No. `t I
DEVELOPER'S OPERATIONAL AGREEMENT
This AGREEMENT made pursuant to G.S. 143-215.1 (d1) and entered into this day of
, 2024 , by and between the North Carolina Environmental Management
Commission, an agency of the State of North Carolina,hereinafter known as the COMMISSION; and -
Lanier/van Sickle Construction Services, Inc. , a corporation/general partnership registered/licensed to do
business in the State of North Carolina,hereinafter known as the DEVELOPER.
WITNESSETH:
1. The DEVELOPER is the owner of the certain lands lying in Gaston County, upon
which it is erecting and will erect dwelling units and other improvements,said development to beknown
as Leacroft (hereinafter the Development).
2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater,treatment
works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve
the Development on said lands.
3. The DEVELOPER has applied to the COMMISSION for the issuance of a pen-nit pursuant to G.S. 143-
215.1 to construct, maintain,and operate the Disposal System.
4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements
and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration),pursuant to Chapter
47C or 47F of the North Carolina General Statutes.
5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the
Declaration, Leacroft Homeowners Association (hereinafter
Association),a non-profit corporation organized and existing under and by the virtue of the laws of the State
of North Carolina, for the purpose, among others, of handling the property, affairs and business of the
Development; of operating, maintaining, re-constructing and repairing the common elements of the lands
and improvements subject to unit ownership, including the Disposal System; and of collecting dues and
assessments to provide funds for such operation,maintenance,re-construction andrepair.
5. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed,
maintained and operated in accordance with law and permit provisions in order to protect the quality of the
waters of the State and the public interest therein.
NOW,THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties
hereto,the COMMISSION and DEVELOPER do hereby mutually agree as follows:
1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and
specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate
and maintain such systems and facilities in accordance with applicable permit provisions andlaw.
2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association
until construction has been completed in accordance with the permit and approved plans, and the staff of
the Division of Water Resources has inspected and approved of the facilities. In order to change the name
of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The
request must include a copy of the Association Bylaws andDeclaration.
3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for
the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's
successor.
FORM: DEV 12-23 Page 1 of 2
4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and
appurtenances thereto are part of the common elements and shall thereafter be properly maintained and
operated in conformity with law and the provisions of the permit for construction, operation, repair, and
maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater
treatment, collection and disposal system as a common element which will receive the highest priority for
expenditures by the Association except for Federal, State, and local taxes and insurance.
5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will
be maintained out of the common expenses. In order to assure that there shall be funds readily available to
repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses,
the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses.
Such fund shall be separate frorn the routine maintenance funds allocated for the facility and shall be part
of the yearly budget.
6. In the event the common expense allocation and separate fund are not adequate for the construction, repair,
and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special
assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and
the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any
time.
7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city,
town, village, county, water and sewer authorities, or other unit of government shall hereinafter become
available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the
existing and future wastewater of the Development to be accepted and discharged into said governmental
system, and shall convey or transfer as much of the Disposal System and such necessary easements as the
governmental unit mayrequire as condition of accepting the Development's wastewater.
8. Recognizing that it would be contrary to t11e public interest and to the public health, safety and welfare for
the Association to enter into voluntary dissolution without having made adequate provision for the continued
proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the
Association Bylaws that the Association shall not enter into voluntary dissolution without first having
transferred its said system and facilities to some person, corporation or other entity acceptable to and
approved by the COMMISSION by the issuance of apermit.
9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any
permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and
operation of the Disposal System.
10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is
filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the
Association.
IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized
representative of the parties hereto on the day and year written as indicated by each of the parties named below:
Lanier an ruction ices, Inc.
N _—�
Michael Montebello G' �(Si 7 ' '
Supervisor, NPDES Branch Chief
Division of Water Resources
Robert Eric L
Prin n _
(Date) -ram
FORM: DEV 12-23 Page 2 of?-
4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and
appurtenances thereto are part of the common elements and shall thereafter be properly maintained and
operated in conformity with law and the provisions of the permit for construction, operation, repair, and
maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater
treatment, collection and disposal system as a common element which will receive the highest priority for
expenditures by the Association except for Federal, State, and local taxes and insurance.
5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will
be maintained out of the common expenses. In order to assure that there shall be funds readily available to
repair,maintain or construct the Disposal System, beyond the routine operation and maintenance expenses,
the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses.
Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part
of the yearlybudget.
6. In the event the common expense allocation and separate fund are not adequate for the construction, repair,
and maintenance of the Disposal System,the Declaration and Association Bylaws shall provide for special
assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and
the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any
time.
7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city,
town, village, county, water and sewer authorities, or other unit of government shall hereinafter become
available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the
existing and future wastewater of the Development to be accepted and discharged into said governmental
system, and shall convey or transfer as much of the Disposal System and such necessary easements as the
governmental unit mayrequire as condition of accepting the Development's wastewater.
8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for
the Association to enter into voluntary dissolution without having made adequate provision for the continued
proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the
Association Bylaws that the Association shall not enter into voluntary dissolution without first having
transferred its said system and facilities to some person, corporation or other entity acceptable to and
approved by the COMMISSION by the issuance of apermit.
9. The agreements set forth in numbered paragraphs 1, 2, 3,4, 5, 6, 7, and 8 above shall be conditions of any
permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and
operation of the Disposal System.
10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies)where the Declaration is
filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the
Association.
IN WITNESS WHEREOF,this agreement was executed in duplicate originals by the duly authorized
representative of the parties hereto on the day and year written as indicated by each of the parties named below:
FOR THE ENVIRONMENTAL Lanier/v n Sickle Construction Services, Inc.
MANAGEMENT COMMISSION Name of
S. Daniel Smith i re)
Director, Division of Water Resources -
Robert Eric Lanier, Vice President
Print Name and Title
/r110-TI
(Date) (Date)
FORM: DEV 03-19 Page 2 of 2
State of North Carolina
Department of Environmental Quality
Division of Water Resources
DlvIsIon of Water liesomces Flow Tracking for Sewer Extension Applications
(FTSE 10-23)
Entity Requesting Allocation: Lanier/van Siclde Construction Services,Inc.
Project Name for which flow is being requested: Leacroft
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: City of Mount Holly WWTP
b. WWTP Facility Permit#: NCO021156
All flows are in MGD
c. WWTP facility's permitted flow 4.000
d. Estimated obligated flow not yet tributary to the WWTP 0.080
e. WWTP facility's actual avg.-flow - - — — - --1.920- - -
f. Total flow for this specific request 0.040
g. Total actual and obligated flows to the facility 1.960
h. Percent of permitted flow used 49%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Firm Daily Flow** Current Tributary Flow Plus
(Name or Permit Capacity,* (Firm/pf), Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow,MGD MGD Flow Capacity***
Dutcbman's Creek 5.760 1.646 1.190 0.080 1.270 0.376
*The Firm Capacity(design flow)of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
**Design Average Daily Flow is the f rin capacity of the pump station divided by a peaking factor(pf)not
less than 2.5,per Section 2.02(A)(4)(c)of the Minimum Design Criteria.
***A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is<0.
Downstream Facility Name(Sewer):
Downstream Permit Number:
Page 1 of 6
FTSE 10-23
III. Certification Statement:
I Robert Stewart certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party., Signature of this form certifies that the receiving collection system or treatment
work has ad ate capac ty t transport and treat the proposed new wastewater.
Signing Of icia Signature D to
14164 // gie's
Title of Si Zing Official
Page 2 of 6
PTSE 10-23
PLANNING ASSESSMENT ADDENDUM(PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is<0.
Pump Station(Name or Number):
Given that:
a. The proportion and amount of Obligated,Not Yet Tributary Daily Flow(C)accounts for
%and MGD of the Available Capacity(E)in Pump Station
;and that
b. The rate of activation of this obligated,not yet tributary capacity is currently approximately
MGD per year;and that
e. A funded Capital Project that will provide the required planned capacity,namely
is in design or under construction with
planned completion in ;and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over-allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
Signing Off cial Signature Date
Page 3 of 6
FTS> 10-23
Instructions for Flow Tracking form(FTSE;)and Planning Assessment Addendum(PAA)
Section I
a. WWTP Facility Name: Enter the naive of the WWTP that will receive the wastewater flow.
b. WWTP Facility Permit#: Enter the NPDES or Non-Discharge number for the WWTP receiving the
wastewater flow.
c. WWTP facility's permitted flow MGD: From WWTP owner's NPDES or Non-Discharge permit.
d. Estimated obligated flow not yet t i utary to the WWTP MGD: This includes flows allocated to other
construction projects not yet contributing flow to the collection system. Flows allocated through interlocal
agreements or other contracts not yet contributing flow to the collection system are also included, For POTWs
that implement a pretreatment program,include flows allocated to industrial users who may not be using all of
their flow allocation.Please contact your Pretreatment Coordinator for information on industrial flow tributary
to your WWTP.
As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and
reconciled their flow records,to the best of their ability,so it is known how much flow has been obligated and
is not yet been made tributary to the WWTP,in accordance with local policies and procedures employed by the
reporting entity.
e. WWTP facility's actual avg. flow,MGD: Previous 12 month average.
f Total flow for this specific request MGD: Enter the requested flow volume.
g. Total actual and obligated flows to the facility,MGD Equals [d+e+f]
h. Percent of 12cnnitted flow used: Equals [(g/c)*100]
For example:
On January 15 a POTW with a permitted flow of 6.0 MGD,reported to the Regional Office that there is 0.5
MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD,There is a
proposed flow expansion of 0.015 MGD.
The first Form FTSE submitted after January 15,2008 may have numbers like this:
c. = 6.0 MGD
d. = 0.5 MGD
e. = 2.7 MGD
f. = 0.015 MGD
g. = 3.215 MGD
h. = 53.6
The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD:
c. = 6.0 MGD
d. = 0.515 MGD
e. = 2.73 MGD
f. =0.4 02 MGD
g. = 3.349 MGD
h. = 55.8 %
Each subsequent FTSE form will be updated in the same manner.
Page 4 of 6
FTSE 1Q-23
Section II
List the pump station name or number and approximate pump station firm capacity, approximate design average
daily flow(A) approximate current average daily flow(B), and the obligated, not yet tributary flow through the
pump station(C)for each pump station that will be impacted by the proposed sewer extension project. Calculate
the total current flow plus obligated flow(D=B+C)and the available capacity(E=A-D). Include the proposed flow
for this project with other obligated flows that have been approved for the pump station but are not yet tributary
(C).
Finn capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the
Minimum Design Criteria,
Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(pf)of not less than
2.5.
If the available capacity(E)for any pump station is<0,then prepare a planning assessment for that pump station
if the system has future specific plans related to capacity that should be considered in the permitting process.
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Obligated,
Design Approx. Not Yet Total Current j
Firm Average Current Avg. Tributary Flow Plus !
Pump Station Capacity Daily Flow Daily Flow, Daily Flow, Obligated Available
(Name or Number) MGD (Firm/pf) MGD MGD Flow Capacity*
Kaw Crock PS 0.800 0.320 0.252 0.080 0.332 -0.012
Valley Road PS 1.895 0.758 0.472 0.135 0.607 0.151
Page 5 of 6
FTSE 1.0-23
Planning Assessment Addendum Instructions
Submit a planning assessment addendum for each pump station listed in Section IT where available capacity is<0,
A planning assessment for Kaw Creek PS(see example data above)may be performed to evaluate whether there is
significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating
the flows from the proposed sewer extension project.
If the system decides to accept the flow based on a planning assessment addendum,it is responsible to manage the
flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control
the rate of flow to prevent sanitary sewer overflows.
The planning assessment may identify a funded project currently in design or construction,or a planned project in
the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the
certainty of successful timely project completion for any expansion,flow management diversion or infiltration and
inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance
compliance,
For example:
Given that:
a. The proportion and amount of obligated,not yet tributary flow accounts for 24%and 0.080 MGD of the
committed flow in Pump Station Kaw Creek;and that
b. The rate of activation of this obligated,not yet tributary capacity is currently approximately 0,01 MGD
per year;and that
c, A fimded capital project that will provide the required plaimed capacity,namely
completion in
is in design or under construction with planned
; and/or
d. The following applies:
The master plan and ten Year capital plan contain recommended scone and funding for a capital Project entitled
Kaw Creek Plump Station upgrade with funding planned in July 2014. This ro'ect is lanned to add 0.100 MGD
to the firm capacity of the Pmp station by October 2015 Inclusion of this proposed capital proiect as a condition
of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this roject's )Tiority for
finding and construction to be implemented ahead of the activation of obligated,not yet tributary flows in amounts
that exceed the firm pump station capacities identified in Section II above
Therefore:
Given reasonably expected conditions and planning information,there is sufficient justification to allow this flow
to be permitted,without a significant likelihood of over-allocating capacity in the system infrastructure.
Page 6 of 6
FTSE 10-23
111
110110d,
`p.� mow.
rj�!
dC
Plan
�� � �n,,�,-,. ,�>I^
. u ;NUM .
'i '��'���� ^ t �� ��/,y.�—� 'cad � •�-. �, �������/�,� ,-s"' ��
IS ♦
10,01
��� JV' �� �•I\\Lw`�_1�����Y�1��...� ram. ��. [NIY GM:, rim �/� S: � I���I��
FA
All
l I
MOW
�%�4ui£ I ✓r.CSa'.�� f � ,;� may(
? w T .�� � e� '1-901i
ONE
nun - .
6064 - Leacroft - Street Map
,fir;S����t=A•w��• I L.. r;�, �l
L►� �VslG �nb� `♦j ���0 � '•�'
,►d � c "
caE'►►►►A��►r1�o ��
yyy R qaN a i
"5QZY
il�Je
',• �`� ,� +III^'GJc l�,� �,,�Il► L,LA•TIPOCK'CEME(P��
® d lrlllrr arrrE�es�'�j��� �
CA202309500752
SOSiD:0309393
Date Filed:4/5/2023
Elaine F.Marshall
BUSINESS CORPORATION ANNUAL REPOI North Carolina Secretary of State
�h.•:
CA2023 095 00752
NAME OF BUSINESS CORPORATION: Lanier/van Sickle Construction Services, nc.
0309393 Filing Office Use Only
SECRETARY OF STATE ID NUMBER: STATE OF FORMATION: NC
REPORT FOR THE FISCAL YEAR END: 2022 0 ,❑■
W R X
SECTION A:REGISTERED AGENT'S INFORMATION M Changes
1.NAME OF REGISTERED AGENT: Robert E. Lanier
2.SIGNATURE OF THE NEW REGISTERED AGENT:
SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT
3.REGISTERED AGENT OFFICE STREET ADDRESS&COUNTY 4.REGISTERED AGENT OFFICE MAILING ADDRESS
12825 Downs Circle PO Box 1028
Pineville, NC 28134 Mecklenburg Pineville, NC 28134 Mecklenburg
SECTION B:PRINCIPAL OFFICE INFORMATION
1.DESCRIPTION OF NATURE OF BUSINESS: Construction
2.PRINCIPAL OFFICE PHONE NUMBER: (704) 587-3024 3.PRINCIPAL OFFICE EMAI 11
Privacy Redaction
4.PRINCIPAL OFFICE STREET ADDRESS 5.PRINCIPAL OFFICE MAILING ADDRESS K
12825 Downs Circle PO Box 1028
Pineville,NC 28134 Mecklenburg Pineville,NC 28134 Mecklenburg
6.Select one of the following if applicable.(Optional see Instructions)
❑ The company is a veteran-owned small business
The company is a service-disabled veteran-owned small business
SECTION C:OFFICERS(Enter additional officers in Section E.)
NAME: Robert E. Lanier NAME: William Van Sickle NAME:
TITLE: Vice President TITLE: President TITLE:
ADDRESS: ADDRESS: ADDRESS:
7028 Old Dairy Lane 2328 Bain Farm Rd
Charlotte, NC 28211 Mecklenburg Charlotte,NC 28227 Mecklenburg It
SECTION ANNUAL REPORT. S n D mus ompleted in its entir b on/business
6NATU DAT
ed by an officer listed under Section C of this form.
Robert E. Lanier Vice President
Print or Type Name of Officer Print or Type Title of Officer
SUBMIT THIS ANNUAL REPORT WITH THE REQUIRED FILING FEE OF$25
MAIL TO:Secretary of State, Business Registration Division,Post Office Box 29525,Raleigh,NC 27626-0525
State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources INSTRUCTIONS FOR FORM: FTA 10-23&SUPPORTING DOCUMENTATION
This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been
certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's
Minimum Design Criteria(Gravi, Sewer&Pump Stations/Force Mains)and that plans,specifications and supporting documents
have been prepared in accordance with 15A NCAC 02T.15A NCAC 02T.0300,Division policies,and P-ood engineering practices.
While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design
documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design
calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These
documents shall be immediately available upon request by the Division.
Projects that are deemed permitted(do not require a permit from the Division)are explained in 15A NCAC 02T.0303.
Projects not eligible for review via the fast track process(must be submitted for full technical review):
➢ Projects that do not meet any part of the minimum design criteria(MDC)documents;
➢ Projects that involve more than one variance from the requirements of 15A NCAC 02T;
➢ Pressure sewer systems utilizing simplex septic tank-effluent pumps(STEPs)or simplex grinder pumps;
➢ Simplex STEP or simplex grinder pumps connecting to pressurized systems(e.g.force mains);
➢ Vacuum sewer systems.
General—When submitting an application,please use the following instructions as a checklist in order to ensure all required items are
submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the
amount of requested additional information. Failure to submit all required items will necessitate additional processing and review
time,and may result in return of the application. Unless otherwise noted,the Applicant shall submit one original and one copy of
the application and supporting documentation.
A. One Original and One Copy(second copy may be digital)of Application and Supporting Documents
® Required unless otherwise noted. Signatures on original must be"wet ink"or secure digital signatures.
Please do not submit engineering design plans with the application unless specifically requested.
B. Cover Letter/Narrative Description(Required for All Application Packages):
® List all items included in the application package,as well as a brief description of the requested permitting action.
➢ Be specific as to the system type,number of homes served,flow allocation required,etc.
➢ Include the permit number/status of any other required sewer permits(downstream/upstream)
➢ If necessary for clarity,include attachments to the application form.
➢ If the project is funded by American Rescue Plan Act(ARPA) funds, please include the ARPA project number in the cover
letter and in parentheses under Project Name(Section II.1.of the application).
C. Application Fee(All New and Modification Application Packages):
® Submit a check or money order in the amount of$600.00,dated no more than 90 days prior to application submittal.
➢ Payable to North Carolina Department of Environmental Quality(NCDEQ)
D. Fast Track Application(Required for All Application Packages,Form FTA 10-23):
® Submit the completed and appropriately executed application.
➢ If necessary for clarity or due to space restrictions,attachments to the application may be made.
® If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the
North Carolina Secretary of State.
❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a,enclose a copy of the certificate filed with the Register of Deeds in
the county of business.
® The Project Name in Item 11.1 shall be consistent with the project name on the flow acceptance letters,agreements,etc.
® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina
licensed Professional Engineer.
INSTRUCTIONS FOR FORM:FTA 10-23&SUPPORTING DOCUMENTATION Pagel of 3
® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T.0106(b). Per
15A NCAC 02T.0106(c),an alternate person may be designated as the signing official if a delegation letter is provided from
a person who meets the criteria in 15A NCAC 02T.0106(b).
E. Flow Tracking/Acceptance Form(Form: FTSE 10-23)(If Applicable):
® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility.
➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different.
➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year
prior to the application date.
➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a).
➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project-specific FTSE.
F. Site Maps(All Application Packages):
® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area,
including the closest surface waters.
➢ General location of the project components(gravity sewer,pump stations,&force main)
➢ Downstream connection points and permit number(if known)for the receiving sewer
® Include an aerial location map showing general project area(such as street names or latitude/longitude)so that Division staff
can easily locate it in the field.
G. Existing Permit(Application Packages for Modifications to an Existing Permit):
❑ Submit a copy of the most recently issued existing permit.
❑ Include a descriptive and clear narrative identifying the previously permitted items to remain in the permit,items to be
added,and/or items to be modified(the application form itself should include only include items to be added/modified).The
narrative should also include whether any previously permitted items have been certified.
❑ The narrative should clearly identify the requested permitting action and accurately describe the sewers to be listed in
the final permit.
If. Power Reliability Plan(Required if portable reliability option utilized for Pump Station):
❑ Per 15A NCAC 02T.0305(h)(1),submit documentation of power reliability for pumping stations.
➢ This alternative is only available for average daily flows less than 15,000 gallons per day
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with
the station. The Division will accept a letter signed by the applicant(see 15A NCAC 02T .0106(b))or proposed contractor,
stating that"the portable power generation unit or portable, independently-powered pumping units,associated appurtenances
and personnel are available for distribution and operation of this pump station."
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'
storage capacities and the rotation schedule of the portable power source or pump,including travel timeframes,shall
be provided in the case of a multiple station power outage.(Required at time of certification)
1. Certificate of Public Convenience and Necessity(All Application Packages for Privately-Owned Public Utilities):
❑ Per 15A NCAC 02T.0115(a)(1)provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities
Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer
extension,or
❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application
for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval
is expected.
J. Operational Agreements(Applications from HOA/POA and Developers for lots to be sold):
❑ Home/Property Owners' Associations
❑ Per 15A NCAC 02T.0115(c),submit the properly executed Operational Agreement(FORM: HOA).
❑ Per 15A NCAC 02T.0115(c),submit a copy of the Articles of Incorporation,Declarations and By-laws.
® Developers of lots to be sold
® Per 15A NCAC 02T.0115(b).submit the properly executed Operational Agreement(FORM:DEV).
For more information, visit the Division's collection systems website
INSTRUCTIONS FOR FORM: FTA 10-23&SUPPORTING DOCUMENTATION Page 2 of 3
THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND
MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE:
REGIONAL OFFICE ADDRESS COUNTIES SERVED
Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee,
Water Quality Section Swannanoa, North Carolina 28778-8211 Clay, Graham, Haywood, Henderson, Jackson,
(828)296-4500 Macon, Madison, McDowell, Mitchell, Polk,
(828)299-7043 Fax Rutherford, Swain, Transylvania, Yancey
Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke,
Water Quality Section Fayetteville, North Carolina 28301-5095 Montgomery, Moore, Robeson, Richmond,
(910)433-3300 Sampson, Scotland
(910)486-0707 Fax
Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland,
Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan,
(704)663-1699 Stanly, Union
(704)663-6040 Fax
Raleigh Regional Office 3800 Barrett Drive Chatham, Durham, Edgecombe, Franklin,
Water Quality Section Raleigh, North Carolina 27609 Granville, Halifax,Johnston, Lee, Nash,
(919)791-4200 Northampton, Orange, Person, Vance,Wake,
(919)571-4718 Fax Warren,Wilson
Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven,
Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde,
(252)946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank,
(252)975-3716 Fax Perquimans, Pitt, Tyrrell,Washington, Wayne
Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New
Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender
(910)796-7215
(910)350-2004 Fax
Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson,
Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph,
Winston-Salem, North Carolina 27105 Stokes, Surry,Watauga,Wilkes, Yadkin
(336)776-9800
(336)776-9797 Fax
INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 3 of 3
State of North Carolina
Department of Environmental Quality
•°'
Division of Water Resources
DWR
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23&SUPPORTING DOCUMENTATION
Application Number: (to be completed by DWR)
All items must be completed or the application will be returned
1. APPLICANT INFORMATION:
1. Applicant's name: Lanier/van Sickle Construction Services,Inc(company,municipality,HOA,utility,etc.)
2. Applicant type: ❑ Individual ®Corporation ❑General Partnership ❑Privately-Owned Public Utility
❑Federal ❑ State/County ❑Municipal ❑Other
3. Signature authority's name: Robert E.Lanier per 15A NCAC 02T.0106(b)
Title: Vice President
4. Applicant's mailing address:PO Box 1028
City: Pineville State:NC Zip:28134-
5. Applicant's contact information:
Phone number:(704)726-8000 Email Address:walter(@,laniermgmt.com
H. PROJECT INFORMATION:
I. Project name:Leacroft
?. Application/Project status: ®Proposed(New Permit) ❑Existing Permit/Project ❑ARPA funded
If a modification,provide the existing permit number:WQ00 and issued date:
For modifications,also attach a detailed narrative description as described in Item G of the checklist.
If new construction,but part of a master plan,provide the existing permit number: WQ00
3. County where project is located:Gaston
4. Approximate Coordinates(Decimal Degrees):Latitude: 35.33926' Longitude:-80.99896°
5. Parcel ID(if applicable): 304155(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
I. Professional Engineer: Matthew C.Kirchner,PE License Number:045509
Firm:Eagle Engineering,Inc.
Mailing address:PO Box 2935
City: Indian Trail State:NC Zip:28079-
Phone number:(704)882-4222 Email Address:
IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION:
1. Facility Name:City of Mount Holly WWTP Permit Number:NCO021156
Owner Name:City of Mount Holly
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s):WQ
2. Downstream (Receiving)Sewer Information: 15 inch ® Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s)(if applicable):WQCS
Owner Name(s):
FORM:FTA 10-23 Page I of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
❑Yes [:]No ®N/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM:DEV)been attached?
®Yes ❑No ❑N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement(FORM:HOA)and
supplementary documentation as required by 15A NCAC 02T.0115(c)been attached?
❑Yes ❑No ®N/A
4. Origin of wastewater:(check all that apply):
®Residential(Individually Owned) ❑Retail(stores,centers,malls) ❑Car Wash
❑Residential(Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑School/preschool/day care ❑ Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse
❑Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment)
5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial,is there a Pretreatment Program in effect?❑Yes❑No
6. Has a flow reduction been approved under 15A NCAC 02T.0114(f) ❑Yes ®No
➢ If yes,provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0114(f)) Daily Design Flow Ab No.of Units Flow
3 bedroom single family detached homes 75 gal/bedroom 81 18,225 GPD
4 bedroom single family detached homes 75 gal/bedroom 81 24,300 GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
Total 42,525 GPD
a See 15A NCAC 02T.0114(b).(d).(e)(1)and(e)(2) for caveats to wastewater design flow rates(i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4).
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.01141 shall be
determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data.
8. Wastewater generated by project:42,525 GPD(per 15A NCAC 02T.0114 and G.S. 143-215.1)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑Other(Explain):
FORM: FTA 10-23 Page 2 of 5
V11. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305& MDC(Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size(inches) Length(feet) Material
8 5,775 SDR 35 PVC
8 970 DIP
➢ Section II& III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VII1. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Puma Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
l. Pump station number or name:
2. Approximate Coordinates(Decimal Degrees):Latitude: 0Longitude:- °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length (feet) Material
If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per
MDCPSFM Section 2.01C.l.b. ❑Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify)
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
❑ Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B).
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 3 of 5
IX. SETBACKS&SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(fl&(g)? ®Yes ❑No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
'Water mains(vertical-water over sewer preferred, including in benched trenches) 18 inches
'Water mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
**Any private or public water supply source,including any wells,WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
**Waters classified WS(except WS-I or WS-V),B,SA,ORW,HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
**Any other stream, lake,impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(fl or(g),see Section X.1 of this application
*15A NCAC 02T.0305(e)contains alternatives where separations in 02T.0305(f)cannot be achieved.Please check"yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpa¢e
2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑No ❑N/A
➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ❑ Yes ❑No ®N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ®Yes Basin name:Catawba ❑No
If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ®Yes ❑No
➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑Yes ®No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ®Yes ❑No
Per 15A NCAC 02T.0105(c)(6),directly related environmental permits or certification applications must be being prepared,
have been applied for,or have been obtained.Issuance of this permit is contingent on issuance of dependent permits(erosion
and sedimentation control plans,stormwater management plans,etc.).
7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑Yes ®No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes,include an attachment with details for each line,including type(aerial line,size,material,and location).
High priority lines shall be inspected by the permittee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit.
FORM: FTA 10-23 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with the
and the ;1 rig latC.il_v as applicable',
®Yes ❑ No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit and projects requiring a variance approval may be subject to longer
review times.For protects requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the protect the full technical review is required
2. Professional Engineer's Certification:
1, *&MC_-�1c.Re �?,—tom- ,attest that this application for L&y*e&!c
(Professional I ngmccr's name from Application item III.I.) (Project Name from Application Item❑.I)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. i further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
and the
Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials tender my signature and seal signifies that i have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE - In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a tine not to exceed$10,000,as well as civil penalties up to$25,000 per violation.Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board.(21 NCAC 56.0701)
....................................................
North Carolina Professional Engineer's seal,signature,and date: \\� µtCARp4��
�i
a SEAL •
045509 -
•• ho
3. Applicant's Certification per 15A NCAC 02T.0I06(b):
attest that this application for 46ac-t-
(S;gnaturc Aulhority Name from Application Item 1.3.) (Project Name from Application Item If.I)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. i understand that any
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE - In accordance with General Statutes and any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation.
, igrf tr
Date:
FORM: FTA 10-23 ~�`
Page 5 of 5
10/22/24,8:42 AM North Carolina Secretary of State Search Results
• File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online
Add Entity to My Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print
an Amended a Annual Report form
Business Corporation
Legal Name
Lanier Site Services, Inc.
Information
Sosld: 0515024
Status: Current-Active O
Date Formed: 12/22/1999
Citizenship: Domestic
FiscaL Month: December
Annual Report Due Date: April 15th
CurrentAnnuaL Report Status:
Registered Agent: Lanier, Robert Eric
Addresses
Principal Office Reg Office Reg Mailing Mailing
12825 Downs Circle 12825 Downs Circle 12825 Downs Circle PO Box 1028
Pineville, NC 28134 Pineville, NC 28134 Pineville, NC 28134 Pineville, NC 28134
Officers
President
Robert E Lanier
7028 Old Dairy
Charlotte NC 28211
Stock
https://www.sosnc.gov/online_services/search/Business_Registration_Results 1/2