HomeMy WebLinkAbout20160156 Ver 1_USACE Permit_20160218U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW -2016-00331 County: Rockingham U.S.G.S. Quad: NC -SOUTHEAST EDEN
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Duke Energy
Attn: Steve Cahoon
Address: 410 S. Wilmington Street
Raleigh, NC 27601
Size (acres) —0.5 Nearest Town Eden
Nearest Waterway Dan River River Basin Upper Dan
USGS HUC 03010103 Coordinates 36.491589 N, -79.711634 W
Location description: This project is located at the Duke Energy Dan River Steam Station, along the Dan River, directly below
the secondary Ash Basin in the southeastern corner of the station property, in Eden, Rockingham County, North Carolina.
Description of projects area and activity: This project involves the permanent discharge of fill material into 270 linear feet (0.06
acre) of the Dan River, necessary to rebuild and stabilize an actively eroding bank directly below the berm for an existing ash
basin.
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 13 Bank Stabilization.
SEE ATTACHED NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
conditions and your submitted application and attached information dated and received 2/15/2016 via email. Any violation of
the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration
order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case-by-case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Quality (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact David Bailey at 919-554-4884 extension 30 or David.E.Bailey2C&usace.army.mil.
oigitany,19,W by
BNILEY DNVIDEI3]9283>3fi
ON: c=US, o=US.GOvernmem, Ou=DOD,
1 1 oO BA ou=USA,
3736
Corps Regulatory Official: cn=fI2016..02.18 E.13),285W Date: 2/18/2016
Oate:2016.02.1809:90:11 -0500'
Expiration Date of Verification: 3/18/2017
Copy furnished:
Sue Homewood, NCDENR-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105
John Ellis, USFWS, P.O. Box 33726, Raleigh, NC 27636-3726
SAW -2016-00331 Special Conditions:
A waiver from Nationwide Permit 13 requirement (c) is granted such that this activity may exceed an
average of one cubic yard per running foot placed along the bank below the plane of the ordinary high
water mark.
2. Note that Regional Condition 4.1.3 cannot apply in this case given that the project will involve rebuilding
a river bank waterward of its current location.
Corps Regulatory Official:
Expiration Date of Verification: 03/18/2017
Digitally signed by
BAILEY.DAVID.E.1379283736
ou=-US, —U.S. Government,
DoD, ou=PKI, ou=USA,
cn=6AI LEY.DAVID.E.1379283736
Date: 2016.02.18 09:40:37 -05'00'
Date: 2/18/2016
Determination of Jurisdiction:
A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above described project
area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process
( Reference 33 CFR Part 331).
B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
C. ® There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of
Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations,
this determination may be relied upon for a period not to exceed five years from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference
jurisdictional determination issued _. Action ID: _.
Basis For Determination: The proiect area exhibits water bodies with ordinary high water. The water bodies on the site
include the Dan River, a Traditionally Navigable Water. This determination is based on an office verification by David E.
Bailey (USAGE) on 2/18/2016.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B
and C above).
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 10M 15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.**
G Digit ally Signedby BAILEY.DAVID.-D.D,2 PKI
DN: r=US, .-U.S. Govemmen[, ou=DoD, ou=Plfl, -USA,
MlCorps Regulatory Official. G D-20EYDA1809.41:00-3J36
Date: 2016.02.18 09:41:00 -05'00'
David Bailey
Date: February 18, 2016 Expiration Date: February 18, 2021
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete our customer Satisfaction Survey online at hllp://corpsmgpu.usace.gM.mil/cm apex/f?p=136:4:0.
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Duke Energy (attn.: Steve Cahoon) File Number: SAW -2016-00331 Date: February 18, 2016
Attached is: See Section below
F-11 INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A
❑ PROFFERED PERMIT Standard Permit or Letter ofpermission) B
❑ PERMIT DENIAL C
® APPROVED JURISDICTIONAL DETERMINATION D
❑ PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPennits.aspx
or the Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division
Mr. Jason Steele, Administrative Appeal Review Officer
attn: David E. Bailey
CESAD-PDO
Raleigh Regulatory Field Office
U.S. Army Corps of Engineers, South Atlantic Division
3331 Heritage Trade Drive, Suite 105
60 Forsyth Street, Room 1OM15
Wake Forest, North Carolina 27587
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunit to participate in all site investi ations.
Date:
Telephone number:
Signature of appellant oragent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: David Bailey, 69 Darlington Avenue, Wilmington, North Carolina
28403
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal
Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
Action ID Number: SAW -2016-00331 County: Rockingham
Permittee: Duke Energy (attn.: Steve Cahoon)
Project Name: Duke Energy - Dan River Steam Station / secondary ash basin bank stabilization /
Eden / Rockingham County / industrial
Date Verification Issued: February 18, 2016
Project Manager: David Bailey
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
attn: David E. Bailey
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee
Date