Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC233756_NOT Closeout Documents_20241024 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481
County: Lenoir Project: Dollar General Deep Run River basin: Neuse
Person financially responsible:Glandon Forest Equity,LLC-George T Barnes, Project#: LENOI-2024-004
Owner/Manager
Address: 3825 Barrett Dr, Suite 100,Raleigh,NC 27609
1. Project Location: 3300 Hwy 11,Trent Township
Pictures: No
2. Weather and soil conditions: Sunny,warm,dry Initial inspection: no
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No one onsite Title:
Inspection report: Gave Report Date given/sent: Sept 12,2024
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-
inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES
10. Comments: General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Bradley West Others present:
Date of inspection: Sept 10,2024 Time arriving on site: 12:15 PM Time leaving site: 12:30 PM
cc: NCC233756